Supply Ability | 5000 Metric Ton/Metric Tons per Year |
Packaging Details | 6m or 12m per piece |
Specification | DN20mm-630mm |
Color | Black or Customer request |
Usage | Water supply |
Raw material | PE100 |
Size | Customized Size |
MOQ | 100 Meters |
Sample | Provide Samples |
Advantage | High Performance |
Brand Name | HAIYANG |
Model Number | HM1-46 |
Certification | ISO9001,14001,45001 |
Place of Origin | China |
View Detail Information
Explore similar products
Drainage HDPE Water Supply Pipes High Performance PE 110 Solid Wall Hdpe Pipe
Water Supply Steel Plastic Composite Pipe Fused Polyethylene HDPE DN90 - 630
Plastic HDPE Water Supply Pipes Chemical Resistant PE100 400 500 630
DN20 630 HDPE High Density Polyethylene Pipe Non Toxic Water Supply Line Pipe
Product Specification
Supply Ability | 5000 Metric Ton/Metric Tons per Year | Packaging Details | 6m or 12m per piece |
Specification | DN20mm-630mm | Color | Black or Customer request |
Usage | Water supply | Raw material | PE100 |
Size | Customized Size | MOQ | 100 Meters |
Sample | Provide Samples | Advantage | High Performance |
Brand Name | HAIYANG | Model Number | HM1-46 |
Certification | ISO9001,14001,45001 | Place of Origin | China |
High Light | Dredging Drainage Hdpe Water Supply Pipe ,DN20mm Drainage Hdpe Water Supply Pipe ,Drainage Hdpe Water Supply Pipe PE100 |
Dredging Drainage Hdpe Water Supply Pipe Plastic Factory Black Color Pipe
----------------------------------------
Basic Info.
The main difference between HDPE water supply pipe and HDPE drainage pipe is their intended use. HDPE water supply pipes are designed for transporting potable water, while HDPE drainage pipes are meant for transporting wastewater. Both types of pipe are made from high-density polyethylene (HDPE), but HDPE water supply pipes have a higher level of purity than HDPE drainage pipes. This means that HDPE water supply pipes are safe for human contact, while HDPE drainage pipes should not be used for drinking water.
Outer Diameter DN (mm) | SDR 9 PN20 | SDR 11 PN16 | SDR 13.6 PN12.5 | SDR 17 PN10 | SDR21 PN8 | SDR26 PN6 | Packing Loaded into 40GP/Piece 6m or 12m per Piece |
Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | ||
75 | 8.4 | 6.8 | 5.6 | 4.5 | 1085 | ||
90 | 10.1 | 8.2 | 6.7 | 5.4 | 4.3 | 754 | |
110 | 12.3 | 10 | 8.1 | 6.6 | 5.3 | 4.2 | 504 |
125 | 14 | 11.4 | 9.2 | 7.4 | 6 | 4.8 | 378 |
140 | 15.7 | 12.7 | 10.3 | 8.3 | 6.7 | 5.4 | 304 |
160 | 17.9 | 14.6 | 11.8 | 9.5 | 7.7 | 6.2 | 224 |
180 | 20.1 | 16.4 | 13.3 | 10.7 | 8.6 | 6.9 | 182 |
200 | 22.4 | 18.2 | 14.7 | 11.9 | 9.6 | 7.7 | 143 |
225 | 25.2 | 20.5 | 16.6 | 13.4 | 10.8 | 8.6 | 110 |
250 | 27.9 | 22.7 | 18.4 | 14.8 | 11.9 | 9.6 | 90 |
280 | 31.3 | 25.4 | 20.6 | 16.6 | 13.4 | 10.7 | 72 |
315 | 35.2 | 28.6 | 23.2 | 18.7 | 15 | 12.1 | 56 |
355 | 39.7 | 32.2 | 26.1 | 21.1 | 16.9 | 13.6 | 42 |
400 | 44.7 | 36.3 | 29.4 | 23.7 | 19.1 | 15.3 | 30 |
450 | 50.3 | 40.9 | 33.1 | 26.7 | 21.5 | 17.2 | 25 |
500 | 55.8 | 45.4 | 36.8 | 29.7 | 23.9 | 19.1 | 20 |
560 | 62.5 | 50.8 | 41.2 | 33.2 | 26.7 | 21.4 | 16 |
630 | 70.3 | 57.2 | 46.3 | 37.4 | 30 | 24.1 | 12 |
710 | 64.5 | 52.2 | 42.1 | 33.9 | 27.2 | 9 | |
800 | 72.7 | 58.8 | 47.4 | 38.1 | 30.6 | 6 | |
900 | 81.8 | 66.2 | 53.3 | 42.9 | 34.4 | 6 | |
1000 | 90.2 | 72.5 | 59.3 | 47.7 | 38.2 | 4 | |
1200 | 88.2 | 67.9 | 57.2 | 45.9 | |||
1400 | 102.9 | 82.4 | 66.7 | 53.5 | |||
1500 | 110.2 | 88.2 | 71.4 | 57.6 | |||
1600 | 117.6 | 94.1 | 76.2 | 61.2 |
How to install HDPE pipe?
Installing HDPE pipe is a relatively simple process that can be completed by anyone with basic plumbing knowledge. There are only a few steps involved in the installation process, and no special tools or equipment is required. Here is a step-by-step guide to installing HDPE pipe:
1.Measure the area where the pipe will be installed and mark out the route for the pipe.
2.Dig a trench along the marked route, making sure that it is wide enough to accommodate the HDPE pipe.
3.Lay the HDPE pipe in the trench and secure it in place with clamps or straps.
4.Cover the pipe with soil or gravel and compact it around the pipe to form a tight seal.
5.Test the HDPE pipe by performing a pressure test or watertightness test.
Details
Application
Urban gas pipelines
Because HDPE gas special pipeline has strong impact resistance and toughness. Gradually replace cast iron pipes for urban and rural gas transmission projects. The urban gas pipeline network must not only ensure uninterrupted and reliable supply of gas to users, ensure the safe operation and management of the system, and facilitate maintenance and maintenance, but also consider closing some pipe sections without affecting the work of other systems during maintenance or failure. Therefore, it is necessary to select different pressure levels in the urban gas network system.
Certificate
Company Profile
High Mountain Pipe Management Industry With 19 years of experience in R&D, production and sales of plastic pipe fittings, HDPE pipes are of good quality. In order to meet the actual needs of modern high-quality buildings and the design concept of environmental protection and silence, the company has introduced advanced production equipment and manufacturing technology, and has successively developed grooved ( HDPE) HDPE mute, HDPE grooved mute pipe, HDPE grooved drainage pipe compression drainage system and HDPE siphon drainage system series products. HDPE is a highly crystalline, non-polar thermoplastic resin. The appearance of the original HDPE is milky white, and it is translucent to a certain extent in the thin section. PE has excellent resistance to most household and industrial chemicals. hdpe pipe factory adheres to the factory policy of "credibility, quality and management as the fundamental goal", with moderate price, dedicated service, and customer satisfaction as the purpose, abiding by contracts and keeping promises and famous all over the country.
FAQ
Q: How and when can I receive my goods after payment?
A: For small batch products, they will be delivered to you by international express (DHL, FedEx, TNT, etc.) or by air. It usually takes 3-5 days to receive the goods after delivery. For high-volume products, it is worthwhile to see the goods and deliver them. It takes several days to several weeks to reach the destination port, depending on the location of the port.
Q: Is the price on this page correct?
A: The listed prices are for reference only, please contact us directly for the latest prices.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
2014
Total Annual:
20000000-25000000
Employee Number:
80~100
Ecer Certification:
Verified Supplier
High Mountain Pipe is dedicated to the manufacturing and sales of various kinds of plastic pipes and fittings. And we can provide a professional solution method for a complete pipe system. The production and sales volume of leading products of HDPE/PVC/PPR pipes & fittings ranks among the highes... High Mountain Pipe is dedicated to the manufacturing and sales of various kinds of plastic pipes and fittings. And we can provide a professional solution method for a complete pipe system. The production and sales volume of leading products of HDPE/PVC/PPR pipes & fittings ranks among the highes...
Get in touch with us
Leave a Message, we will call you back quickly!