| Payment Terms | T/T |
| Supply Ability | 50K pieces per month |
| Delivery Time | 15 days |
| Packaging Details | 500pcs per bag, 20000pcs per carton |
| Item Name | thermal fuse, thermal cutoff, thermal link |
| Part No. | G4A01 |
| Voltage Rating | 250V |
| Current Rating | 10A |
| Tf | 66~240 Degree |
| Mounting Type | axial leaded |
| Blow Type | One shot operation |
| Case Type | Metal |
| UL Listed | Yes |
| RoHS Compliant | Yes |
| Halogen free | Yes |
| MPQ | 500pcs |
| MOQ | 5000pcs |
| Brand Name | Microtemp |
| Model Number | G4A01 |
| Certification | UL VDE PSE CCC |
| Place of Origin | China |
View Detail Information
Explore similar products
UMI TAM 250V 1A Thermal Cutoff Fuse Links K1F 86C K2F 102C K3F 115C K4F 127C
UMI TAM T6D 9A 50V Thermal Cutoff Fuse Links For Battery Protection
UMI TAM 1A 250V Temperature Fuse T0F 76C T1F 86C T2F 102C T3F 115C T4F 127C T7F
UMI TAM 1A 1.5A 2A 250V Thermal Cutoff Fuse T1X 86C T2X 102C T9X 126C T7X 145C
Product Specification
| Payment Terms | T/T | Supply Ability | 50K pieces per month |
| Delivery Time | 15 days | Packaging Details | 500pcs per bag, 20000pcs per carton |
| Item Name | thermal fuse, thermal cutoff, thermal link | Part No. | G4A01 |
| Voltage Rating | 250V | Current Rating | 10A |
| Tf | 66~240 Degree | Mounting Type | axial leaded |
| Blow Type | One shot operation | Case Type | Metal |
| UL Listed | Yes | RoHS Compliant | Yes |
| Halogen free | Yes | MPQ | 500pcs |
| MOQ | 5000pcs | Brand Name | Microtemp |
| Model Number | G4A01 | Certification | UL VDE PSE CCC |
| Place of Origin | China | ||
| High Light | 10A Thermal Fuse Links 250V ,TCO Thermal Fuse Links ,1mm Lead Dia Thermal Fuse Links | ||
G4A01 thermal link Long Leads Microtemp TCO Fuse for Temperature Protection
MICROTEMP Thermal Cutoffs are designed for thermal protection as electrical cut off
Product Description
| Item | thermal fuse, thermal cutoff, thermal link |
| Body Tyle | Metal |
| Lead Dia | 1mm |
| Lead Length | see table 3 |
| Current Rating | 10A@250VAC |
| Mounting Type | axial leaded |
| Body Dia | 4mm |
| Body Length | 14.7mm |
| Certifications | UL VDE |
Specification
| Tf ºC | G4A01 | Th ºC | Tm ºC |
| 72 | G4A01072C | 57 | 100 |
| 73 | G4A01073C | 58 | 100 |
| 77 | G4A01077C | 62 | 300 |
| 84 | G4A01084C | 69 | 220 |
| 91 | G4A01091C | 76 | 300 |
| 93 | G4A01093C | 78 | 300 |
| 98 | G4A01098C | 83 | 300 |
| 104 | G4A01104C | 89 | 200 |
| 110 | G4A01110C | 95 | 240 |
| 117 | G4A01117C | 102 | 240 |
| 121 | G4A01121C | 106 | 300 |
| 125 | G4A01125C | 110 | 185 |
| 128 | G4A01128C | 113 | 205 |
| 134 | G4A01134C | 119 | 205 |
| 141 | G4A01141C | 126 | 205 |
| 144 | G4A01144C | 129 | 300 |
| 152 | G4A01152C | 137 | 205 |
| 158 | G4A01158C | 143 | 240 |
| 167 | G4A01167C | 152 | 210 |
| 172 | G4A01172C | 157 | 310 |
| 184 | G4A01184C | 169 | 240 |
| 190 | G4A01190C | 175 | 350 |
| 192 | G4A01192C | 177 | 210 |
| 205 | G4A01205C | 190 | 310 |
| 216 | G4A01216C | 200 | 450 |
| 229 | G4A01229C | 200 | 450 |
| 240 | G4A01240C | 200 | 450 |
| 257 | G4A01257C | 220 | 470 |
Dimension
![]()
Leads length can be customized
Electrical Ratings
| Series | G4 | G5 | |
| Agency | Resistive | Inductive | Resistive |
| UL/CSA | 21A/240VAC | 8A/250VAC | 20A/250VAC |
| 10A/250VAC | 14A/120VAC | 25A/120VAC | |
| 15A/120AC | 21A/240VAC | ||
| 5A/24VDC | 20A/277VAC | ||
| VDE | 10A/250VAC | 8A/250VAC | 20A/250VAC |
| CCC | 5A/24VDC | 8A/250VAC | 20A/250VAC |
| 10A/250VAC | |||
| PSE JET | 10A/250VAC | 15A/250VAC | |
Standard Package
500pcs per bag, 20000pcs per carton
Shipping Term:
EXW, DDU, DDP, C&F, FOB
Shipping Methods:
International Express, By Air, By Sea
G4A01 thermal link Long Leads Microtemp TCO Fuse for Temperature Protection
G4A01 thermal link Long Leads Microtemp TCO Fuse for Temperature Protection
Company Details
Business Type:
Manufacturer,Seller
Year Established:
1999
Total Annual:
3,000,000-5,000,000
Employee Number:
130~150
Ecer Certification:
Verified Supplier
Founded in 1999, we have been focused on manufacturing over-current, over-temperature and other circuit protection components. Our main products include fuses, fuse holders, thermal switches, circuit breakers and temperature sensors, which are widely used in various kinds of electroni... Founded in 1999, we have been focused on manufacturing over-current, over-temperature and other circuit protection components. Our main products include fuses, fuse holders, thermal switches, circuit breakers and temperature sensors, which are widely used in various kinds of electroni...
Get in touch with us
Leave a Message, we will call you back quickly!