China factories

China factory - Hongya Power Generating Equipment To Utilities Limited

Hongya Power Generating Equipment To Utilities Limited

  • China
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydraelectric Turbine
China Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydraelectric Turbine

  1. China Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydraelectric Turbine
  2. China Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydraelectric Turbine

Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydraelectric Turbine

  1. MOQ: 1
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 1+unit+4 months
Delivery Time 120 wordking days
Packaging Details plywood
runner material stainless steel
body steel casting
capacity 550kw
runner Dia 0.61m
flow 0.64
head 103m
Brand Name Wawushan
Model Number XJ-015
Place of Origin China
Certification ISO9001

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 1+unit+4 months
Delivery Time 120 wordking days Packaging Details plywood
runner material stainless steel body steel casting
capacity 550kw runner Dia 0.61m
flow 0.64 head 103m
Brand Name Wawushan Model Number XJ-015
Place of Origin China Certification ISO9001
High Light Long Lifespan Turgo Wheel TurbineISO9001 Turgo Wheel TurbineLong Lifespan turgo wheel generator

550kw Turgo Wheel Turbine For Micro Hydro Generator

 

overview

 

We can supply hydraulic turbines system , hydro turbine system such as kaplan turbine, propeller turbine, francis turbine and pelton turbine, turgo turbine and so on, also with speed governor, generator, valves, excitation system and its other accessories.
In order to guarantee the product quality,the company has advanced testing instruments and strictly defers to ISO9001 quality management system.It is strictly controlled the quality in every process to assure the high level,fineness and no bug of products.
Regardless of size, all turbines are manufactured with only high-quality components, and undergo rigid quality inspections to ensure high efficiency and reliable operation.

Deflector speed control giving a fast response to load / frequency changes

Modular design approach

Flexibility in turbine design, layout and configuration

No penstock surge in response to a change in load or frequency

No penstock surge on emergency shutdown on loss of grid

Operation possible down to 10% of rated flow

A higher annual energy may be possible than is available from reaction turbines

on projects with long periods of low flow

 

Specification

 

Name 550kw Turgo Wheel Turbine
Water Head 103.0m
Runner Diameters 0.64 m
Capacity2 550KW
Frequency 50HZ
Generator Voltage 400V
Layout pattern vertical
Material(blades) Stainless Steel ZG0Cr13Ni4Mo
Excitation Brushless
Generator Insulation F/F
Lifespan 50 years

 

Advantages 

 

Covers the boundary between Francis and Pelton

Limits Over-Pressure Effect over the penstock

Higher speed = weight and cost reduction

Maintains efficiency over a wide flow range

Superior abrasion resistance

Ease of operation and maintenance

 

1. The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c. Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2003

  • Total Annual:

    800-1000

  • Employee Number:

    70~110

  • Ecer Certification:

    Verified Supplier

  Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...   Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...

+ Read More

Get in touch with us

  • Reach Us
  • Hongya Power Generating Equipment To Utilities Limited
  • Anxi village, Yuping town,Hongya county, China
  • https://www.hydraulic-turbine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement