Payment Terms | T/T, D/P, Western Union, MoneyGram |
Supply Ability | 15 set/month |
Delivery Time | 15-35 days |
Packaging Details | 7.616 CBM |
Name | Vibro Sheet Pile Hammer |
Feature | Eco-friendly Pile Driver |
Vibration | 3200 rpm |
Pressure | 32 Mpa |
Centrifugal Force | 455 KN |
Arm | 750 kg |
Hammer | 2600 kg |
Excavator | 40-45 T |
HS Code | 8430100000 |
Material | Steel, Core materials are all imported |
Type | New and Used both available |
Color | Blue/Yellow, customized color available |
Brand Name | VIBRA |
Model Number | FV-350 |
Certification | ISO 9001:2015 |
Place of Origin | SHANGHAI |
View Detail Information
Explore similar products
45-60T Hydraulic Pile Driver For Excavators , Hydraulic Pile Driving Machine
Eco Friendly Hydraulic Static Pile Driver 670kg Arm Weight 35-40T Excavator
2300 Kg Highly Efficient Hydraulic Pile Driver , Vibratory Hammer Pile Driver
No Pollution Hydraulic Sheet Pile Driver 2700kg Hammer Weight Easy Maintenance
Product Specification
Payment Terms | T/T, D/P, Western Union, MoneyGram | Supply Ability | 15 set/month |
Delivery Time | 15-35 days | Packaging Details | 7.616 CBM |
Name | Vibro Sheet Pile Hammer | Feature | Eco-friendly Pile Driver |
Vibration | 3200 rpm | Pressure | 32 Mpa |
Centrifugal Force | 455 KN | Arm | 750 kg |
Hammer | 2600 kg | Excavator | 40-45 T |
HS Code | 8430100000 | Material | Steel, Core materials are all imported |
Type | New and Used both available | Color | Blue/Yellow, customized color available |
Brand Name | VIBRA | Model Number | FV-350 |
Certification | ISO 9001:2015 | Place of Origin | SHANGHAI |
High Light | 15m Sheet Piling Hammer ,Eco friendly Sheet Piling Hammer ,15m sheet pile driving equipment |
Description
VIBRA Vibrating pile hammer is utilizing its high frequency vibration to vibrate pile body with high-speed increase to pass the vertical vibration of mechanical produce to pile which prompting changes in the soil structure around the pile, strength decline. Soil around the piles become liquefaction to lessen frictional opposition between side of the pile and the soil. Then, at that point, utilizing the excavator down power, vibrating pile hammer and pile body weight to sink pile into the soil. When extricating piles, in the state of vibration to take out the pile by utilizing excavator lift power.
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
About Us
YeKun Construction Machinery is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.
The company has a young and enterprising team cooperation, in order to respect the customer value as self value, to become the most reliable, the most comprehensive, the most professional vibration pile machine equipment and service suppliers and make unremitting efforts.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Company Details
Business Type:
Manufacturer,Importer,Exporter,Seller
Year Established:
2009
Total Annual:
800,000-10,000,0000
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...
Get in touch with us
Leave a Message, we will call you back quickly!