| Payment Terms | 30%TT, Balance against copy of BL |
| Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit |
| Packaging Details | In bundle or pallets, or by customer demands |
| Raw material | Q235 Steel Pipe |
| Finishing: | Electric Galvanized |
| Application | Vertical load bearing |
| Size: | Prop 30-350 |
| Adjustment type | By thread and regulating holes |
| Auxiliary | Tripod |
| Brand Name | ZNLS |
| Model Number | post shore |
| Place of Origin | China |
View Detail Information
Explore similar products
Lightweight Shoring Scaffolding Systems High Loads Carrying Capacity
Safety Hanging Scaffolding Systems / Cantilever Scaffolding System Steel Tube
Shoring Scaffolding Systems Cuplock System Scaffolding Painted / Galvanized
Easily Assembled Shoring Scaffolding Systems , Frame Scaffolding System
Product Specification
| Payment Terms | 30%TT, Balance against copy of BL | Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit | Packaging Details | In bundle or pallets, or by customer demands |
| Raw material | Q235 Steel Pipe | Finishing: | Electric Galvanized |
| Application | Vertical load bearing | Size: | Prop 30-350 |
| Adjustment type | By thread and regulating holes | Auxiliary | Tripod |
| Brand Name | ZNLS | Model Number | post shore |
| Place of Origin | China | ||
| High Light | Concrete Shoring Systems ,Tubular Scaffolding System | ||
High Capacity Post Shore of 3.5 m for Supporting Decking Formwork Systems
The high load capability makes ZNLS props the top choice offering reliability and safety for any construction job.
Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props, which result in safe and efficient use on sites.
The manufacture of Telescopic Props is certified in accordance with standard EN 1065.
Important Instructions:
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.
![]()
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2014
Total Annual:
10000000-12000000
Employee Number:
100~150
Ecer Certification:
Active Member
Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...
Get in touch with us
Leave a Message, we will call you back quickly!