| Voltage Rating | 1kV |
| Capacitance | 220pF |
| Temperature Coefficient | Y5P |
| Tolerance | ±10% |
| Pin Spacing | 6.4mm |
| Description | 1kV 220pF Y5P ±10% Ceramic Capacitors RoHS |
| Mfr. Part # | GP322 |
| Model Number | GP322 |
View Detail Information
Explore similar products
Ceramic capacitor AIDE CAPACITOR 1210X7R476K100NT designed for switch power
ceramic capacitor AIDE CAPACITOR 0603X7R105K100NT for energy saving lamps and
Multi Layer Ceramic Capacitors with CCTC TCC0603X5R105K500CT Specification and
Surface mount multilayer ceramic capacitors Chinocera HHV0805R7102K201NTHJ with
Product Specification
| Voltage Rating | 1kV | Capacitance | 220pF |
| Temperature Coefficient | Y5P | Tolerance | ±10% |
| Pin Spacing | 6.4mm | Description | 1kV 220pF Y5P ±10% Ceramic Capacitors RoHS |
| Mfr. Part # | GP322 | Model Number | GP322 |
Type G general purpose disc ceramic capacitors are designed for low-cost, small-size applications requiring low to high DC voltage. They are suitable for general purpose, coupling, by-pass, and filtering applications. Key advantages include a small size, conformal coating, radial leads, and long leads.
| Type | Capacitance Range | Voltage Range | Tolerance | Operating Temperature Range | Insulation Resistance | Dissipation Factor | Breakdown Voltage | Lead Length | Size (Inches) D | Size (Inches) T | Size (Inches) S | Size (mm) d |
| GE | 5 pF to 22,000 pF | 50, 100, 500 Vdc | 5%, 10%, 20% | -30 C to +85 C | 10,000 M minimum | 2.5% max. @ 1 kHz; Y5U: 4% @ 1kHz | 2.5 x rated voltage for 5 seconds maximum | 1.0 inch minimum | 0.118 to 0.472 | 0.118 to 0.157 | 0.098 to 0.374 | 2.5 to 9.5 |
| GH | 2,200 pF | 100 Vdc | 20% | -30 C to +85 C | 10,000 M minimum | 4% @ 1kHz (Y5U) | 2.5 x rated voltage for 5 seconds maximum | 1.0 inch minimum | 0.236 | 0.118 | 0.252 | 6.0 |
| GM | 1,000 pF to 22,000 pF | 500 Vdc | 10%, 20%, -20+80% | -30 C to +85 C | 10,000 M minimum | 2.5% max. @ 1 kHz; Y5U: 4% @ 1kHz | 2.5 x rated voltage for 5 seconds maximum | 1.0 inch minimum | 0.157 to 0.642 | 0.157 | 0.250 to 0.374 | 4.0 to 9.5 |
| GP | 470 pF to 22,000 pF | 1000 Vdc | 10%, 20% | -30 C to +85 C | 10,000 M minimum | 2.5% max. @ 1 kHz; Y5U: 4% @ 1kHz | 2.5 x rated voltage for 5 seconds maximum | 1.0 inch minimum | 0.177 to 0.748 | 0.177 | 0.252 to 0.374 | 4.5 to 9.5 |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer
Year Established:
2009
Employee Number:
>>300
Ecer Certification:
Verified Supplier
Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...
Get in touch with us
Leave a Message, we will call you back quickly!