Payment Terms | T/T, L/C |
Supply Ability | 60,000 pcs monthly |
Delivery Time | 30 days |
Packaging Details | Wooden Case |
Application | Valve |
Material | Stainless Steel |
Process | Lost Wax Casting |
Toerlance | +/-0.05mm |
Finish | Sandblasting |
Service | OEM |
Brand Name | NC6744 |
Model Number | 6744 |
Certification | ISO9001,CE,SGS |
Place of Origin | Mainland China |
View Detail Information
Explore similar products
Precision Sand Casting Stainless Steel / Sandblasting Sulzer Pump Body Casting
High Precision Stainless Steel Investment Casting For Hydraulic Valve Cover
Cast Stainless Steel 90 Degree Pipe Elbow Stainless Steel Elbow Reducer
Precison Stainless Steel Casting Butterfly Valve Disc Lost Wax Casting
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 60,000 pcs monthly |
Delivery Time | 30 days | Packaging Details | Wooden Case |
Application | Valve | Material | Stainless Steel |
Process | Lost Wax Casting | Toerlance | +/-0.05mm |
Finish | Sandblasting | Service | OEM |
Brand Name | NC6744 | Model Number | 6744 |
Certification | ISO9001,CE,SGS | Place of Origin | Mainland China |
OEM Service 304 316 Stainless Steel Lost Wax Investment Casting Valve Parts
Product Details
Technic | Investment Casting |
Material | Stainless Steel , Alloy steel , carbon steel |
Process | Water glass lost wax investment casting , Silica sol lost wax investment casting |
Surface Treatment | Zinc Plating , Mirror Polishing , Sand Blast , Painting , Hot Galvanizing Nickel Plating, etc |
Heat Treatment | Normalizing , Tempering , Hardening , etc |
Weight Range | 0.01 KG to 20 KG |
Standard | ASTM , DIN , ISO , BS , JIS , etc |
Machining Equipment | CNC , Lathe , Milling machine , Drilling , etc |
Productiion Capacity | 1000 tons per month |
Manufacturing Area (sqm) | 10000 |
FAQ
Q: What is your MOQ?
A: MOQ depends on our client's needs, besides,we welcome trial order before mass-production.
Q: Is it possible to know how is myproduct going on without visiting your company?
A: We will offer a detailed products schedule and send weekly reports with digital pictures and videos which show the machining progress.
Q:What's the production time for new molds and mass production? A:10-20 days to make the new moulds, mass production takes around 15 days,can process urgently if need.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1990
Total Annual:
5,000,000-10,000,000
Employee Number:
50~75
Ecer Certification:
Verified Supplier
Factory Introduction Sunrise Foundry is a professional Metal Foundry, located in Ningbo. We have been producing Gray Iron, Ductile Iron Castings and and any other precision castings for more than 25 years. We are dedicated to meet different requirements of various custom... Factory Introduction Sunrise Foundry is a professional Metal Foundry, located in Ningbo. We have been producing Gray Iron, Ductile Iron Castings and and any other precision castings for more than 25 years. We are dedicated to meet different requirements of various custom...
Get in touch with us
Leave a Message, we will call you back quickly!