China factories

Chat Now Send Email
China factory - Beijing Silk Road Enterprise Management Services Co., Ltd.

Beijing Silk Road Enterprise Management Services Co., Ltd.

  • China,Beijing ,Beijing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China High voltage capacitor HVC HVC-15KV-DL16-F12.5-681K 680pf 15kv ceramic
China High voltage capacitor HVC HVC-15KV-DL16-F12.5-681K 680pf 15kv ceramic

  1. China High voltage capacitor HVC HVC-15KV-DL16-F12.5-681K 680pf 15kv ceramic

High voltage capacitor HVC HVC-15KV-DL16-F12.5-681K 680pf 15kv ceramic

  1. MOQ:
  2. Price:
  3. Get Latest Price
Voltage Rating 15kV
Capacitance 680pF
Body Thickness 8mm
Tolerance ±10%
Pin Spacing 12.5mm
Description 15kV 680pF ±10% Through Hole,P=12.5mm Ceramic Capacitors RoHS
Mfr. Part # HVC-15KV-DL16-F12.5-681K
Package Through Hole,P=12.5mm
Model Number HVC-15KV-DL16-F12.5-681K

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Voltage Rating 15kV Capacitance 680pF
Body Thickness 8mm Tolerance ±10%
Pin Spacing 12.5mm Description 15kV 680pF ±10% Through Hole,P=12.5mm Ceramic Capacitors RoHS
Mfr. Part # HVC-15KV-DL16-F12.5-681K Package Through Hole,P=12.5mm
Model Number HVC-15KV-DL16-F12.5-681K

High Voltage Ceramic Capacitor

This specification applies to high voltage ceramic capacitors used in high voltage electric equipment. Designed for demanding applications, these capacitors offer reliable performance in various high-voltage scenarios.

Product Attributes

  • Brand: HVC
  • Origin: China (Manufacturing base in Dongguan Humen)
  • Material: N4700 -grade ceramic dielectric material
  • Color: Blue ceramic disc type, Black epoxy resin encapsulation for bolt type
  • Certifications: Not explicitly mentioned.

Technical Specifications

Part NumberTemperature CharacteristicCapacitance (pF)Capacitance ToleranceDC Rated Voltage (kV)Dimensions (mm) D x T x FLead Spacing (mm)Lead StylePacking TypeBrand
HVC-15KV-DL16-F12.5-681KN4700680K (10%)1516 x 4.0 x 12.512.5Straight longBulkHVC

Detailed Specifications

ItemSpecificationTesting Method
5-1 VISUAL EXAMINATION
Appearance dimensionsSee 3, 4.Shall be visually examined or Venire Calipers.
MarkingTo be easily legible.Shall be visually examined.
5-2 ELECTRICAL PERFORMANCE TESTS
Dielectric Strength (Between Lead wires)No failure. (150% of rated voltage for 60 s)The capacitors shall not be damage when DC voltage of 150% of the rated voltage are applied between the lead wires for 60 s in insulate liquid or gas. (Charge/discharge current: 50mA max.)
Body insulationNo failure. (15kV for 10 s)The capacitors is placed in the container with metal balls of diameter 1mm so that each lead wires, Short-circuited, is kept approximately 2mm off the balls as shown in the figure, and DC voltage of 15kV is applied for 10 s between capacitor lead wires and small metals. (Charge/discharge current: 50mA max.)
Insulation Resistance (I.R.)200,000 M min.The insulation resistance shall be measured with DC 1kV within 605 s of charging.
CapacitanceWithin the specified tolerance.The capacitance shall be measured at 20C with 10.2kHz and AC5V(r.m.s.) max.
Dissipation Factor (D.F.)0.2% max.Same condition as capacitance.
Temperature CharacteristicN4700 (-4700ppm/C)Capacitance measurement shall be made at each step specified in table. Capacitance change from the value of step 3 shall not exceed the limit specified.
5-3 MECHANICAL PERFORMANCE TESTS
Strength of Lead PullLead wire shall not cut off. Capacitor shall not be broken.Fix the body of capacitor, apply a tensile weight gradually to each lead wire in the radial direction of capacitor up to 10N, and keep it for 101 s.
BendingEach lead wire shall be subjected to 5N weight and then a 90 to bend, at the point of egress, in one direction, return to original position, and then a 90 bend in the opposite direction at the rate of one bend in 2 to 3 s.-
Solderability of LeadsLead wire shall be soldered with uniformly coated on the axial direction over 3/4 of the circumferential direction.The lead wire shall be dipped into a 25% methanol solution of rosin and then into molten solder of 2355C for 20.5 s. In both cases the depth of dipping is up to about 1.5 to 2.0mm from the root of lead wires.
Soldering EffectAppearance: No marked defect. Capacitance Change: Within10%. Dielectric Strength (Between lead wires): No failure.The lead wires shall be immersed into the melted solder of 35010C up to about 1.5 to 2.0mm from the main body for 3.50.5 s. Post-treatment: Capacitor shall be stored for 242 h at room condition.

Application Scenarios

High voltage electric equipment. Specifically mentioned applications for N4700 material include high-end medical electronic equipment (CT, medical X-ray machines, C-arms, DR machines, dental X-ray machines), airport security, non-destructive testing, and electrostatic dust removal equipment.


2410121632_HVC-HVC-15KV-DL16-F12-5-681K_C36498931.pdf

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer

  • Year Established:

    2009

  • Employee Number:

    >>300

  • Ecer Certification:

    Verified Supplier

Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...

+ Read More

Get in touch with us

  • Reach Us
  • Beijing Silk Road Enterprise Management Services Co., Ltd.
  • 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
  • https://www.icpassive.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement