Payment Terms | T/T |
Supply Ability | 1+unit+4 months |
Delivery Time | 120 wordking days |
Packaging Details | plywood |
runner material | stainless steel |
body | steel casting |
capacity | 500kw |
runner Diameter | 0.63 m |
flow | 0.58 m³/s |
head | 110 m |
Brand Name | Wawushan |
Model Number | XJ-011 |
Place of Origin | China |
View Detail Information
Explore similar products
4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine
Brushless Turgo Impulse Turbine 400kw Turgo Hydro Generator
High Water Head Horizontal Pelton Turbine 1000kw Small Flow
Vertical Pelton Wheel Micro Hydro Generator 500RPM 91% Efficiency
Product Specification
Payment Terms | T/T | Supply Ability | 1+unit+4 months |
Delivery Time | 120 wordking days | Packaging Details | plywood |
runner material | stainless steel | body | steel casting |
capacity | 500kw | runner Diameter | 0.63 m |
flow | 0.58 m³/s | head | 110 m |
Brand Name | Wawushan | Model Number | XJ-011 |
Place of Origin | China | ||
High Light | 110m Head Turgo Impulse Turbine ,Abrasion Resistance Turgo Water Turbine ,110m Head turgo hydro turbine |
500kw Turgo Hydro Generator For Hydro Power Plant
overview
Turgo turbine compared with tangential impulse or called pelton one has a lot of advantage such as higher specific speed,wide range of application as well as easy match directive driving generator,except wide range of application as well as easy match directive driving generator,except simple of construction, reliable operation,convenience in operation and maintenance etc.
Turgo or inclined-jet implulse turbine is a kind of impluse turbine. its nozzle make the angle of 22.5° with roating palne of the runner. water come from reservoir or forebay enters the nozzle via a penstock and the intake pipe becomes high veloocity jet, then the jet injects the vanes of runner. the water flow enters in the inlet of vane and go out of the vane. the turbine does a work. its output drives a generator via shaft and couipling.
Advantages
Covers the boundary between Francis and Pelton
Limits Over-Pressure Effect over the penstock
Higher speed = weight and cost reduction
Maintains efficiency over a wide flow range
Superior abrasion resistance
Ease of operation and maintenance
Specification
Name | 500kw Turgo water turine Generator |
Water Head | 110.0m |
Runner Diameters | 0.58 m |
Capacity2 | 500KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
our service:
1. The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c. Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2003
Total Annual:
800-1000
Employee Number:
70~110
Ecer Certification:
Verified Supplier
Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe... Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...
Get in touch with us
Leave a Message, we will call you back quickly!