| Payment Terms | T/T |
| Supply Ability | 15 Sets/Month |
| Delivery Time | 7-30 days |
| Packaging Details | 4 to 10 CBM,Pallets and wooden boxes |
| Brand Name | VIBRA |
| Model Number | FV-800 |
| Certification | ISO 9001:2015 |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
Pile Driver : High Vibration Force & Stable Operation | Four Eccentric Model For
Versatile Excavator-Mounted Pile Driver: 24m Max Depth & Universal Compatibility
Maximum 1500kN Force Pile Driver on Integrated Four-Wheel Electric Chassis
VIBRA Pile Driver For 50-65ton Excavators
Product Specification
| Payment Terms | T/T | Supply Ability | 15 Sets/Month |
| Delivery Time | 7-30 days | Packaging Details | 4 to 10 CBM,Pallets and wooden boxes |
| Brand Name | VIBRA | Model Number | FV-800 |
| Certification | ISO 9001:2015 | Place of Origin | CHINA |
| High Light | hydraulic press pile driver 2000kN pulling force ,high-efficiency pile driver four eccentric ,hydraulic pile driver with maximum pulling force | ||
Product Keywords: Four Eccentric Pile Driver, Hydraulic Pile Driver, Heavy-Duty Piling Rig, High Pulling Force Pile Driver, Foundation Construction Equipment, Large Diameter Pile Installation, 2000kN Pile Extractor.
This product is engineered for large-scale infrastructure development in regions with demanding soil conditions and ambitious construction timelines. Our primary markets include Russia, Central Asia (e.g., Kazakhstan, Uzbekistan), and the Middle East. The ideal customer groups are heavy civil engineering contractors, large infrastructure development firms, port and bridge construction specialists, and government project entities involved in highways, railways, industrial plants, and high-rise foundations.
The VIBRA Four Eccentric Pile Driver represents the pinnacle of hydraulic piling technology, designed for the most challenging foundation projects. Its unique four-eccentric rotor system generates immense, balanced forces for driving and extracting piles with unmatched power and control. Built for durability and maximum uptime, it is the go-to solution for contractors who cannot afford compromise on performance or reliability when working with large-diameter piles (up to 1000mm) in tough geological conditions.
Unmatched Force Capability: Delivers a formidable 1500kN driving force, a 2000kN pulling (extraction) force, and a 2000kN crowd force. This triple-power capability ensures efficient installation to precise depths and easy extraction when needed, handling the full piling cycle with one robust machine.
Designed for Large-Scale Projects: Excels at installing large-diameter piles (up to 1000mm) and extra-long piles (with models handling up to 32 meters). It is perfectly suited for the deep foundations required for skyscrapers, long-span bridges, and offshore structures.
Superior Four-Eccentric Design: This advanced design provides smoother operation, reduced wear and tear, and more efficient force transmission compared to standard vibratory hammers, leading to greater fuel efficiency and lower long-term operating costs.
Robust Compatibility: Engineered to integrate seamlessly with large carrier machines, with models compatible with excavators ranging from 48 to 100 tons. This ensures stability and maximizes power transfer during operation.
| Model | Vibration Frequency (rpm) | Operating Pressure (MPa) | Centrifugal Force (kN) | Max. Pile Length (m) | Hammer Weight (kg) | Compatible Excavator (tons) |
|---|---|---|---|---|---|---|
| FV-500 | 2800 | 30 | 759 | 18 | 3500 | 48-52 |
| FV-600 | 2700 | 32 | 818 | 21 | 3750 | 50-65 |
| FV-700 | 2600 | 32 | 915 | 24 | 3850 | 65-75 |
| FV-800 | 2500 | 32 | 997 | 27 | 4200 | 75-85 |
| FV-900 | 2400 | 32 | 1064 | 32 | 4350 | 85-100 |
Q: What is the delivery and production lead time?
A: Delivery typically takes 7-30 days. We maintain a supply capacity of 15 sets per month to meet urgent project schedules.
Q: What are the payment and order terms?
A: We offer flexible terms with a Minimum Order Quantity (MOQ) of 1 set. Payment can be arranged via T/T (Telegraphic Transfer).
Q: Is this machine suitable for extreme cold climates like Siberia?
A: Yes. Our hydraulic systems and structural components are specifically specified and tested for reliable operation in low-temperature environments.
Q: Can it handle both steel pipe piles and precast concrete piles?
A: Absolutely. The Four Eccentric Pile Driver is versatile and effective for driving steel, concrete, and timber piles.
Q: What kind of after-sales support is provided?
A: We provide comprehensive support including detailed operation manuals, online technical assistance, and can facilitate access to a network of service partners and genuine spare parts in your region.
Investing in the VIBRA Four Eccentric Pile Driver means investing in a powerhouse of productivity and reliability, engineered to conquer the toughest piling challenges and keep your major infrastructure projects on track.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Seller
Year Established:
2009
Total Annual:
800,000-10,000,0000
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...
Get in touch with us
Leave a Message, we will call you back quickly!