| Voltage Rating | 15kV |
| Capacitance | 470pF |
| Body Thickness | 10mm |
| Tolerance | ±10% |
| Pin Spacing | 12.5mm |
| Description | 15kV 470pF ±10% Through Hole,P=12.5mm Ceramic Capacitors RoHS |
| Mfr. Part # | HVC-15KV-DL14-F12.5-471K |
| Package | Through Hole,P=12.5mm |
| Model Number | HVC-15KV-DL14-F12.5-471K |
View Detail Information
Explore similar products
Ceramic capacitor AIDE CAPACITOR 1210X7R476K100NT designed for switch power
ceramic capacitor AIDE CAPACITOR 0603X7R105K100NT for energy saving lamps and
Multi Layer Ceramic Capacitors with CCTC TCC0603X5R105K500CT Specification and
Surface mount multilayer ceramic capacitors Chinocera HHV0805R7102K201NTHJ with
Product Specification
| Voltage Rating | 15kV | Capacitance | 470pF |
| Body Thickness | 10mm | Tolerance | ±10% |
| Pin Spacing | 12.5mm | Description | 15kV 470pF ±10% Through Hole,P=12.5mm Ceramic Capacitors RoHS |
| Mfr. Part # | HVC-15KV-DL14-F12.5-471K | Package | Through Hole,P=12.5mm |
| Model Number | HVC-15KV-DL14-F12.5-471K |
This specification applies to high voltage ceramic capacitors used in high voltage electric equipment. These capacitors are designed for applications requiring high reliability and are suitable for use in various high-voltage electric equipment. They are manufactured by HVC Capacitor Manufacturing Co.,Ltd., a Hong Kong-funded enterprise established in January 2012, leveraging over 20 years of experience from a Taiwanese manufacturer of high-voltage ceramic products.
| Part Number | Temperature Characteristic | Capacitance (pF) | Capacitance Tolerance (%) | DC Rated Voltage (kV) | Dimensions (mm) D | Dimensions (mm) T | Dimensions (mm) F | Dimensions (mm) L | Lead Style | Packing Type | Pack Qty. |
| HVC-15KV-DL14-F12.5-471K | N4700 | 470 | ±10 | 15 | 14 | 12.5 | 500 | 0.8 | Straight long | Bulk |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer
Year Established:
2009
Employee Number:
>>300
Ecer Certification:
Verified Supplier
Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...
Get in touch with us
Leave a Message, we will call you back quickly!