Payment Terms | T/T |
Supply Ability | per customer's mass requirement |
Delivery Time | one week |
Packaging Details | plastic film wrapped, and packed in a carton box |
Steel | 4130 or P20, Harden steel |
Process | CNC milling, wire cutting, EDM |
Data | correspond to cusotmer's CAD |
Surface | comply with 2D print |
Intent | functional test |
Lead time | 7 days to 10 days |
Design format | IGES, prt. step |
Incoterm | FOB |
Brand Name | Gennki |
Model Number | Car automotive bracket |
Certification | ISO |
Place of Origin | China |
View Detail Information
Explore similar products
SS136 SUS 304 CNC Milling Aluminum Parts Nitride Hardening Stainless Steel
CMM CNC Machining Parts Metal Stainless Steel Blacking Anodized
GD Impeller Gas Turbine Wheel 5 Axis Locomotive Cnc Machining Aviation Parts
Brass 3602 Auto CNC Machining Parts EXW Incoterm Heat Treated
Product Specification
Payment Terms | T/T | Supply Ability | per customer's mass requirement |
Delivery Time | one week | Packaging Details | plastic film wrapped, and packed in a carton box |
Steel | 4130 or P20, Harden steel | Process | CNC milling, wire cutting, EDM |
Data | correspond to cusotmer's CAD | Surface | comply with 2D print |
Intent | functional test | Lead time | 7 days to 10 days |
Design format | IGES, prt. step | Incoterm | FOB |
Brand Name | Gennki | Model Number | Car automotive bracket |
Certification | ISO | Place of Origin | China |
High Light | 4130 Aluminum CNC Machining Parts ,P20 Harden steel CNC Machining Parts ,PMMA machined automotive parts |
These parts are made of steel and aluminum, using the dominant machining of CNC milling, with additional processing of NC turning, CNC lathe processing, CNC Boring, CNC grinding, EDM, wire cutting that can implement the complex features that sole CNC milling cannot. These services are supplied to various industries across the world. Majorly, we are asked to provide these kinds of parts to fit the assembly for motorcycles, industrial machines, and the defense industry.
Material list:
Aluminum(6061-T6, 6063, 7075-T6, 5052) etc.
Brass / Copper / Bronze etc....
Stainless Steel 302,303,304,316,420 etc.
Custom Steel(4130, P20 ,Q235,20#, 45# ) etc.
Plastic(ABS, Delrin, PP, PE, PC, PMMA, PPS, PA+GF)etc.
Foam EPS
MDF
Feature
Brand Name | Gennki Group |
Description | Machining |
Material | Steel, brass, copper, Aluminum |
Facilities | 3-axis,4-axis, CNC machining, CNC lathe, ,grinding machine, wire-cutting machine,EDM, laser cutting machine, CNC shearing machine, CNC bending machine, tapping machine,stamping machine |
Surface Finish | Polish/ Sandblasting /Laser etching/Black oxide coating/ Chrome plating, metallization .etc |
Tolerance | +/-0.02mm |
Place of Origin | China EAST |
Utilizing machining to manufacture parts to test for component fit and function can help get your product to market faster than your competition. Adjustments in design, materials, size, shape, assembly, color, manufacturability, and strength can be made following the results of your testing and analysis.
Many rapid prototyping processes are available to today’s product design teams. Some prototyping processes use traditional manufacturing methods to produce prototypes while other technologies have more recently emerged.
Frequently Asked Question:
Q1. What is required of RFQ?
1) 3D formats with .stp.(preferred) igs,.prt.
2) 2D drawing for tolerance/material/surface finish/test requirement/regulations
3) Quantity (by order, month and Year)
Q2. How do you ensure product quality?
Gennki applies assessment, planning, monitors every single process. Some bullet points:
1) Apply APQP Product development analysis
2) Lay emphasis on prevention and planning
3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?
1) Detailed planning, details per hour/person/machine number/stakeholder…
2) Main material is managed efficiently
3) Daily progress meetings, a recovery plan will be reviewed by the management team once any key chain is a delay.
4) If a delay happens on delivery in the course, extras hours will help to turn it on schedule
Q4. How can you if we don’t have the CAD data?
Gennki is able to generate the CAD for your review and approval in terms of your 2D sketch, or certain samples.
Q5. Can we test the plastic injection mold?
You are always welcome to company with us to try the molds in place in person. The testing video can be supplied for your checking with your absence.
Q6. How long does an injection mold last?
Generally, a plastic injection mold could complete anywhere between 100,00 to 1 million (or sometimes somewhat more than a million) cycles in its lifetime, so it's subject to customer’s expectancy.
Q7. How about your guarantee or aftersales?
The worn-easily spare parts will be freely provided during the warranty period. Gennki’s strategic associated American mold shop will assist you to handle the modification change if needed after the delivery.
Q8. How Can I visit your company from abroad?
Easy to find, you may take an international flight either land at PVG Airport or Hongqiao Airport from your workplace. The nearby high-speed train station to Hongqiao Airport will facilitate your trip to elsewhere in China.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2000
Total Annual:
3.2M-4M
Employee Number:
100~200
Ecer Certification:
Active Member
Gennki Group, the headquarter office located in the metropolitan city of Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer. It will be convenient... Gennki Group, the headquarter office located in the metropolitan city of Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer. It will be convenient...
Get in touch with us
Leave a Message, we will call you back quickly!