| Packaging Details | PALLET |
| Payment Terms | L/C, D/P, T/T, Western Union |
| Fluxing liquid temperature | 50 – 70℃ |
| Zinc pot internal dimensions | 4.7×1.0×1.8 m |
| Supply Ability | 1000 SETS PER MONTH |
| Gas inlet pressure | 100-200 kPa |
| Delivery Time | 3-5 WORKING DAYS |
| Zinc capacity | 50 tons |
| Certification | CE |
| Place of Origin | CHINA |
| Brand Name | WONDERY |
View Detail Information
Explore similar products
WONDERY Hot Dip Galvanizing Furnace Water Cooling Hot Dip Galvanizing Production
Water Cooling Guardrail Galvanizing Steel Beams Hot Dip Galvanizing Production
525 Deg Hot Dip Galvanizing Furnace 2.5ton/Hr Hot Dip Galvanizing Plant
40mm Wall Hot Dip Galvanizing Furnace XG08 Steel Hot Dip Galvanizing Kettle
Product Specification
| Packaging Details | PALLET | Payment Terms | L/C, D/P, T/T, Western Union |
| Fluxing liquid temperature | 50 – 70℃ | Zinc pot internal dimensions | 4.7×1.0×1.8 m |
| Supply Ability | 1000 SETS PER MONTH | Gas inlet pressure | 100-200 kPa |
| Delivery Time | 3-5 WORKING DAYS | Zinc capacity | 50 tons |
| Certification | CE | Place of Origin | CHINA |
| Brand Name | WONDERY | ||
| High Light | 50-ton zinc hot-dip galvanizing line ,natural gas-heated galvanizing furnace ,batch galvanizing system for steel parts | ||
This straight-line environment-friendly hot-dip galvanizing production line features a zinc kettle with internal dimensions of 4.7m×1.0m×1.8m, 50-ton zinc capacity, and maximum hourly capacity of 2 tons/hour. The line covers the full process of pre-treatment (pickling, rinsing, fluxing), galvanizing, cooling, passivation, and exhaust gas treatment. It uses natural gas micro-positive pressure heating and incorporates a cascade flue gas waste heat utilization system (including five patented technologies: combustion air heating, fluxing liquid heating, workpiece drying, sludge drying, and kettle edge waste heat recovery). It is suitable for high-volume, environmentally compliant hot-dip galvanizing of steel structural parts.
High natural gas consumption and operating costs:Natural gas accounts for the largest portion of galvanizing line operating costs. Root cause: flue gas waste heat directly discharged without cascade recovery.
Acid mist and zinc fume pollution:Pickling and galvanizing generate acid mist and zinc-containing dust – environmental compliance pressure. Root cause: lack of enclosed negative-pressure pickling rooms and efficient bag filter + water curtain deodorization systems.
Difficult fluxing liquid iron content control:Iron ion accumulation in fluxing liquid affects coating quality and increases zinc consumption. Root cause: lack of online iron removal and automatic pH balance systems.
Galvanizing process relies on manual operation:Immersion time and temperature controlled manually – inconsistent coating thickness and higher costs. Root cause: lack of PLC automatic program control for galvanizing timing management.
3.1 High-Efficiency Natural Gas Heating System:High-speed pulse burners (TJ100×4 sets) – instantaneous gas consumption 112m³/h – dual main intake control (one active, one standby). Three-stage PLC temperature control – zinc bath temperature 438-450℃ automatically controlled – gas consumption approximately 12.5m³ per ton of parts at full load.
3.2 Cascade Flue Gas Waste Heat Utilization System (5 Patents):500℃ flue gas → stainless steel heat exchanger heats water to 90℃ → titanium alloy heat exchanger heats fluxing liquid to 50-70℃. 300℃ flue gas → drying tank heats workpieces. 200℃ flue gas → combustion air heat exchanger heats air to 50-150℃ – saves 3m³ gas per ton of parts. Kettle edge waste heat (~200℃) → stainless steel double-layer coil heats water for acid heating / space heating. Final flue gas → workshop heating. Comprehensive annual savings of ~180,000m³ natural gas (based on 60,000-ton capacity) and ~RMB 114,000 in sludge treatment costs.
3.3 Enclosed Acid Mist Treatment System:Pickling tanks with enclosed acid mist treatment rooms – ground rail carts for material loading/unloading – negative pressure maintained inside – no acid mist escape. Acid mist passes through pre-treatment + absorption neutralization tower (automatic dosing, 22kW variable frequency fan, inlet/outlet pH probes) for compliant discharge. Rinse water reused for new acid preparation – reduces alkali usage.
3.4 Zinc Fume Collection & Purification System:Double-sided suction capture of zinc fume at kettle edges – smoke suction + bag filter + induced draft fan + water curtain deodorization (chimney, ducts, etc.) – 37kW variable frequency – starts 2-3 minutes before kettle immersion – saves 300% power.
3.5 Automatic Iron Removal & pH Balance System:Fluxing liquid equipped with automatic iron removal equipment – ensures iron content ≤1mg/L, pH controlled around 5 – effectively reduces zinc consumption and improves coating quality.
3.6 Automated Galvanizing Control System:PLC automatic program design – crane automatically enters set zinc immersion time after lifting parts – zinc temperature automatically controlled – prevents manual over-immersion adding unnecessary zinc layers and costs.
| Parameter | Specification |
|---|---|
| Zinc kettle internal size (L×W×H) | 4.7×1.0×1.8 m |
| Zinc capacity | 50 tons |
| Maximum hourly capacity | 2 tons/hour |
| Heating energy | Natural gas, calorific value 8400-8600×4.18kJ/m³ |
| Gas inlet pressure | 100-200 kPa |
| Burner configuration | High-speed pulse TJ100×4 sets, 112m³/h instantaneous |
| Full load gas consumption | ~12.5m³/ton of parts |
| Zinc bath temperature | 438 – 450℃ (auto-controlled) |
| Fluxing liquid temperature | 50 – 70℃ |
| Power supply | 220V/60Hz, 3-phase |
| Total electrical consumption | ~205kW |
| Pickling room | Enclosed negative pressure, ground rail cart loading |
| Acid mist treatment | Pre-treatment + neutralization tower, auto-dosing, 22kW VFD |
| Zinc fume treatment | Double-sided capture + bag filter + water curtain deodorization, 37kW VFD |
| Fluxing iron removal | Auto iron removal, iron ≤1mg/L, pH≈5 |
| Control method | PLC automatic program + manual |
| Total equipment weight | ~159,683 kg |
| Shipping configuration | 6×40HQ + 1×20GP containers |
5.1 Recommended Scenarios
High-volume hot-dip galvanizing of steel structural parts
New construction or upgrade of galvanizing lines requiring environmental compliance
Energy-saving galvanizing plants seeking natural gas consumption reduction and waste heat utilization
5.2 Key Selection Considerations
Kettle size and capacity: Verify 4.7×1.0×1.8m kettle and 2 tons/hour capacity meet production needs
Fuel conditions: User to supply natural gas with calorific value ≥8400×4.18kJ/m³, pressure 100-200kPa
Power supply: User to supply 220V/60Hz 3-phase power, total capacity ~205kW
Facility conditions: User responsible for building, foundations, water/electricity/gas lines to equipment interface
Lifting equipment: User to supply hoists and cranes (3-ton + 3-ton units)
Environmental requirements: Acid mist and zinc fume treatment systems meet local emission standards
Q1: How much natural gas can the waste heat utilization system save?
A: Combustion air heating system heats air to 50-150℃ – saves approximately 3m³ gas per ton of parts. At 60,000-ton annual capacity, annual gas savings ~180,000m³. Combined with fluxing heating, workpiece drying, kettle edge heat recovery, and workshop heating – significant comprehensive energy savings.
Q2: How is acid mist emission compliance ensured?
A: Enclosed negative-pressure pickling room with ground rail cart operation – prevents acid mist escape. Acid mist passes through pre-treatment then absorption neutralization tower with automatic dosing – inlet/outlet pH probes – 22kW variable frequency fan adjusts extraction volume – ensures compliant discharge.
Q3: How does the zinc fume treatment system work?
A: Double-sided suction captures zinc fume at kettle edges – smoke passes through bag filter for dust removal – then water curtain deodorization tower – finally discharged via chimney through induced draft fan. 37kW variable frequency fan starts 2-3 minutes before kettle immersion – significant power savings.
Q4: How is fluxing liquid iron content controlled?
A: Automatic iron removal equipment continuously circulates and removes iron – ensures iron content ≤1mg/L – pH automatically regulated to ~5. Low iron content effectively reduces zinc consumption, minimizes zinc dross generation, and improves coating surface quality.
Q5: Can the line achieve automatic operation?
A: PLC automatic program control – crane automatically enters set zinc immersion time after lifting parts – zinc temperature auto-controlled – prevents manual over-immersion and zinc layer thickening. Pickling room crane with wireless remote control – convenient and safe.
Company Details
Business Type:
Manufacturer
Year Established:
2013
Ecer Certification:
Verified Supplier
Wuxi Wondery Industry Equipment Co., Ltd, established in year 2013, is a professional supplier engaged in the sale and after sale service of Melting Furnaces, Heat Treatment Furnaces, Hot Dip Galvanizing Furnaces. Our factory is dedicated to strict quality control and thoughtful cust... Wuxi Wondery Industry Equipment Co., Ltd, established in year 2013, is a professional supplier engaged in the sale and after sale service of Melting Furnaces, Heat Treatment Furnaces, Hot Dip Galvanizing Furnaces. Our factory is dedicated to strict quality control and thoughtful cust...
Get in touch with us
Leave a Message, we will call you back quickly!