| Model | DH225-7 |
| Certifiion | OEM |
| Supply Ability | 1000pcs |
| Condition | New |
| Quality | Aftermarket High Quality |
| Delivery Time | 1-7days |
| Shipment | Air Sea Express Delivery |
| Warranty | 12 Months |
| Payments | T/T, PayPal, Trade Assurance |
| Payment Terms | T/T,Paypal and Trade Assurance |
| Packaging Details | Wooden packing |
| After-sales Services | Online |
| Model Number | DH225-7 |
| Brand Name | Belparts |
| Place of Origin | Made in China |
| Certification | ISO9001 / CE |
View Detail Information
Explore similar products
Komatsu PC200-6 Swing Gearbox 2nd Planetary Carrier Spider With Sun Gear Assy
Hitachi ZX230 Travel Gearbox 3rd Planetary Carrier Spider With Sun Gear Assy for
Kato HD450 Swing Gearbox 1St Planetary Carrier Spider For Excavator parts
Sumtiomo SH200 Swing Gearbox 2nd Planetary Carrier Spider With Sun Gear Assy For
Product Specification
| Model | DH225-7 | Certifiion | OEM |
| Supply Ability | 1000pcs | Condition | New |
| Quality | Aftermarket High Quality | Delivery Time | 1-7days |
| Shipment | Air Sea Express Delivery | Warranty | 12 Months |
| Payments | T/T, PayPal, Trade Assurance | Payment Terms | T/T,Paypal and Trade Assurance |
| Packaging Details | Wooden packing | After-sales Services | Online |
| Model Number | DH225-7 | Brand Name | Belparts |
| Place of Origin | Made in China | Certification | ISO9001 / CE |
| High Light | Swing Gearbox 2nd Planetary Carrier Spider ,Doosan 2nd Planetary Carrier Spider ,DH225-7 Planetary Gear Parts | ||
Doosan DH225‑7 Swing Gearbox 2nd Planetary Carrier Spider With Sun Gear Assy For Excavator Parts
Product Overview
This complete second‑stage planetary carrier spider and sun gear assembly acts as the secondary torque reduction core component installed within the swing reducer of Doosan DH225‑7 22‑ton mid‑size crawler excavator. It receives torque output from the first‑stage planetary group, completes secondary deceleration and torque amplification, and delivers power to drive upper structure rotation. This excavator model is widely applied in earth‑moving projects, stone loading, site grading, road construction and general demolition work. Under long‑duration alternating forward‑reverse slewing impact loads, deteriorated gear oil and failed sealing elements allow construction dust and metallic wear debris to enter gearbox interior, which will bring about spline galling, gear tooth surface pitting, carrier spider bending deformation and pin‑hole oval wear. Common failure signs include distinct metallic grinding noise inside swing gearbox, intermittent jerky cab rotation, weakened swing driving force, excessive operating temperature on reducer housing, as well as metal fine particles found in waste oil during swing gear oil maintenance. Produced strictly according to OEM forging blueprints and gear meshing technical standards, this aftermarket replacement assembly supports direct drop‑in installation, and effectively prevents successive damage to other high‑cost internal gearbox components.
Technical Specification
| Item | Parameter |
|---|---|
| Applicable Equipment | Doosan DH225‑7 Mid‑size Crawler Excavator Swing Reduction Gearbox |
| Component Name | 2nd Planetary Carrier Spider With Sun Gear Complete Assembly |
| OEM Reference Number | ‑ |
| Function | Second‑stage speed reduction and torque multiplication for swing drive system |
| Main Material | High‑strength alloy steel, carburizing quenching treatment for gear teeth and spline surfaces |
| Core Components | Secondary planetary carrier spider, integrated sun gear, planetary pin shafts, bearing mating positions |
| Processing Technology | Precision hot forging, stress‑relief annealing, carburizing quenching, high‑precision gear grinding, spline hobbing, dust‑controlled assembly environment |
| Installation Feature | Full dimensional interchangeability, no welding, cutting or field rework required |
| Product Grade | Premium aftermarket replacement spare part |
Core Advantages
Manufacturing & Quality Control
Our production plant concentrates on manufacturing planetary transmission spare parts for Doosan mid‑tonnage excavator swing gearboxes. Full‑flow quality management includes raw‑material composition checking, forging appearance inspection, heat‑treatment hardness testing, gear‑tooth precision measurement, spline dimension verification and sample no‑load running‑in test. Only fully qualified assemblies can enter packaging process. Finished goods are coated with anti‑rust preservation oil, wrapped by shock‑absorbing cushion materials and packed in export‑standard fumigated wooden cases, to prevent collision deformation and rust during long‑distance sea‑land combined transportation. We support large‑volume wholesale and stable batch supply; small trial orders are acceptable for global buyers.
Frequently Asked Questions
Q1: What abnormal conditions mean inspection or replacement for 2nd planetary carrier and sun‑gear assembly? A: If your Doosan DH225‑7 excavator generates obvious metallic grinding sound inside swing gearbox, cabin rotates jerkily intermittently, swing power decreases greatly, reducer housing runs over‑hot, or metal impurities are observed in waste swing gear oil during oil‑change service, you need to disassemble swing reducer for complete internal check in time.
Q2: Can this assembly fit other different excavator models? A: This spare part is specially manufactured for Doosan DH225‑7 swing gearbox. Even if some other excavator models have similar exterior look, internal gearbox configurations may exist differences. Please double‑check corresponding OEM part numbers before placing order to prevent installation mismatch.
Q3: What important installation reminders during swing gearbox overhaul? A: Thoroughly clear all metal debris and aged residual gear oil inside swing gearbox housing prior to installation. Meanwhile examine wear degree of planetary gears, bearings and oil seals. After assembly completion, refill qualified swing gear oil, perform low‑speed no‑load swing running‑in test before putting excavator into official construction work.
Q4: Warranty scope explanation A: Our warranty is valid for defects stemming from raw‑material flaws and manufacturing errors. Damage induced by foreign‑object invasion, insufficient gear‑oil lubrication, heavy overload impact and improper disassembly‑installation will not be covered by warranty. Please strictly follow Doosan official service manual while conducting swing gearbox overhaul operations.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2013
Total Annual:
$28000000-$41660000
Employee Number:
1200~1300
Ecer Certification:
Verified Supplier
Since 2013 Excavator Hydraulic Parts Manufacturer & Global Supplier Since 2013 Belparts Machinery Limited — Your Trusted Partner in Excavator Hydraulic Parts Who We Are Founded in September 2013 and headquartered in Guangzhou, China's premier engineering machinery hub, Belparts ha... Since 2013 Excavator Hydraulic Parts Manufacturer & Global Supplier Since 2013 Belparts Machinery Limited — Your Trusted Partner in Excavator Hydraulic Parts Who We Are Founded in September 2013 and headquartered in Guangzhou, China's premier engineering machinery hub, Belparts ha...
Get in touch with us
Leave a Message, we will call you back quickly!