| Payment Terms | 30%TT, Balance against copy of BL |
| Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit |
| Packaging Details | In bundle or pallets, or by customer demands |
| Raw Material | Q235, Q345 Steel Pipe |
| Surface treatment | Natural |
| OEM: | Available |
| Minimum Order Quantity: | One 20ft container |
| Standard: | EN1065 |
| Application | For Table Form And Post Shoring Slab |
| Brand Name | ZNLS |
| Model Number | ZNLS PROP |
| Certification | ISO9001-2008 |
| Place of Origin | China |
View Detail Information
Explore similar products
Lightweight Shoring Scaffolding Systems High Loads Carrying Capacity
Safety Hanging Scaffolding Systems / Cantilever Scaffolding System Steel Tube
Shoring Scaffolding Systems Cuplock System Scaffolding Painted / Galvanized
Easily Assembled Shoring Scaffolding Systems , Frame Scaffolding System
Product Specification
| Payment Terms | 30%TT, Balance against copy of BL | Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit | Packaging Details | In bundle or pallets, or by customer demands |
| Raw Material | Q235, Q345 Steel Pipe | Surface treatment | Natural |
| OEM: | Available | Minimum Order Quantity: | One 20ft container |
| Standard: | EN1065 | Application | For Table Form And Post Shoring Slab |
| Brand Name | ZNLS | Model Number | ZNLS PROP |
| Certification | ISO9001-2008 | Place of Origin | China |
| High Light | Concrete Shoring Systems ,Tubular Scaffolding System | ||
Adjustable telescopic steel props for slab formwork construction and post shoring
Steel prop is an important scaffolding component of ZNLS formwork system, especially in the slab formwork. With the prop’s high loading capacity, low weight and stability, ZNLS slab formwork works safely and efficiently on site as well as cost-effective. Also, the prop is fast and easy for handling on site.
Advantages:
1. High quality steel tubes ensures its high loading capacity.
2. Various finishing are available, such as: hot-dipped galvanization, cold galvanization, powder coating and painting.
3. Special design prevents the operator from hurting his hands between the inner and outer tube.
4. The inner tube, pin and adjustable nut are designed protected against unintentional disengagement.
5. With the same size of the plate and base plate, the prop heads are easily to insert in the inner tube and outer tube.
6. The strong pallets ensure the transportation easily and safely.
![]()
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2014
Total Annual:
10000000-12000000
Employee Number:
100~150
Ecer Certification:
Active Member
Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...
Get in touch with us
Leave a Message, we will call you back quickly!