CertifiC-A-Tion | ISO/CE |
Payment Terms | L/C, D/A, D/P, T/T, MoneyGram, Western Union |
Supply Ability | 400pcs/day |
Delivery Time | 1-3work days |
Packaging Details | Carton |
Product name | Engine Turbocharger for Excavator |
Engine Model | C-A-T C12 |
Condition | 100%New |
Size | Standard Size |
Material | Aluminum/Iron |
Quality | High quality |
Packing | Paper Box or Fumigation wooden box |
Delivery time | Depends on your order |
Model Number | C12 |
Place of Origin | GUANGZHOU |
Brand Name | Wakestone |
View Detail Information
Explore similar products
8PK1480 Fan Belt For Komatsu PC200-7 Excavator
Pc60 Pc70 Pc100 Connecting Rod For Excavator 4d95/4d102 Engine Accessories
PC200-6 PC200-7 PC200-8 PC220-8 Excavator Fan Blade Cooling Fan For 6d102 Engine
ZAX200 ZAX210 Excavator Fan Blade Cooling Fan For 6BG1 6BG1T Engine Parts
Product Specification
CertifiC-A-Tion | ISO/CE | Payment Terms | L/C, D/A, D/P, T/T, MoneyGram, Western Union |
Supply Ability | 400pcs/day | Delivery Time | 1-3work days |
Packaging Details | Carton | Product name | Engine Turbocharger for Excavator |
Engine Model | C-A-T C12 | Condition | 100%New |
Size | Standard Size | Material | Aluminum/Iron |
Quality | High quality | Packing | Paper Box or Fumigation wooden box |
Delivery time | Depends on your order | Model Number | C12 |
Place of Origin | GUANGZHOU | Brand Name | Wakestone |
High Light | C12 Engine Turbocharger ,190-6222 Turbocharger ,Excavator Parts Turbocharger |
Excavator Parts Turbocharger 190-6222 For C12 Engine
SpecifiC-A-Tion
About the product:
How to choose the right supercharger to improve the performance of the C12 engine of the excavator?
Choosing a suitable supercharger to improve the performance of the excavator C12 engine requires the following factors to be considered:
1. Power requirements: Determine the expected power output range of the excavator. Determine how much rated power and peak power are required based on the excavator's usage and workload.
2. Air pressure requirements: Consider the altitude and climate conditions where the excavator is working. The air pressure is lower in high altitude areas, and stronger supercharging capacity may be required to compensate for air pressure losses.
3. Engine size and structure: Understand the displacement, number and arrangement of the excavator C12 engine, as well as its maximum torque and speed range. These parameters will affect the adaptability and efficiency of the supercharger.
4. AppliC-A-Tion environment: Consider the use environment of the excavator, including the conditions of the work site and the characteristics of the workload. If the excavator needs to work for a long time under heavy load or high temperature environment, it is necessary to choose a supercharger with high durability and heat dissipation performance.
5. Supplier and quality: Choose a reliable supercharger supplier to ensure that its products have good quality and after-sales service support.
Why choose Us
1.Rich Experience: We are manufacturer
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2012
Total Annual:
20000000-50000000
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Guangzhou Zhenhui Machinery Co., Ltd. was established in 2012. It is a modern enterprise specializing in the production of excavator accessories and various supporting operating devices for excavators. It has various imported high-end production equipment and precision testing equipment from Germany... Guangzhou Zhenhui Machinery Co., Ltd. was established in 2012. It is a modern enterprise specializing in the production of excavator accessories and various supporting operating devices for excavators. It has various imported high-end production equipment and precision testing equipment from Germany...
Get in touch with us
Leave a Message, we will call you back quickly!