China factories

China factory - ZNLS ENGINEERING CO., LTD.

ZNLS ENGINEERING CO., LTD.

  • China,Beijing ,Beijing
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Lightweight Aluminum Trusses Table Formwork , Permanent Formwork For Concrete
China Lightweight Aluminum Trusses Table Formwork , Permanent Formwork For Concrete

  1. China Lightweight Aluminum Trusses Table Formwork , Permanent Formwork For Concrete

Lightweight Aluminum Trusses Table Formwork , Permanent Formwork For Concrete

  1. MOQ: 25 tons
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms 30%TT, Balance against copy of BL
Supply Ability 400 to 500 tons per month
Delivery Time 14 to 21 days after deposit
Packaging Details In bundle or pallets, or by customer demands
Material Aluminum beam, Timber beam, Aluminum truss, Plywood
Supporting system Aluminum truss
Application Concrete construciton-Cast in place slab
Assemble and disassemble Operated once, reusable in different sections, Integral movement
Size Modular size or Project-specific design
Outstanding feature Light but strong, can form large area slab
Brand Name ZNLS
Model Number S-TF
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms 30%TT, Balance against copy of BL Supply Ability 400 to 500 tons per month
Delivery Time 14 to 21 days after deposit Packaging Details In bundle or pallets, or by customer demands
Material Aluminum beam, Timber beam, Aluminum truss, Plywood Supporting system Aluminum truss
Application Concrete construciton-Cast in place slab Assemble and disassemble Operated once, reusable in different sections, Integral movement
Size Modular size or Project-specific design Outstanding feature Light but strong, can form large area slab
Brand Name ZNLS Model Number S-TF
Place of Origin China
High Light Load Bearing ScaffoldingTable Formwork System

Table formwork - flying-3 - It is a large preassembled formwork and falsework unit

 

Overview

 

The assembled table formwork units are rolled into position and the joints sealed. Reinforcement is fixed and the concrete for the slab is cast. Once the concrete has achieved sufficient strength, the complete table is lowered, rolled out from under the slab and moved by crane to the next position. A table form/flying form is a large preassembled formwork and falsework unit, often forming a complete bay of a suspended floor slab.

 

Characteristics

 

1. Lightweight aluminum trusses and joists maximize crane reach.

2. Fast – generally a table can be stripped, flown and reset in about 15 to 20 minutes depending on job site conditions.

3. Repetitive nature of the work makes it easier to plan construction activities.

 

Value-added Service

 

ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Trading Company

  • Year Established:

    2014

  • Total Annual:

    10000000-12000000

  • Employee Number:

    100~150

  • Ecer Certification:

    Active Member

Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...

+ Read More

Get in touch with us

  • Reach Us
  • ZNLS ENGINEERING CO., LTD.
  • Building 3, CCT Center, Chaoyang District, Beijing, China
  • http://www.formworkscaffoldingsystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement