| Payment Terms | T/T |
| Supply Ability | 30 set/month |
| Delivery Time | 7~35 DAYS |
| Packaging Details | WOODEN PALLET |
| Eccentric Moment | 4.6 kgm |
| Centrifugal Force | 459 kn |
| Frequency | 2300~3000 rpm |
| Side Clamp Force | 335 kn |
| Bottom Clamp Force | 385 kn |
| Applicable Excarator Class | 20~25 |
| Brand Name | VIBRA |
| Model Number | SV-200 |
| Certification | ISO 9001:2015 |
| Place of Origin | China |
View Detail Information
Explore similar products
800mm Max. Pile Diameter Side Pile Driver – Side Clamping & Easy Operation
High-Efficiency Side Grip Pile Driver: Fast Hydraulic Piling in 9m Depth for
35ton SHANTUI Excavator Side Grip Hydraulic Pile Driver and Smooth Pile Lifting
35ton SHANTUI 335LC Excavator Side Grip Hydraulic Vibro Hammer for 12M Pile
Product Specification
| Payment Terms | T/T | Supply Ability | 30 set/month |
| Delivery Time | 7~35 DAYS | Packaging Details | WOODEN PALLET |
| Eccentric Moment | 4.6 kgm | Centrifugal Force | 459 kn |
| Frequency | 2300~3000 rpm | Side Clamp Force | 335 kn |
| Bottom Clamp Force | 385 kn | Applicable Excarator Class | 20~25 |
| Brand Name | VIBRA | Model Number | SV-200 |
| Certification | ISO 9001:2015 | Place of Origin | China |
| High Light | 20-25 ton hydraulic pile driver ,excavator side grip pile driver ,SV200 pile driver with warranty | ||
The SV200 Side Grip Pile Driver represents the pinnacle of efficiency for foundation construction in restricted environments. As a specialized form of hydraulic vibratory hammer, this model is engineered to transform a standard 20-25 ton excavator into a high-performance piling rig. Designed specifically to overcome the challenges of low clearance and confined spaces common in infrastructure projects, the SV200 integrates bidirectional side tilt and 360-degree continuous rotation to deliver unparalleled versatility. Whether you are driving steel sheet piles, H-beams, or pipe piles, this unit offers a seamless, one-machine solution for clamping, positioning, driving, and extraction.
The defining characteristic of the SV200 is its dual-clamp system. It utilizes both a Side Clamp and a Bottom Clamp to secure piles firmly, allowing for precise manipulation even when overhead space is limited. This design eliminates the need for auxiliary cranes or leaders, drastically reducing equipment logistics on site. The robust fixture system features a replaceable standard clamp seat interface, allowing operators to switch between different pile types quickly. Furthermore, its direct mounting compatibility with standard excavators (20-25 ton class) ensures that modification and installation are minimal, reducing downtime and capital expenditure.
This model is ideally suited for the rapidly growing infrastructure sectors of Southeast Asia, India, and Russia. In东南亚 (Southeast Asia), the compact size is perfect for urban infrastructure and riverine projects. In India, it excels in railway and bridge construction where space is often restricted. For the Russian market, the robust hydraulic system and powerful vibration are well-suited for varied geological conditions, including frozen ground and dense soils.
Q1: Can the SV200 be installed on any excavator?
A1: Yes, the SV200 is designed for easy modification on standard 20-25 ton excavators. The connection bracket is adaptable, making installation straightforward and quick.
Q2: What types of piles can this machine handle?
A2: Thanks to its multi-function fixture system and replaceable clamp interfaces, the SV200 can handle steel sheet piles, H-beams, and circular pipe piles.
Q3: Does it require additional equipment to extract piles?
A3: No. The SV200 is a fully independent unit. The same clamping mechanism used for driving is also used for extraction, allowing the excavator operator to pull piles without any additional machinery.
Q4: How does the rotation function help in low clearance areas?
A4: The 360-degree rotation allows the operator to align the pile perfectly with the guide frame or previous piles without repositioning the excavator. This is critical in low headroom where swinging the boom is restricted.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Seller
Year Established:
2009
Total Annual:
800,000-10,000,0000
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...
Get in touch with us
Leave a Message, we will call you back quickly!