| Arm | 750kg |
| Vibration | 3200 rpm |
| Excavator | 35-40 Ton |
| Hydraulicoilflow | 50-150 L/min |
| Hammer Weight | 2600 kg |
| Maximum Piling Depth | 18 meter |
| Payment Terms | T/T |
| Supply Ability | 15 Sets/Month |
| Delivery Time | 7-30 days |
| Packaging Details | 4 to 10 CBM,Pallets and wooden boxes |
| Operatingpressure | 20-35 MPa |
| Eccentric Moment | 9.2 kgm |
| Brand Name | VIBRA |
| Model Number | FV-330 |
| Certification | ISO 9001:2015 |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
45-60T Hydraulic Pile Driver - 18m Max Pile Length & 485KN High Centrifugal
Eco Friendly Hydraulic Static Pile Driver - 670kg Arm Weight & Multi-Pile
Vibratory Hammer Pile Driver: 3200 RPM, 2300 Kg & Easy Maintenance
Easy Maintenance Hydraulic SHEET Pile Driver - 2700kg Hammer & Low Noise
Product Specification
| Arm | 750kg | Vibration | 3200 rpm |
| Excavator | 35-40 Ton | Hydraulicoilflow | 50-150 L/min |
| Hammer Weight | 2600 kg | Maximum Piling Depth | 18 meter |
| Payment Terms | T/T | Supply Ability | 15 Sets/Month |
| Delivery Time | 7-30 days | Packaging Details | 4 to 10 CBM,Pallets and wooden boxes |
| Operatingpressure | 20-35 MPa | Eccentric Moment | 9.2 kgm |
| Brand Name | VIBRA | Model Number | FV-330 |
| Certification | ISO 9001:2015 | Place of Origin | CHINA |
| High Light | Hydraulic pile driver for excavator ,33-40 ton excavator pile driver ,32Mpa pressure hydraulic pile driver | ||
The global shift toward renewable energy has turned solar farms into one of the fastest‑growing construction sectors. Yet driving thousands of thin‑wall steel piles for photovoltaic arrays demands a specialised tool – not a one‑size‑fits-all attachment. The FV-330 PV pile dedicated drilling unit is that tool. Developed exclusively for solar foundation work, this hydraulic vibratory hammer delivers unmatched productivity, precision, and environmental responsibility for projects across Southeast Asia, India, and Russia.
Unlike conventional pile drivers adapted for solar work, the FV-330 is engineered from the ground up for photovoltaic applications. It matches 33–40 ton excavators and delivers 372 kN of centrifugal force at 3200 rpm – enough to drive 12‑meter piles through sandy, clayey, or gravelly ground with exceptional speed. This dedicated design slashes fuel consumption per pile and boosts daily output to 200+ piles, directly improving project economics.
Solar farms often require mixed pile types – round steel pipes for main supports and H‑beams for tracking systems. The FV-330 PV pile dedicated drilling unit handles both with its Quick tool change system. The replaceable standard clamp seat interface allows operators to swap between different jaw configurations in under five minutes without special tools. This eliminates downtime between pile types, keeps the excavator productive, and reduces the need for multiple machines on site – a critical advantage for large‑scale solar developments where schedule pressure is intense.
Precise, responsive control separates professional pile drivers from makeshift attachments. The FV-330 PV pile dedicated drilling unit features a Integrated control valve assembly that consolidates all hydraulic functions – vibration start/stop, frequency adjustment, clamp open/close, and tilt – into a single, compact manifold. This assembly uses imported proportional valves that provide smooth, proportional control from the excavator cab. Each action can be independently controlled, making fine adjustments effortless. This integration not only improves operator comfort but also simplifies maintenance and troubleshooting, as all valves are accessible in one location.
Solar panel rows are spaced tightly to maximise land use, leaving narrow corridors for construction equipment. The FV-330 PV pile dedicated drilling unit excels in these conditions with its Confined space adaptation solution. The unit weighs only 2300 kg (hammer) with a compact envelope that minimises swing radius and height. Combined with the excavator's articulated boom, the FV-330 can work between existing panel rows, under overhead cables, and adjacent to sensitive equipment. This adaptability reduces site preparation costs – no need for wide access roads or crane assistance – and allows pile driving in areas previously considered inaccessible.
Solar farms are often located near residential communities or protected natural areas, making noise pollution a genuine concern. The FV-330 PV pile dedicated drilling unit delivers Low noise eco friendly operation through several design choices. The hydraulic motor is rubber‑isolated from the gearbox, the clamp jaws are lined with damping materials, and the eccentric housing is cast with thicker walls to absorb vibration. Field tests show noise levels approximately 6–8 dBA lower than conventional hammers of similar power – a significant reduction that helps projects meet local noise ordinances and maintain good community relations. Moreover, by using the excavator's existing hydraulic system (no external power pack), the unit eliminates the noise and emissions of a separate diesel engine, further contributing to a greener job site.
Southeast Asia (solar farms on coastal plains, rice paddies, and reclaimed land): The PV pile dedicated drilling unit with Confined space adaptation solution easily navigates narrow dykes and between existing structures. The Low noise eco friendly operation is vital in densely populated areas. The Quick tool change system allows rapid switching between pipe piles and H‑beams for tracking systems.
India (mega solar parks in Rajasthan, Gujarat, and Tamil Nadu): The Integrated control valve assembly provides precise control in hot, dusty conditions. The Confined space adaptation solution enables work in tight arrays, maximising land use. The Low noise eco friendly operation helps projects secure environmental clearances and maintain community acceptance.
Russia (solar farms in southern regions and transitional zones): The Quick tool change system reduces downtime in harsh weather. The Integrated control valve assembly with cold‑rated seals ensures reliable operation at low temperatures. The Confined space adaptation solution allows piling in constrained industrial sites.
| Parameter | Value |
|---|---|
| Vibration Frequency | 3200 rpm |
| Operating Pressure | 32 MPa |
| Centrifugal Force | 372 kN |
| Max. Pile Length | 12 m |
| Arm Weight | 670 kg |
| Hammer Weight | 2300 kg |
| Suitable Excavator | 33–40 tons |
| Clamp Changeover Time | < 5 minutes |
A: The FV-330 PV pile dedicated drilling unit is purpose‑built for solar foundations – not a generic attachment. Every component, from clamp geometry to vibration frequency, is optimised for thin‑wall steel piles used in photovoltaic arrays. This specialization delivers higher pile counts per shift and lower fuel costs compared to adapted general‑purpose hammers.
A: The Quick tool change system allows the operator to swap between different clamp jaw sets (for round pipes, H‑beams, or sheet piles) in under five minutes using standard hand tools. This eliminates downtime between pile types, keeps the excavator productive, and reduces the need for multiple machines – a significant cost saving.
A: The Integrated control valve assembly consolidates all hydraulic functions into one compact manifold. It provides smooth, proportional control from the cab, simplifies maintenance, and enhances reliability. Independent control of each action allows precise fine‑tuning for varying ground conditions.
A: The Confined space adaptation solution combines a lightweight, compact hammer design with a minimal swing radius, allowing operation in narrow corridors between solar panel rows. This reduces site preparation costs and enables piling in areas previously considered inaccessible.
A: The Low noise eco friendly operation is achieved through rubber‑isolated motors, damped clamp jaws, and a thick‑walled cast housing – reducing noise by 6–8 dBA versus conventional hammers. Using the excavator’s own hydraulic system eliminates an external diesel engine, cutting both noise and emissions, which helps meet local environmental regulations.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Seller
Year Established:
2009
Total Annual:
800,000-10,000,0000
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...
Get in touch with us
Leave a Message, we will call you back quickly!