Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 10, 000 Square Meters Per Day |
Delivery Time | 7-10 working days |
Packaging Details | Standard Port Packing or According to Customer′s Requirements |
Model NO. | geotube |
Feature | Corrosion Resistant, Oxidation Resistance, Wear-resistant |
Usage | Insulation, Waterproof, Water Filter |
Material | PP |
Type | Geotube, Woven Knitted |
Function | Filtration ,Separation,Drainage, Reinforcement |
Certificate | ISO9001:2008 |
Brand Name | OEM |
Model Number | geotube |
Certification | ISO certificate |
Place of Origin | China |
View Detail Information
Explore similar products
PP polypropylene Geotube High Strength Geotube Geobag for Embankment in Beach
Filtration Dewatering Sediment Bag Sludge Dewatering Bags Geotube
ISO9001 Geotube Dewatering Bags Sediment Filter For Embankment Foundation
500gsm-100gsm Wastewater Sludge Dewatering Bags Container Geotube Filter
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 10, 000 Square Meters Per Day |
Delivery Time | 7-10 working days | Packaging Details | Standard Port Packing or According to Customer′s Requirements |
Model NO. | geotube | Feature | Corrosion Resistant, Oxidation Resistance, Wear-resistant |
Usage | Insulation, Waterproof, Water Filter | Material | PP |
Type | Geotube, Woven Knitted | Function | Filtration ,Separation,Drainage, Reinforcement |
Certificate | ISO9001:2008 | Brand Name | OEM |
Model Number | geotube | Certification | ISO certificate |
Place of Origin | China | ||
High Light | Corrosion Resistant geotube dewatering ,Dewatering Container Geotube ,PP geotube dewatering |
Factory Price Dewatering Container Geotube For Waste Water Sludge Filter
Geotube is made from high strength polypropylene bag, can also use woven cloth material, choose the product material according to the project actual demand; Common black; Adjusted according to different specifications of products commonly used material 400 gsm; Unlimited length, the width can be multiple image splicing unlimited width, but directly affect the dehydration tube bag material intensity range is wider requirements material strength is higher; Basic order fill height for two-thirds of the diameter of the tube bag; According to the construction site of the grouting machine diameter custom, can according to actual situation or adding medicament (increased solidification speed accelerate spate separation).
Iterm | Unit | Standard | Index | |||
HT500 | HT750 | HT1000 | ||||
Tensile Strength | Radial Direction | KN/M | ISO 10319-2015 | 85 | 130 | 220 |
Zonal Direction | KN/M | ISO 10319-2015 | 115 | 120 | 200 | |
Elongation at Break | Radial Direction | % | ISO 10319-2015 | 13 | 12 | 13 |
Zonal Direction | % | ISO 10319-2015 | 8 | 8 | 8 | |
Joint Tensile Strength | KN/M | ISO 10319-2015 | 90 | 100 | 170 | |
CBR | KN | GB/T14800-2010 | 9 | 15 | 20 | |
Dynamic Perforation | MM | GB/T17630-1998 | 8 | 10 | 8 | |
Effective Aperture(O90) | MM | GB/T14799-2005 | 0.45 | 0.4/0.28 | 0.45 | |
Permeability(Q50) | L/m2/s | GB/T15789-2005 | 35 | 14 | 18 | |
UV Resistance | % | ASTM D4355-2014 | 90 | 85 | 85 |
![]() | |
Convenient and quick Diameter and length can be adjusted according to the need, high plasticity, and can be stacked, transportation is convenient. | Low noise Fully enclosed construction, little noise, is not easy to cause secondary pollution. |
Wide application The size of the wastewater treatment and sludge dewatering engineering all can use. | Capacity reduction effect is good Within one month of the sludge volume can reduce more than 90%, basically for subsequent removal and handling easier. |
Application:
1. Both rivers.
2. mine regreen.
3. Treatment of landslides, gutters, soil erosion, irrigation systems.
4. Constructed wetland repair.
5. Green roof.
PS: The second step is drainage, because the geotextile that makes up the bag has tiny holes that trap it in the mud, solids can also discharge water from the mud, which can effectively reduce the volume of inclusion in the bag body,The bag body can be repeatedly filled until the allowable height of the bag material is reached, and the discharged water can be reused.
PS: The third step is consolidation. After repeated filling and drainage, the fine particles left in the bag body will gradually consolidate due to drying.
Professional geosynthetics manufacturer
Anhui Zhonglu Engineer Materials Co., Ltd
Angela:86-18095658976
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
2014
Total Annual:
$10000000-60000000
Employee Number:
20~100
Ecer Certification:
Verified Supplier
Anhui zhonglu Engineer Material Co., Ltd is a high-tech and integration enterprise specializing in research and development, design, production, construction, consulting, domestic and international trade. And factory equipped with production lines and testing equipment. Dedicated in supplyi... Anhui zhonglu Engineer Material Co., Ltd is a high-tech and integration enterprise specializing in research and development, design, production, construction, consulting, domestic and international trade. And factory equipped with production lines and testing equipment. Dedicated in supplyi...
Get in touch with us
Leave a Message, we will call you back quickly!