| Payment Terms | 30%TT, Balance against copy of BL |
| Supply Ability | 1000m2/day |
| Delivery Time | 14 to 21 days after deposit |
| Packaging Details | In bundle or pallets, or by customer demands |
| Material: | Steel Pipe Q235 |
| OEM: | Yes |
| Application: | For Bracing Wall Formwork |
| Type: | Panel Strut |
| Height: | Customized Sizes |
| Application | Supporing wall form panel |
| Brand Name | ZNLS |
| Model Number | PANEL STRUT |
| Certification | ISO9001-2008 |
| Place of Origin | China |
View Detail Information
Explore similar products
High Efficient Wall Formwork System Green Formwork System OEM / ODM Available
Professional Curved Wall Formwork , Shuttering For Concrete Walls Reusable
Flexible Retaining Wall Formwork , Metal Formwork For Concrete W-H20
Easily Assembled Wall Formwork System Steel Frame / ABS Coating Plywood Material
Product Specification
| Payment Terms | 30%TT, Balance against copy of BL | Supply Ability | 1000m2/day |
| Delivery Time | 14 to 21 days after deposit | Packaging Details | In bundle or pallets, or by customer demands |
| Material: | Steel Pipe Q235 | OEM: | Yes |
| Application: | For Bracing Wall Formwork | Type: | Panel Strut |
| Height: | Customized Sizes | Application | Supporing wall form panel |
| Brand Name | ZNLS | Model Number | PANEL STRUT |
| Certification | ISO9001-2008 | Place of Origin | China |
| High Light | Wall Shuttering System ,Steel Formwork System | ||
Adjustable Panel Strut for Plumbing and Bracing Wall Formwork When Erection
The panel strut (also called “Push-pull brace) enables the initial positioning of the formwork panels for strait and curved walls, for plumbing and bracing concrete wall forms, column forms, and many other construction applications where strong, rigid bracing elements are required.
It also provides stability until permanent structural connections are completed and lateral stability of the building or structure is established.
Advantages:
1. Wide range of height adjustment.
2. Customized sizes are available for special applications.
3. Left hand & right hand shoulder nuts are equipped for easily adjusting length.
4. Very simple connection to steel walings and fixing on ground.
![]()
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2014
Total Annual:
10000000-12000000
Employee Number:
100~150
Ecer Certification:
Active Member
Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...
Get in touch with us
Leave a Message, we will call you back quickly!