China Side Grip Pile Driver | High Frequency Vibration Output & Confined Space
China Side Grip Pile Driver | High Frequency Vibration Output & Confined Space

  1. China Side Grip Pile Driver | High Frequency Vibration Output & Confined Space
  2. China Side Grip Pile Driver | High Frequency Vibration Output & Confined Space
  3. China Side Grip Pile Driver | High Frequency Vibration Output & Confined Space
  4. China Side Grip Pile Driver | High Frequency Vibration Output & Confined Space
  5. China Side Grip Pile Driver | High Frequency Vibration Output & Confined Space
  6. China Side Grip Pile Driver | High Frequency Vibration Output & Confined Space

Side Grip Pile Driver | High Frequency Vibration Output & Confined Space

  1. MOQ: 1 set
  2. Price: Negotiation
  3. Get Latest Price
Side Clamp Force 385 kn
Applicable Excavator 25~32 ton
Frequency 2300~3000rpm
Operation Flow 220~280 l/min
Payment Terms T/T
Supply Ability 30 set/month
Delivery Time 7~35 days
Packaging Details wooden pallet
Eccentric Moment 5.6 kgm
Bottom Clamp Force 490 kn
Centrifugal Force 558kn
Operation Pressure 32 mpa
Rotate Degree 360±30°
Brand Name VIBRA
Model Number SV-300
Certification ISO 9001:2015
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Side Clamp Force 385 kn Applicable Excavator 25~32 ton
Frequency 2300~3000rpm Operation Flow 220~280 l/min
Payment Terms T/T Supply Ability 30 set/month
Delivery Time 7~35 days Packaging Details wooden pallet
Eccentric Moment 5.6 kgm Bottom Clamp Force 490 kn
Centrifugal Force 558kn Operation Pressure 32 mpa
Rotate Degree 360±30° Brand Name VIBRA
Model Number SV-300 Certification ISO 9001:2015
Place of Origin China
High Light compact side grip pile driverpile driver for tight spacesside grip construction pile driver
Introduction

The SV-300 is a specialized Side grip pile driver – a unique form of hydraulic vibratory hammer engineered for low headroom and confined spaces. Unlike conventional pile drivers that require tall vertical clearance, the SV-300 mounts directly to 25–32 ton excavators and operates efficiently under bridges, inside factories, in tunnels, and along railway lines. As a Hydraulic pile driver, it connects directly to the excavator’s auxiliary circuit (32 MPa, 220–280 L/min), eliminating the need for an external power pack. The machine delivers high frequency vibration output (2300–3000 rpm) and high impact energy per blow (559 kN centrifugal force), rapidly liquefying surrounding soil to reduce friction and drive piles with exceptional speed. The SV-300 is a complete confined space adaptation solution – its compact overall height (2923 mm with clamp) and integrated side‑grip mechanism allow pile driving in vertical clearances as low as 3.3–3.8 meters. One machine handles clamping, positioning, driving, and extraction, with a replaceable clamp interface for steel sheet piles, H‑beams, and circular pipes. For contractors working in space‑constrained environments across Southeast Asia, India, and Russia, the SV-300 delivers unmatched productivity and reliability.

Key Features & Advantages (Integrating the 5 Keywords)
Feature Benefit for Low Headroom & Confined Space Projects
Side grip pile driver Lateral clamping design eliminates the need for tall leaders. The side clamp grips the pile while the bottom clamp provides additional stability. One device completes the entire piling cycle without auxiliary equipment – ideal for sites where space is at a premium.
High frequency vibration output (2300–3000 rpm) Rapid vibration cycles break soil structure and reduce friction instantly. Penetrates clay, sand, and mixed soils faster than low‑frequency hammers. The two‑stage frequency control (2300–3000 rpm) allows operators to match vibration to ground conditions.
Hydraulic pile driver system Direct connection to the excavator’s hydraulic circuit – no external power unit required. Saves fuel, transport cost, and maintenance. The system operates at 32 MPa with 220–280 L/min flow, fully compatible with 25–32 ton carriers ( Komatsu PC300, Hitachi ZX300, etc.).
Confined space adaptation solution Engineered from the ground up for low headroom. Overall height just 2923 mm (including connector and clamp). Works under bridge decks, inside factory roofs, in tunnels, and between building columns. The side‑grip design keeps the hammer’s height to a minimum while maintaining full functionality.
High impact energy per blow (559 kN) Each vibration cycle delivers a powerful 559 kN centrifugal force. Overcomes compacted layers, gravel pockets, and light rock. Ensures straight pile penetration even in difficult ground – critical for deep foundations and load‑bearing piles.

Additional specifications from the catalog:

  • Eccentric moment: 5.6 kgm

  • Frequency range: 2300–3000 rpm (adjustable)

  • Side clamp force: 385 kN | Bottom clamp force: 490 kN

  • Working pressure: 32 MPa | Working flow: 220–280 L/min

  • Rotation angle: 360° | Tilt angle: ±30°

  • Dimensions (L×W×H): 1343×1230×2923 mm

  • Weight (including connector and clamp): 3150 kg

  • Suitable excavator: 25–32 tons

Technical Parameters – SV-300
Parameter Value
Eccentric Moment 5.6 kgm
Centrifugal Force 559 kN
Frequency Range 2300 – 3000 rpm
Side Clamp Force 385 kN
Bottom Clamp Force 490 kN
Working Pressure 32 MPa
Working Flow 220 – 280 L/min
Rotation Angle 360°
Tilt Angle ±30°
Dimensions (L×W×H) 1343×1230×2923 mm
Weight (incl. connector & clamp) 3150 kg
Suitable Excavator 25 – 32 tons
Why SV-300 for Southeast Asia, India & Russia

Southeast Asia (factory additions, bridge widening, tunnel construction)

  • Confined space adaptation solution is essential for working under existing elevated highways in Bangkok, Jakarta, and Manila. Many widening projects require pile driving directly beneath the deck with less than 4 m clearance – the SV-300 fits perfectly.

  • High frequency vibration output minimizes soil liquefaction in soft marine clay, while high impact energy per blow ensures piles reach design depth quickly.

  • Side grip pile driver design allows operators to work along canal walls and drainage channels without repositioning the excavator.

India (flyover under‑deck work, metro rail, industrial sheds)

  • Hydraulic pile driver integration with standard 25–32T excavators reduces fleet cost by up to 40% compared to dedicated piling rigs – a major advantage for price‑sensitive infrastructure projects.

  • Confined space adaptation solution enables pile driving inside factory expansions where overhead cranes or roof trusses limit vertical space.

  • High impact energy per blow (559 kN) powers through mixed soils – from the alluvial deposits of Delhi NCR to the weathered rock of Bengaluru.

Russia (industrial plant retrofits, bridge repairs, winter enclosures)

  • Confined space adaptation solution allows pile driving inside heated temporary enclosures during winter, maintaining productivity even at -30°C.

  • High frequency vibration output breaks through frozen topsoil and permafrost active layers quickly, reducing cycle times.

  • Hydraulic pile driver with robust seals and high‑grade steel operates reliably in extreme cold. The high impact energy per blow overcomes frost‑heaved ground with ease.

FAQ (Frequently Asked Questions)
Q1: What makes the SV-300 a confined space adaptation solution?

A: Traditional pile drivers require tall leaders (often 6–10 m vertical clearance). The Side grip pile driver design grips piles laterally, drastically reducing overall height. At just 2923 mm total height, the SV-300 is a dedicated confined space adaptation solution for bridge under‑decks, factory interiors, tunnels, and railway underpasses with less than 4 m clearance.

Q2: How does high frequency vibration output improve performance?

A: High frequency vibration output (2300–3000 rpm) causes rapid soil liquefaction around the pile, reducing friction by up to 80%. The pile penetrates faster, with less resistance, and with lower stress on the excavator. The two‑stage frequency control lets you select lower rpm for loose soils and higher rpm for dense layers.

Q3: Do I need a separate power pack for this Hydraulic pile driver?

A: No. The SV-300 is a true Hydraulic pile driver that runs directly from your excavator’s auxiliary circuit. Required flow is 220–280 L/min at 32 MPa – well within the range of 25–32 ton excavators from Komatsu, Hitachi,  Sany, and others. No external power pack means lower cost, simpler maintenance, and easier transport.

Q4: Can it drive piles at an angle?

A: Yes. The SV-300 includes a bidirectional tilt function (±30 degrees), allowing batter piles for retaining walls, slope protection, and riverbank reinforcement. Combined with 360° rotation, you can position the pile at virtually any orientation without moving the excavator.

Q5: What is the real‑world high impact energy per blow?

A: The high impact energy per blow is 559 kN centrifugal force. Each vibration cycle delivers this force to the pile head. In practical terms, it can drive steel sheet piles and pipe piles up to 12–15 meters in medium‑dense soils, and 8–10 meters in stiff clay or gravelly layers.

Q6: What pile types can the SV-300 handle?

A: With the optional quick‑change clamp interfaces (available as an accessory), the SV-300 handles:

  • U‑type and Z‑type steel sheet piles (most profiles)

  • H‑beams (wide and medium flange)

  • Circular steel pipe piles (diameters 200–600 mm)

  • Precast concrete piles (with rubber jaw pads)

Q7: How does confined space adaptation benefit bridge rehabilitation?

A: When strengthening or widening an existing bridge, you often need to drive new piles directly under the deck where clearance is only 3.5–4 meters. Conventional pile drivers cannot enter this space. The SV-300’s confined space adaptation solution allows you to work under the live bridge without closing traffic – saving weeks of road closure and millions in detour costs.

Q8: What maintenance is required?

A: The Hydraulic pile driver system uses standard excavator hydraulic oil. Regular greasing of the slewing ring and tilt pivots every 50 hours is recommended. The clamp jaws should be inspected for wear after 500 operating hours. No special tools or training are required.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Seller

  • Year Established:

    2009

  • Total Annual:

    800,000-10,000,0000

  • Employee Number:

    60~80

  • Ecer Certification:

    Verified Supplier

Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...

+ Read More

Get in touch with us

  • Reach Us
  • Shanghai Yekun Construction Machinery Co., Ltd.
  • No.3652, Cao'an Road, Jiading district, Shanghai
  • https://www.hydraulic-piledriver.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement