China factories

Chat Now Send Email
China factory - Shanghai Yekun Construction Machinery Co., Ltd.

Shanghai Yekun Construction Machinery Co., Ltd.

  • China,Shanghai ,Shanghai
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China High-Flow Merging Valve Unit Pile Driver – Four Eccentric Pile Driver With
China High-Flow Merging Valve Unit Pile Driver – Four Eccentric Pile Driver With

  1. China High-Flow Merging Valve Unit Pile Driver – Four Eccentric Pile Driver With
  2. China High-Flow Merging Valve Unit Pile Driver – Four Eccentric Pile Driver With
  3. China High-Flow Merging Valve Unit Pile Driver – Four Eccentric Pile Driver With
  4. China High-Flow Merging Valve Unit Pile Driver – Four Eccentric Pile Driver With
  5. China High-Flow Merging Valve Unit Pile Driver – Four Eccentric Pile Driver With

High-Flow Merging Valve Unit Pile Driver – Four Eccentric Pile Driver With

  1. MOQ: 1 SET
  2. Price: Negotiation
  3. Get Latest Price
Centrifugal Force 818 Kn
Eccentric Moment 10.2 kgm
Max.Pile Length 21 m
Vibration Frequency 2700 rpm
Operation Pressure 32 Mpa
Suitable Excavator 50~65 ton
Payment Terms T/T
Supply Ability 15 Sets/Month
Delivery Time 7~30 days
Packaging Details 4 to 10 CBM,Pallets and wooden boxes
Arm Weight 900 kg
Hammer Weight 3750 kg
Work Flow 350 L/min
Brand Name VIBRA
Model Number FV-600
Certification ISO 9001:2015
Place of Origin CHINA

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Centrifugal Force 818 Kn Eccentric Moment 10.2 kgm
Max.Pile Length 21 m Vibration Frequency 2700 rpm
Operation Pressure 32 Mpa Suitable Excavator 50~65 ton
Payment Terms T/T Supply Ability 15 Sets/Month
Delivery Time 7~30 days Packaging Details 4 to 10 CBM,Pallets and wooden boxes
Arm Weight 900 kg Hammer Weight 3750 kg
Work Flow 350 L/min Brand Name VIBRA
Model Number FV-600 Certification ISO 9001:2015
Place of Origin CHINA
High Light 1500kN force pile driverfour-wheel electric chassis pile drivereccentric pile driver with warranty
Introduction

The FV-600 is a heavy-duty Four eccentric pile driver engineered for 50–65 ton excavators, designed to drive and extract large steel sheet piles, steel casings, and PC hybrid piles up to 21 meters in length. This machine combines high frequency vibration output (2700 rpm) with robust hydraulic power to overcome the most challenging ground conditions. The self lubricating bearing low maintenance system, integrated inside the gearbox, dramatically extends bearing life and ensures core stability under continuous heavy operation. Equipped with a High-flow merging valve unit, the FV-600 can increase flow to 700 L/min (with 1.5 inch body piping) for maximum excitation force when needed. The integrated control valve assembly provides independent control of each action, simplifying maintenance and extending component life. With German FAG bearings, original Parker motors, and a super‑strong cast steel clamp (650 kN clamping force), the FV-600 is the ultimate piling solution for large‑scale infrastructure projects across Southeast Asia, India, and Russia.

Key Features & Advantages (Integrating the 5 Keywords)
Feature Benefit for Large-Scale Piling Projects
Four eccentric pile driver Patented four‑eccentric mechanism delivers perfectly balanced vibration. Horizontal forces cancel out while vertical forces sum up, producing maximum impact with minimal lateral movement. Drives long piles (up to 21 m) straight and true, reducing rejection rates.
High frequency vibration output (2700 rpm) Rapid soil liquefaction reduces friction dramatically. Penetrates hard clay, dense sand, and frozen layers 30–40% faster than standard hammers. Keeps large infrastructure projects on schedule.
Self lubricating bearing low maintenance Built‑in lubrication circuit continuously supplies oil to all bearings. Eliminates daily greasing of hard‑to‑reach points, extends bearing life significantly, and maintains core stability under extreme loads. Perfect for remote job sites with limited maintenance facilities.
High-flow merging valve unit Large‑flow combining valve increases hydraulic flow to 700 L/min (standard 350 L/min). When activated, it boosts excitation force to overcome unexpected hard layers. Body piping enlarged to 1.5 inches reduces pressure loss. Ideal for deep pile driving in glacial till or weathered rock.
Integrated control valve assembly Fully electronic control system with independent valve sections for clamp, rotation, and vibration. Allows precise operation, reduces shock loads, and extends component life. Easy diagnostics and maintenance – each function can be checked separately.

Additional specifications from the catalog (FV-600):

  • Vibration frequency: 2700 rpm

  • Eccentric moment: 10.2 kgm

  • Working pressure: 32 MPa

  • Standard flow: 350 L/min | Merging flow: up to 700 L/min

  • Centrifugal force: 818 kN

  • Max pile length: 21 m

  • Arm weight: 900 kg | Hammer weight: 3750 kg

  • Suitable excavator: 50–65 tons

  • Clamping force: 650 kN (cast steel clamp, 160‑180 mm cylinders)

  • Bearings: German FAG | Motors: Original Parker | Gears: High‑end components

Technical Parameters – FV-600
Parameter Value
Vibration Frequency 2700 rpm
Eccentric Moment 10.2 kgm
Working Pressure 32 MPa
Standard Flow 350 L/min
Merging Flow (High-flow valve) up to 700 L/min
Centrifugal Force 818 kN
Max. Pile Length 21 m
Arm Weight 900 kg
Hammer Weight 3750 kg
Suitable Excavator 50 – 65 tons
Max Clamping Force 650 kN
Why FV-600 for Southeast Asia, India & Russia

Southeast Asia (port terminals, deep foundations, soft to medium soil)

  • Four eccentric pile driver ensures straight driving of long sheet piles for Singapore‑style deep seaports or Bangkok flood barriers.

  • Self lubricating bearing low maintenance reduces downtime in tropical humidity where regular greasing is difficult.

  • High-flow merging valve unit provides extra power when hitting unexpected dense sand layers.

India (large bridge piers, metro viaducts, mixed ground)

  • Integrated control valve assembly allows precise clamping and vibration control – critical when working near sensitive existing structures.

  • High frequency vibration output speeds up piling for high‑speed rail bridges, reducing project timelines.

  • High-flow merging valve unit overcomes weathered rock and gravel layers common in Western Ghats and Deccan Plateau.

Russia (permafrost, industrial deep piles, extreme cold)

  • Self lubricating bearing low maintenance eliminates cold‑weather greasing challenges – no need to expose operators to -30°C for daily lubrication.

  • Four eccentric pile driver with German bearings and low‑temperature seals operates reliably in Arctic conditions.

  • High-flow merging valve unit delivers the extra impact needed to break through frozen active layers and permafrost.

FAQ (Frequently Asked Questions)
Q1: What is the advantage of a four eccentric pile driver over traditional two‑eccentric designs?

A: The Four eccentric pile driver provides superior vibration balance. Horizontal forces cancel almost completely, minimizing lateral movement and vibration transmission to the excavator. Vertical forces sum up to produce higher impact energy per blow, allowing faster penetration and straighter piles – especially important for long piles (up to 21 m).

Q2: How does the self lubricating bearing low maintenance system work?

A: The gearbox contains an internal oil circulation circuit that continuously supplies lubrication to all bearings. This eliminates the need for daily manual greasing of difficult‑to‑reach points, extends bearing life significantly, and maintains core stability even under heavy, continuous operation. Regular oil level checks every 200 hours are recommended.

Q3: What is the High-flow merging valve unit and when should I use it?

A: The High-flow merging valve unit combines flow from two hydraulic circuits (or boosts pump flow) to increase total flow to 700 L/min. Use it when you encounter unexpectedly hard ground – dense gravel, weathered rock, or permafrost – that the standard 350 L/min cannot penetrate efficiently. It provides a temporary power boost for critical sections.

Q4: What does the integrated control valve assembly do?

A: The integrated control valve assembly is a compact, electronically managed valve block that independently controls clamp opening/closing, rotation, and vibration. Each function has its own circuit, allowing precise modulation. This reduces shock loads, improves operator control, and makes troubleshooting easy – if one function fails, you can isolate it quickly.

Q5: What excavator size is required for the FV-600?

A: The FV-600 fits 50–65 ton excavators. It requires a hydraulic flow of 350 L/min at 32 MPa (with merging capacity up to 700 L/min). Compatible models include Komatsu PC490‑PC650, Hitachi ZX470‑ZX650, Liebherr R950‑R970, Sany SY485‑SY650, and similar class carriers.

Q6: Can the FV-600 drive piles longer than 21 meters?

A: While the FV-600 is rated for 21 m max pile length, the four eccentric series includes larger models (FV-700 to FV-900) capable of driving piles up to 32 m. Contact us for specific recommendations based on your pile type and ground conditions.

Q7: How does the self lubricating bearing low maintenance benefit cold climate operation?

A: In extreme cold (-30°C), conventional greases become thick and may not flow into bearing races. The self lubricating bearing low maintenance system uses a continuous oil bath with low‑temperature hydraulic oil, ensuring reliable lubrication without daily manual greasing. This reduces operator exposure to hazardous cold and prevents bearing starvation.

Q8: What maintenance is required for the integrated control valve assembly?

A: The valve assembly is sealed and requires no internal maintenance. Regularly check electrical connections and solenoid coils. Keep the valve block clean to prevent contamination. The electronic control unit (ECU) has self‑diagnostic LEDs – refer to the manual for error codes. Annual calibration is recommended for high‑utilization machines.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Seller

  • Year Established:

    2009

  • Total Annual:

    800,000-10,000,0000

  • Employee Number:

    60~80

  • Ecer Certification:

    Verified Supplier

Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...

+ Read More

Get in touch with us

  • Reach Us
  • Shanghai Yekun Construction Machinery Co., Ltd.
  • No.3652, Cao'an Road, Jiading district, Shanghai
  • https://www.hydraulic-piledriver.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement