China factories

China factory - ZNLS ENGINEERING CO., LTD.

ZNLS ENGINEERING CO., LTD.

  • China,Beijing ,Beijing
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Vertical Wall Formwork System Composed With H20 Beams , Steel Walings , Plywood
China Vertical Wall Formwork System Composed With H20 Beams , Steel Walings , Plywood

  1. China Vertical Wall Formwork System Composed With H20 Beams , Steel Walings , Plywood
  2. China Vertical Wall Formwork System Composed With H20 Beams , Steel Walings , Plywood

Vertical Wall Formwork System Composed With H20 Beams , Steel Walings , Plywood

  1. MOQ: 25 tons
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms 30%TT, Balance against copy of BL
Supply Ability 1000m2/day
Delivery Time 14 to 21 days after deposit
Packaging Details In bundle or pallets, or by customer demands
Material: H20 Beam, Steel Waling, Panel Strut
OEM: Yes
Application: For Shear Wall And Column
Type: Vertical Wall Formwork
Supporting: By Panel Strut
Wall Height: Upto 6m
Brand Name ZNLS
Model Number PANEL STRUT
Certification ISO9001-2008
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms 30%TT, Balance against copy of BL Supply Ability 1000m2/day
Delivery Time 14 to 21 days after deposit Packaging Details In bundle or pallets, or by customer demands
Material: H20 Beam, Steel Waling, Panel Strut OEM: Yes
Application: For Shear Wall And Column Type: Vertical Wall Formwork
Supporting: By Panel Strut Wall Height: Upto 6m
Brand Name ZNLS Model Number PANEL STRUT
Certification ISO9001-2008 Place of Origin China
High Light Wall Shuttering SystemSteel Formwork System

Vertical Wall Formwork Systems Composed With H20 Beams, Steel Walings, Plywood

Timber beam H20, steel waling, plywood and clamp etc.. These components can be combined for all shapes, even with the restructuring of wall formwork units when a frequent change of the building structure plans happens.

The formwork panels can be assembled in different widths and heights, depending on the H20 beam length up to 6.0m.

 

Advantages:
1. The wall formwrok system is used for all types of walls and columns, with high rigidity and stability at low weight.
2. Can choose whichever form face material best meets your requirements - e.g. for smooth fair-faced concrete.
3. Depending on the concrete pressure required, the beams and the steel waling are spaced closer or apart. This ensures optimum form-work design and the greatest economy of materials.
4. Can be pre-assembled on site or before arrival at site, saving time, cost and spaces.
5. Can match well with most Euro formwork systems, like Doka, Peri, Ulma, etc.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Trading Company

  • Year Established:

    2014

  • Total Annual:

    10000000-12000000

  • Employee Number:

    100~150

  • Ecer Certification:

    Active Member

Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...

+ Read More

Get in touch with us

  • Reach Us
  • ZNLS ENGINEERING CO., LTD.
  • Building 3, CCT Center, Chaoyang District, Beijing, China
  • http://www.formworkscaffoldingsystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement