| Payment Terms | T/T |
| Supply Ability | 30 set/month |
| Delivery Time | 7~35 DAYS |
| Packaging Details | WOODEN PALLET |
| Eccentric Moment | 6.6 kgm |
| Centrifugal Force | 656kn |
| Frequency | 2300~3000rpm |
| Side Clamp Force | 465 kn |
| Bottom Clamp Force | 520kn |
| Operation Pressure | 32 mpa |
| Operation Flow | 230~280 l/min |
| Applicable Excarator Class | 32~40 |
| Brand Name | VIBRA |
| Model Number | SV-400 |
| Certification | ISO 9001:2015 |
| Place of Origin | China |
View Detail Information
Explore similar products
800mm Max. Pile Diameter Side Pile Driver – Side Clamping & Easy Operation
High-Efficiency Side Grip Pile Driver: Fast Hydraulic Piling in 9m Depth for
35ton SHANTUI Excavator Side Grip Hydraulic Pile Driver and Smooth Pile Lifting
35ton SHANTUI 335LC Excavator Side Grip Hydraulic Vibro Hammer for 12M Pile
Product Specification
| Payment Terms | T/T | Supply Ability | 30 set/month |
| Delivery Time | 7~35 DAYS | Packaging Details | WOODEN PALLET |
| Eccentric Moment | 6.6 kgm | Centrifugal Force | 656kn |
| Frequency | 2300~3000rpm | Side Clamp Force | 465 kn |
| Bottom Clamp Force | 520kn | Operation Pressure | 32 mpa |
| Operation Flow | 230~280 l/min | Applicable Excarator Class | 32~40 |
| Brand Name | VIBRA | Model Number | SV-400 |
| Certification | ISO 9001:2015 | Place of Origin | China |
| High Light | Heavy-Duty SV400 Hydraulic Pile Driver ,Side Grip Pile Driver for Infrastructure ,SV400 Hydraulic Pile Driver with Warranty | ||
The SV400 Side Grip Pile Driver represents the pinnacle of heavy-duty hydraulic vibratory hammer technology, engineered for large-scale foundation projects that demand exceptional power, reliability, and versatility. Designed for seamless integration with 32-40 ton standard excavators, this advanced piling system transforms your existing heavy machinery into a formidable foundation installation rig. The SV400 excels in challenging environments with low overhead clearance and restricted job sites, such as major bridge constructions, large industrial facilities, and urban infrastructure development. Equipped with a sophisticated dual-clamp system offering 360-degree continuous rotation and bidirectional side tilt, it provides complete mastery over pile handling, positioning, driving, and extraction without requiring auxiliary cranes or support equipment.
The SV400 features an advanced high-capacity dual-clamp mechanism, combining a powerful side clamp and a robust bottom clamp to secure even the heaviest piles with absolute certainty. This design is essential for maintaining precision and operational safety in low-headroom conditions where conventional piling leaders cannot function. The machine incorporates a heavy-duty multi-function fixture system with a rapidly replaceable standard clamp seat interface, enabling quick adaptation to various pile profiles including large steel sheet piles, heavy H-shaped steel beams, and substantial circular pipe piles. Its direct excavator-mount configuration ensures straightforward modification, significantly reducing mobilization time and capital investment compared to dedicated large piling rigs. The reinforced heavy-gauge steel frame and high-displacement hydraulic motor ensure exceptional durability under continuous heavy-duty operation in the most demanding conditions.
| Parameter | Value |
|---|---|
| Unit Weight (Incl. Connector & Clamp) | 3870 kg |
| Eccentric Moment | 6.6 kgm |
| Centrifugal Force | 656 kN |
| Frequency Range | 2300-5000 rpm |
| Side Clamp Force | 465 kN |
| Bottom Clamp Force | 520 kN |
| System Operating Pressure | 32 Mpa |
| System Operating Flow | 280-360 L/min |
| Rotation / Tilt Angle | 360° / ±30° |
| Dimensions (LxWxH) | 1400 x 1315 x 3056 mm |
| Applicable Excavator | 32-40 Ton |
The SV400 is strategically positioned for major contractors in Southeast Asia, India, and Russia who require uncompromising power combined with operational flexibility. In Southeast Asia, it is the preferred solution for large-scale port development, deep foundation works for high-rise buildings, and major river crossing infrastructure. For the Indian market, where mega-infrastructure projects are rapidly transforming the landscape, the SV400 excels in major bridge foundations, metro rail viaducts, and large industrial complex construction. In Russia, where extreme geological conditions including permafrost and dense glacial deposits are common, the high centrifugal force and extended frequency range of the SV400 make it exceptionally adaptable to the most challenging ground conditions, while its low-clearance capability proves invaluable for major industrial facility maintenance and expansion projects in urban environments.
Q1: What excavator size is required for the SV400?
A1: The SV400 is specifically engineered for standard excavators in the 32-40 ton heavy class. The connection bracket can be customized to match different excavator models for secure, reliable attachment.
Q2: What pile types can the SV400 handle effectively?
A2: Thanks to its heavy-duty replaceable clamp seat interface, the SV400 can efficiently handle extra-wide steel sheet piles, heavy H-shaped steel beams, and large-diameter circular pipe piles, making it the ultimate versatile tool for major foundation applications.
Q3: Can this heavy-duty machine perform both driving and extraction?
A3: Yes absolutely. The SV400 is a completely independent piling solution. The same advanced dual-clamp system used for high-force driving is also utilized for powerful extraction, allowing operators to remove even deeply embedded piles quickly without any additional equipment.
Q4: How does the extended frequency range benefit operations?
A4: The 2300-5000 rpm variable frequency range allows operators to adjust the vibration frequency to match specific soil conditions. Higher frequencies are particularly effective in dense soils, while lower frequencies work optimally in softer ground, maximizing driving efficiency across all site conditions.
Q5: What maintenance considerations apply to the SV400?
A5: The SV400 is designed for minimal maintenance with durable, wear-resistant components. Regular inspection of the clamp pads, hydraulic connections, and vibration isolators is recommended. All service points are easily accessible when mounted on the excavator, reducing downtime.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Seller
Year Established:
2009
Total Annual:
800,000-10,000,0000
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...
Get in touch with us
Leave a Message, we will call you back quickly!