Payment Terms | T/T, D/P, L/C |
Supply Ability | 15 set/month |
Delivery Time | 15-35 days |
Packaging Details | 7.14 CBM |
Name | Vibratory Pile Driver |
Feature | Applicable for all types of sheet piling |
Vibration | 3200rpm |
Pressure | 32Mpa |
Centrifugal Force | 455KN |
Arm | 750kg |
Hammer | 2600kg |
Excavator | 40-45Ton |
Brand Name | VIBRA |
Model Number | FV-350 |
Place of Origin | SHANGHAI |
View Detail Information
Explore similar products
45-60T Hydraulic Pile Driver For Excavators , Hydraulic Pile Driving Machine
Eco Friendly Hydraulic Static Pile Driver 670kg Arm Weight 35-40T Excavator
2300 Kg Highly Efficient Hydraulic Pile Driver , Vibratory Hammer Pile Driver
No Pollution Hydraulic Sheet Pile Driver 2700kg Hammer Weight Easy Maintenance
Product Specification
Payment Terms | T/T, D/P, L/C | Supply Ability | 15 set/month |
Delivery Time | 15-35 days | Packaging Details | 7.14 CBM |
Name | Vibratory Pile Driver | Feature | Applicable for all types of sheet piling |
Vibration | 3200rpm | Pressure | 32Mpa |
Centrifugal Force | 455KN | Arm | 750kg |
Hammer | 2600kg | Excavator | 40-45Ton |
Brand Name | VIBRA | Model Number | FV-350 |
Place of Origin | SHANGHAI | ||
High Light | 3200rpm Vibro Pile Driver ,45Ton Excavator Vibro Pile Driver |
Vibro Pile Driver For All Brand Of Excavator
Description
Vibratory Pile Driver is utilizing its high recurrence vibration to vibrate pile body with high speed to pass the vertical vibration of mechanical produce to pile which prompting changes in the earth design around the pile, strength decline. Soil around the piles become liquefaction to decrease frictional obstruction between side of the pile and the soil.
At that point utilizing the excavator down power, vibrating pile sledge and pile body weight to sink pile into the soil. When separating piles, in the state of vibration to pull out the pile by utilizing excavator lift power.
Excitation power required by pile driving machinery are complete controlled by site soil,soil condition,moisture substance and kind of pile,construction.
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
About Us
Shanghai yekun Machinery Co., Ltd was founded in 2014, A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.
Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Seller
Year Established:
2009
Total Annual:
800,000-10,000,0000
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...
Get in touch with us
Leave a Message, we will call you back quickly!