China factories

Chat Now Send Email
China factory - BELPARTS MACHINERY LIMITED

BELPARTS MACHINERY LIMITED

  • China,Guangzhou
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Doosan DH420 Travel Gearbox 2nd Planetary Carrier Spider With Sun Gear Assy for
China Doosan DH420 Travel Gearbox 2nd Planetary Carrier Spider With Sun Gear Assy for

  1. China Doosan DH420 Travel Gearbox 2nd Planetary Carrier Spider With Sun Gear Assy for
  2. China Doosan DH420 Travel Gearbox 2nd Planetary Carrier Spider With Sun Gear Assy for
  3. China Doosan DH420 Travel Gearbox 2nd Planetary Carrier Spider With Sun Gear Assy for

Doosan DH420 Travel Gearbox 2nd Planetary Carrier Spider With Sun Gear Assy for

  1. MOQ: 1 piece
  2. Price: Negotiable price
  3. Get Latest Price
Warranty 12 Months
Quality Aftermarket High Quality
Delivery Time 1-7days
Condition New
Payment Terms T/T,Paypal and Trade Assurance
Shipment Air Sea Express Delivery
Supply Ability 1000pieces
Model DH420
Packaging Details Wooden packing
Certifiion OEM
Payments T/T, PayPal, Trade Assurance
Place of Origin Made in China
Model Number DH420
Brand Name Belparts

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Warranty 12 Months Quality Aftermarket High Quality
Delivery Time 1-7days Condition New
Payment Terms T/T,Paypal and Trade Assurance Shipment Air Sea Express Delivery
Supply Ability 1000pieces Model DH420
Packaging Details Wooden packing Certifiion OEM
Payments T/T, PayPal, Trade Assurance Place of Origin Made in China
Model Number DH420 Brand Name Belparts
High Light Doosan DH420 travel gearbox planetary carrierexcavator planetary gear spider assemblysun gear assy with planetary carrier
Doosan DH420 Travel Gearbox 2nd Planetary Carrier Spider With Sun Gear Assembly | Heavy Excavator Aftermarket Replacement Parts
Product Overview

This matched secondary planetary carrier and sun gear unit serves as the core intermediate deceleration component inside the travel final drive, exclusively engineered for Doosan DH420 large heavy-duty crawler excavators. Widely deployed in open-pit mining, large-volume earthmoving, highway subgrade construction and river dredging projects, the DH420 bears extreme continuous heavy loads, steep gradient climbing resistance and frequent rock impact abrasion throughout daily shifts.

The second planetary stage undertakes critical torque conversion after primary deceleration. Once the carrier spider arms crack, sun gear tooth surfaces pit or internal splines suffer severe abrasion, the machine will display noticeable left-right track speed discrepancy, weak walking traction, persistent harsh metal screeching noise and rapid overheating of the entire travel motor housing.

We strictly replie original Doosan factory blueprint data for gear tooth profiles, inner spline parameters and mounting hole layout. This assembly supports direct plug-and-field replacement without secondary drilling, reaming or cutting operations, drastically cutting equipment maintenance downtime. It perfectly addresses the points of long lead times and inflated procurement costs for genuine OEM spare parts, ering to global fleets of used DH420 machines distributed across Africa, Southeast Asia and Central Asia mining zones.

Basic Product Specifiion Table
Item Detailed Specifiion
Full Product Name 2nd Stage Planetary Carrier Spider Complete Assembly with Matching Sun Gear
Compatible Equipment Doosan DH420 Large Heavy Crawler Excavator
Mounting Position Middle deceleration segment of travel reduction gearbox, secondary torque reduction unit of final drive
Appliion Scenarios Open-pit mines, large infrastructure projects, heavy equipment rental yards, bulk earthmoving contractors
Quality Warranty 12-month factory defect warranty; damage caused by improper installation, overloading and artificial collision is excluded
MOQ 1 unit available for sample trial orders, abundant spot inventory supports fast global delivery within 5-8 working days
QC Inspection Standards Alloy raw material composition test, full-size 3D scanning dimensional measurement, long-period alternating heavy torque fatigue aging test before shipment
Net Weight Around 90KG per complete set
Core Technical Parameters
Parameter Standard Index
Base Raw Material High-density forged alloy steel with compact refined internal grain structure
Heat Treatment Flow Integrated dual thermal process: carburizing quenching + low-temperature stress relief tempering
Surface Mechanical Performance Ultra-hardened gear tooth surface paired with high-toughness core matrix, effectively inhibits crack expansion under instantaneous heavy impact torque
Assembly Composition Reinforced thickened secondary planetary carrier spider + dedied matched 2nd stage sun gear
Precision Machining Craft 5-axis linkage high-precision CNC cutting + ultra-fine gear tooth grinding and full burr-free polishing treatment
Structural Design Highlights Multi-rib triangular reinforced load-sharing frame, optimized to withstand long-cycle heavy mining alternating loads
Core Competitive Advantages
  1. 1:1 OEM Precision Matching Customized for Doosan DH420 Travel Final Drive Internal Cavity

    This planetary carrier and sun gear combination is precisely molded to fit the internal structural size of DH420 travel reducers, with zero cross-model compatibility for other Doosan heavy excavators such as DH370 or DX420. Accurate repliion of original spline and gear meshing clearances eliminates track deflection, unstable jitter during walking, harsh internal friction noise and premature abrasion of matched transmission accessories post-installation.

  2. Integrated Thickened Forged Body Boosts Long-Term Mining Working Durability

    Most low-cost generic aftermarket planetary carriers easily suffer spider arm fracture or sun gear tooth collapse under round-the-clock continuous heavy mining loads. Our one-piece thick die forging technology paired with complete multi-stage constant-temperature heat treatment significantly elevates the product’s anti-impact and anti-fatigue performance. It maintains stable torque transmission during non-stop large-scale excavation and long-distance cross-region equipment transfer for leasing and pre-owned heavy machine fleets.

  3. Two Independent Pre-Delivery Quality Screening Mechanisms Eliminate On-Site Shutdown Losses

    Each finished assembly undergoes two fully independent closed-loop inspection workflows before leaving the factory. Full-range dimension calibration accurately verifies all matching tolerances of gear surfaces and internal splines. Simulated large open-pit mine heavy torque aging test reproduces extreme harsh actual working loads to validate long-term transmission stability. All unqualified semi-finished products are filtered out internally, helping repair service shops and mine operators avoid economic losses caused by unplanned construction halts.

  4. High Cost-Performance OEM-Grade Repair Solution for Large Excavator Fleet Operators

    Genuine original Doosan planetary drive spare parts carry extremely high procurement costs and unstable supply cycles for the DH420 classic heavy excavator model widely circulated overseas. Our aftermarket assembly delivers load-bearing capacity and service lifespan equivalent to OEM standards at factory-direct wholesale prices, effectively cutting annual maintenance expenditure for enterprises managing multiple DH420 heavy machine assets.

  5. Diversified Global Logistics Channels for International Construction Machinery Spare Parts Wholesalers

    All spot stock goods can be arranged for shipment within 3 working days after payment confirmation. Air freight channels er to urgent emergency breakdown orders from remote mountain mining zones. Consolidated bulk sea freight and full-container FCL shipping provide economical bulk procurement plans for dealers covering Africa, Southeast Asia, Middle East, Central Asia and Latin American markets, with major delivery ports including Guangzhou, Ningbo and Shanghai.

Factory Manufacturing Strengths

Our production facility specializes in R&D and mass production of planetary transmission spare parts for Korean brand excavators (Doosan & Hyundai) for over 12 years, with travel gearbox planetary carrier assemblies as our core flagship product series. We own a complete closed-loop production chain: alloy steel die forging, 5-axis precision gear processing, constant-temperature professional heat treatment and finished-product heavy-load simulation evaluation. Custom heavy-torque test benches replie harsh large mine and highway construction environments to continuously optimize product shock resistance and extend service life. Our planetary transmission spare parts are exported to more than 45 countries and regions worldwide, establishing long-term stable strategic cooperative partnerships with heavy machinery spare parts wholesalers globally.

Frequently Asked Customer Questions
Q1: Can this secondary planetary carrier assembly adapt to other Doosan excavator models besides DH420?

A1: Cross-model compatibility is not supported. Different Doosan excavator series adopt final drive assemblies with exclusive non-interchangeable structural dimensions and spline parameters. Please double-check your exact machine model before placing orders.

Q2: What travel gearbox malfunctions can this assembly resolve?

A2: It fixes equipment faults triggered by cracked carrier spider support arms, severely worn or chipped sun gear teeth, offset wobbling tracks, continuous harsh internal gear friction noise and insufficient travel driving power output.

Q3: Are tiered volume discount policies available for large wholesale orders?

A3: Yes, we offer graded preferential pricing linked to order quantity. We can coordinate full-container sea transportation to reduce overall international logistics expenses for large-batch procurement.

Q4: What anti-rust and shockproof packaging is adopted for long-distance ocean transportation?

A4: All metal surfaces are evenly coated with high-viscosity heavy-duty anti-rust grease. The whole assembly is wrapped with multi-layer thick waterproof and shockproof PE film, then sealed and packed in reinforced export plywood crates, preventing surface scratches, collision deformation and damp corrosion during lengthy overseas sea transit.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2013

  • Total Annual:

    $28000000-$41660000

  • Employee Number:

    1200~1300

  • Ecer Certification:

    Verified Supplier

Since 2013 Excavator Hydraulic Parts Manufacturer & Global Supplier Since 2013 Belparts Machinery Limited — Your Trusted Partner in Excavator Hydraulic Parts Who We Are Founded in September 2013 and headquartered in Guangzhou, China's premier engineering machinery hub, Belparts ha... Since 2013 Excavator Hydraulic Parts Manufacturer & Global Supplier Since 2013 Belparts Machinery Limited — Your Trusted Partner in Excavator Hydraulic Parts Who We Are Founded in September 2013 and headquartered in Guangzhou, China's premier engineering machinery hub, Belparts ha...

+ Read More

Get in touch with us

  • Reach Us
  • BELPARTS MACHINERY LIMITED
  • 429-432,No.268 Zhongshan Avenue East,Huangpu District,Guangzhou
  • https://www.hydraulic-excavatorparts.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement