Payment Terms | L/C, T/T, D/P |
Supply Ability | 15 set/month |
Delivery Time | 7-35 days |
Packaging Details | 7.6 |
Name | Hydraulic Vibrating Pile Driver |
Feature | High Precision Suitable for All Brands of Excavator |
Operation Pressure | 32Mpa |
Arm Weight | 750kg |
Hammer Weight | 2700kg |
Vibration Frequency | 3200rpm |
Centrifugal Force | 485 Kn |
Material | Steel, Core materials are all imported |
HS Code | 8430100000 |
Type | New and Used both available |
Brand Name | VIBRA |
Model Number | FV-400 |
Place of Origin | SHANGHAI |
View Detail Information
Explore similar products
45-60T Hydraulic Pile Driver For Excavators , Hydraulic Pile Driving Machine
Eco Friendly Hydraulic Static Pile Driver 670kg Arm Weight 35-40T Excavator
2300 Kg Highly Efficient Hydraulic Pile Driver , Vibratory Hammer Pile Driver
No Pollution Hydraulic Sheet Pile Driver 2700kg Hammer Weight Easy Maintenance
Product Specification
Payment Terms | L/C, T/T, D/P | Supply Ability | 15 set/month |
Delivery Time | 7-35 days | Packaging Details | 7.6 |
Name | Hydraulic Vibrating Pile Driver | Feature | High Precision Suitable for All Brands of Excavator |
Operation Pressure | 32Mpa | Arm Weight | 750kg |
Hammer Weight | 2700kg | Vibration Frequency | 3200rpm |
Centrifugal Force | 485 Kn | Material | Steel, Core materials are all imported |
HS Code | 8430100000 | Type | New and Used both available |
Brand Name | VIBRA | Model Number | FV-400 |
Place of Origin | SHANGHAI | ||
High Light | Coastal Construction Hydraulic Pile Driver ,high accuracy hydraulic pile driver ,H beam hydraulic pile hammer |
Medium and Large Excavator Mounted Hydraulic Vibrating Pile Driver
This series of models have higher requirements for the overall design and manufacturing level. Drawing on the advanced technology of large hydraulic vibration hammer from Europe and America and our years of experience in the industry, we have developed a unique box structure with high reliability and longer average service life of bearings, which is in the leading position in the same industry.
10 ~ 18 meters of sheet pile construction is the mainstream of the market, we provide a variety of eccentric groups for selection, strength optimization for each component, with higher safety and a wide range of adaptability to various geological conditions.
Features
|
|
|
|
|
|
|
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
About Us
Shanghai Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.
Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Company Details
Business Type:
Manufacturer,Importer,Exporter,Seller
Year Established:
2009
Total Annual:
800,000-10,000,0000
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...
Get in touch with us
Leave a Message, we will call you back quickly!