| Delivery Time | 30-90work days |
| Type | Hot Rolling Mill |
| Warranty of core components | 1 Year |
| Core Components | PLC, Bearing, Gear |
| Key Selling Points | Competitive Price |
| Place of Origin | Shaanxi, China |
| Brand Name | AE |
| Certification | CE;ISO9001;ISO14001;OHSAS 18001 |
View Detail Information
Explore similar products
5T-35T Hot Rolling Mill Steel Bar Rebar Production Line High Performance
1-5t/H Hot Steel Rolling Mill Mini Deformed Steel Bar Manufacturing Plant
High Efficiency Steel Hot Rolling Mill Iron Rod Making Machine For 8--32mm Rebar
Small Hot Rolling Mill Rebar Rolling Mill Production Line 0.5-5T/H Automatic
Product Specification
| Delivery Time | 30-90work days | Type | Hot Rolling Mill |
| Warranty of core components | 1 Year | Core Components | PLC, Bearing, Gear |
| Key Selling Points | Competitive Price | Place of Origin | Shaanxi, China |
| Brand Name | AE | Certification | CE;ISO9001;ISO14001;OHSAS 18001 |
| High Light | Automatic Hot Rolling Mill ,10mm Hot Rolling Mill ,10mm Steel Rebar Production Line | ||
Hot Rolling Mill
Hot Rolling Mill 50000KG 10mm Continuous Automatic Steel Rebar Production Line Flat Bar Hot Rolling Mill Machine for Rebar Steel Making
1. 1-5t/hour steel bar production line, final bar size range is 8-32 mm,most use for build for small rolling mill.we have half-automatic/fully automatic steel bar production line machinery.we can also design machinery under customer's invest.so the more of your suggestion will be best for us.
![]()
After sales:
1.Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2.Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.
Company Details
Ecer Certification:
Verified Supplier
Xi'an Abundance Metallurgical Equipment Co., Ltd. is located in Xi'an High-tech Development Zone. After 20 years of development, it has become a leading manufacturer in China's electric furnace industry, integrating design, manufacturing, installation, commissioning and technical service... Xi'an Abundance Metallurgical Equipment Co., Ltd. is located in Xi'an High-tech Development Zone. After 20 years of development, it has become a leading manufacturer in China's electric furnace industry, integrating design, manufacturing, installation, commissioning and technical service...
Get in touch with us
Leave a Message, we will call you back quickly!