Chongqing Gold Mechanical & Electrical Equipment Co.,Ltd
Payment Terms | L/C, D/A, D/P, T/T, Western Union |
Supply Ability | 1 set per 5 days |
Delivery Time | 5-8 work days |
Packaging Details | wooden case |
Depth accuracy | 0.1mm |
Weight | 1KG |
Probe diameter | 24mm,40mm,52mm,65mm,100mm |
Brand Name | GOLD |
Model Number | GD100DC |
Certification | CE, ISO |
Place of Origin | chongqing,China |
View Detail Information
Explore similar products
Electronic Geophysical Instruments For Groundwater Investigations
Multi Channel Geophysical Exploration Instrument Multifunctional
ERI Geophysical Exploration Instrument Electrode Resistivity Imaging Meter
Geophysical Underground Water Detection Equipment ERT DZD-8A
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union | Supply Ability | 1 set per 5 days |
Delivery Time | 5-8 work days | Packaging Details | wooden case |
Depth accuracy | 0.1mm | Weight | 1KG |
Probe diameter | 24mm,40mm,52mm,65mm,100mm | Brand Name | GOLD |
Model Number | GD100DC | Certification | CE, ISO |
Place of Origin | chongqing,China | ||
High Light | Bored Piles Inspection Tester ,Ultrasonic Bored Pile Foundation Tester ,Deep Drill Hole Monitoring Tester |
Bored Piles Inspection Deep Drill Hole Monitoring Tester Ultrasonic Bored Pile Foundation Tester
The Drill Hole Monitor system consists of a weighted sensor that is lowered into the While the sensor is lowered or raised to/from the bottom of the shaft, ultrasonic signals are emanated in either two or four directions. The hole geometry is interpreted from measurements of the time it takes for the signals to travel back to the sensor as the signals are reflected off the excavation sides.
These profiles are then plotted and provide a graphical representation of the verticality and diameter over entire length of the shaft/pile. In the case of larger deviations from plumb,more accurate results on verticality and actual diameter can be obtained by post-processing the data using circle fitting procedures.
digital data are recorded for long-term retention or further analysis of the results.
Main uses
1. Detection of hole diameter, hole depth, verticality, collapse expansion and contraction position and tilt direction of bored piles;
2. Detection of underground continuous wall groove width, depth, verticality, collapse expansion and contraction position and tilt direction;
3. Detection of hole expansion effect of branch piles and expanded bottom piles;
4. Detection of sediment thickness
Specification
Drill Hole Monitor Controller | |||
Display: | 7'' LCD display ,800×600 backlight adjustable | Processor:: | Embedded dual-core processor |
Memory: | 8G TF memory card | Operating system: | Linux operating system |
Control method: | Photoelectric knob | Power: | 12V lithium battery continuous operation for more than 10 hours |
Data interface:: |
USB2.0 port | Water/dustproof: | IP67 |
Outlook size | 255mm×192mm×74mm;probe≤6Kg | Weight: | ≤1.8KG |
Depth encoder | |||
Water/dustproof: | IP67 | Power: | Controller supply |
Depth accuracy: | 0.1mm | Weight: | ≤1KG |
Probe | |||
Probe diameter: | Φ24mm,Φ40mm,Φ52mm,Φ65mm,Φ100mm | Detection diameter: | Φ30mm—Φ 600mm |
Waterproof: | Underwater depth up to1000m | Power: |
Standard probe host power supply, Deep water probe built-in 12V lithium battery power supply |
Depth: | ≥1000m | controller: | Built-in high-performance microcontroller |
Camera: |
700TV Lines, 0.1Lux, panoramic 360 |
Auxiliary light source: | ≥30Lux, adjust the brightness through the host software |
Image pixels: | 1.3 million pixels | Way of Movement: | Horizontal inclined hole mating special guide push rod |
Three-dimensional compass: | Inclination range: ±90 accuracy: 0.5 , resolution: 0.01 ;azimuth range: 0 to 360 ,accuracy: 0.5 , resolution: 0.1 ; probe allows roll 360 | ||
Dimensions
|
Φ40×613mm Φ24×130mm | Weight | ≤4KG |
Product detailes
Follow the specifications
1. "Technical Specifications for Building Pile Foundations JGJ94-2008"
2. "Technical Specifications for Highway Bridge and Culvert Construction JTG/T F50-2011"
3. "Construction Quality Acceptance Specifications for Building Foundation Engineering GB 50202-2002"
4. "Technical Specifications for Bored and Cast-in-Place Pile Holes and Underground Continuous Wall Grooving Testing DB/T 29-112-2010 (Tianjin)"
5. "Technical Specifications for Bored and Cast-in-Place Pile Holes and Underground Continuous Wall Grooving Quality Testing DGJ32TJ117-2011 (Jiangsu)"
6. "Technical Specifications for Bored and Cast-in-Place Pile Holes Quality Testing T/CECS 596-2019" China Association for Engineering Construction Standardization
7. "Technical Specifications for Underground Continuous Wall Testing T/CECS 597-2019" China Association for Engineering Construction Standardization
Company Details
Business Type:
Manufacturer
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Chongqing Gold Mechanical Electrical Equipment Co. Ltd. has been actively involved in the design, development, and manufacturing of geophysical exploration equipment for over four decades. Our expertise encompasses various techniques used to capture images and map subsurface features and structures ... Chongqing Gold Mechanical Electrical Equipment Co. Ltd. has been actively involved in the design, development, and manufacturing of geophysical exploration equipment for over four decades. Our expertise encompasses various techniques used to capture images and map subsurface features and structures ...
Get in touch with us
Leave a Message, we will call you back quickly!