China factories

Chat Now Send Email
China factory - Beijing Silk Road Enterprise Management Services Co., Ltd.

Beijing Silk Road Enterprise Management Services Co., Ltd.

  • China,Beijing ,Beijing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China high voltage ceramic capacitor HVC HVC-15KV-DL14-F12.5-471K with straight long
China high voltage ceramic capacitor HVC HVC-15KV-DL14-F12.5-471K with straight long

  1. China high voltage ceramic capacitor HVC HVC-15KV-DL14-F12.5-471K with straight long

high voltage ceramic capacitor HVC HVC-15KV-DL14-F12.5-471K with straight long

  1. MOQ:
  2. Price:
  3. Get Latest Price
Voltage Rating 15kV
Capacitance 470pF
Body Thickness 10mm
Tolerance ±10%
Pin Spacing 12.5mm
Description 15kV 470pF ±10% Through Hole,P=12.5mm Ceramic Capacitors RoHS
Mfr. Part # HVC-15KV-DL14-F12.5-471K
Package Through Hole,P=12.5mm
Model Number HVC-15KV-DL14-F12.5-471K

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Voltage Rating 15kV Capacitance 470pF
Body Thickness 10mm Tolerance ±10%
Pin Spacing 12.5mm Description 15kV 470pF ±10% Through Hole,P=12.5mm Ceramic Capacitors RoHS
Mfr. Part # HVC-15KV-DL14-F12.5-471K Package Through Hole,P=12.5mm
Model Number HVC-15KV-DL14-F12.5-471K

High Voltage Ceramic Capacitor

This specification applies to high voltage ceramic capacitors used in high voltage electric equipment. These capacitors are designed for applications requiring high reliability and are suitable for use in various high-voltage electric equipment. They are manufactured by HVC Capacitor Manufacturing Co.,Ltd., a Hong Kong-funded enterprise established in January 2012, leveraging over 20 years of experience from a Taiwanese manufacturer of high-voltage ceramic products.

Product Attributes

  • Brand: HVC
  • Origin: China
  • Material: N4700 -grade ceramic dielectric material
  • Color: Blue ceramic disc type, Black epoxy resin encapsulation for bolt type
  • Certifications: Not explicitly mentioned in the provided text.

Technical Specifications

Part NumberTemperature CharacteristicCapacitance (pF)Capacitance Tolerance (%)DC Rated Voltage (kV)Dimensions (mm) DDimensions (mm) TDimensions (mm) FDimensions (mm) LLead StylePacking TypePack Qty.
HVC-15KV-DL14-F12.5-471KN4700470±10151412.55000.8Straight longBulk

2410121632_HVC-HVC-15KV-DL14-F12-5-471K_C36498930.pdf

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer

  • Year Established:

    2009

  • Employee Number:

    >>300

  • Ecer Certification:

    Verified Supplier

Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...

+ Read More

Get in touch with us

  • Reach Us
  • Beijing Silk Road Enterprise Management Services Co., Ltd.
  • 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
  • https://www.icpassive.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement