| Payment Terms | T/T |
| Supply Ability | 10 set/month |
| Delivery Time | 7-35 days |
| Vibration Frequency | 3200 rpm |
| Operation Pressure | 32 Mpa |
| Centrifugal Force | 585 Kn |
| Max. Pile Length | 21 m |
| Arm Weight | 820 kg |
| Hammer Weight | 3350 kg |
| Excavator Operating Weight | 55~70 T |
| Color | Blue |
| Brand Name | VIBRA |
| Model Number | PCF-500 |
| Place of Origin | Shanghai, China |
View Detail Information
Explore similar products
Hydraulic Pile Driver For Excavators - Blue Design With Larsen Steel Sheet Pile
Excavator Mounted Pile Driver - Low Noise Hydraulic & Multi-Pile Type Adaptation
Quick Speed Hydraulic Pile Driver - High Accuracy Vibratory Hammer & Low Noise
High Precision Excavator Pile Driver - Vibratory Operation & 18m Max Pile Length
Product Specification
| Payment Terms | T/T | Supply Ability | 10 set/month |
| Delivery Time | 7-35 days | Vibration Frequency | 3200 rpm |
| Operation Pressure | 32 Mpa | Centrifugal Force | 585 Kn |
| Max. Pile Length | 21 m | Arm Weight | 820 kg |
| Hammer Weight | 3350 kg | Excavator Operating Weight | 55~70 T |
| Color | Blue | Brand Name | VIBRA |
| Model Number | PCF-500 | Place of Origin | Shanghai, China |
| High Light | 21m Excavator Mounted Pile Driver ,vibro Excavator Mounted Pile Driver ,21m excavator sheet pile driver | ||
21m Deep Sheet Pile Driver: High-Frequency Vibro Hammer for Excavator Mounting
Core Product Keywords: Hydraulic Vibratory Pile Driver, Pile Driver and Extractor, High-Speed Pile Driver, Excavator-Mounted Pile Driver, Interchangeable Pile Hammer, Heavy-Duty Pile Driver.
Product Overview
Shanghai Yekun Construction Machinery Co., Ltd. leverages extensive industry experience to deliver high-performance hydraulic vibratory pile drivers. Designed for efficiency and versatility, our equipment utilizes advanced vibration technology to handle demanding piling and extraction tasks across diverse infrastructure projects. Backed by a professional team, we provide reliable solutions tailored to complex construction challenges.
Working Principle
Our pile driver harnesses hydraulic power from the excavator to generate high-frequency vibrations. This motion is transmitted to the pile head, causing surrounding soil to liquefy and break structure, thereby drastically reducing friction. The synchronized rotation of dual eccentric shafts creates a powerful vertical vibratory force, enabling rapid pile penetration or extraction with horizontal forces canceling each other out for stable operation.
Key Features & Advantages
High-Efficiency Vibration System: Delivers powerful vibratory force (up to 585 KN) and high frequency (up to 3500 rpm) for rapid and effective pile driving in various soil conditions.
Universal Compatibility & Flexibility: Compatible with any 6-60 ton excavator. Handles multiple pile types (steel sheet, concrete, H-beam, pipe piles) through interchangeable clamps.
Durable & Interchangeable Design: Features robust construction with heavy-duty cast steel fixtures. Designed for full interchangeability with parts from standard Taiwan-made pile drivers, ensuring easy maintenance and part replacement.
Premium Core Components: Equipped with high-quality imported parts, including first-line brand Rexroth vibration motors, ensuring reliable performance and extended operational life.
Proven Heavy-Duty Performance: Includes the PCF-500 model engineered to match Caterpillar 365 excavators, demonstrating capability for the most demanding large-scale projects.
Technical Parameters: PCF Series
| Model | Vibration (RPM) | Centrifugal Force (KN) | Max. Pile Length (m) | Excavator Weight (T) | Total Weight (kg) |
|---|---|---|---|---|---|
| PCF-300 | 3500 | 385 | 12 | 27~30 | 3500 |
| PCF-330 | 3300 | 420 | 12 | 33~38 | 3600 |
| PCF-350 | 3500 | 470 | 15 | 40~45 | 3700 |
| PCF-450 | 3300 | 535 | 18 | 47~55 | 3970 |
| PCF-500 | 3200 | 585 | 21 | 55~70 | 4170 |
Application Scope
Ideal for a wide range of foundation projects including waterway embankments, building foundations, municipal pipeline networks, bridge construction, photovoltaic pile installations, and various civil engineering applications.
Frequently Asked Questions (FAQ)
Q: What is the warranty period?
A: We provide a 12-month warranty from installation completion date, covering mainframe and key components (excluding standard wearing parts).
Q: What is the minimum order quantity?
A: Minimum order quantity is 1 set.
Q: What payment methods are accepted?
A: We accept Telegraphic Transfer (T/T) .
Q: What is the delivery time?
A: Standard delivery time is 7-35 days to Shanghai Port.
Q: Is custom branding available?
A: Yes, we can apply your company logo to equipment upon request.
Q: How is product quality ensured?
A: All equipment is manufactured in strict compliance with national "Technical Conditions for Pile Driver Enterprises" standards.
Q: Do you offer dealership opportunities?
A: We welcome dealership inquiries and look forward to developing partnerships with regional agents and strategic partners.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Seller
Year Established:
2009
Total Annual:
800,000-10,000,0000
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...
Get in touch with us
Leave a Message, we will call you back quickly!