China factories

China factory - Henan Yuanda Boiler Co., Ltd.

Henan Yuanda Boiler Co., Ltd.

  • China,Zhengzhou ,Henan
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Q345R Material Biomass Hot Water Boiler Cocoshell Fired ISO9001 Certification
China Q345R Material Biomass Hot Water Boiler Cocoshell Fired ISO9001 Certification

  1. China Q345R Material Biomass Hot Water Boiler Cocoshell Fired ISO9001 Certification

Q345R Material Biomass Hot Water Boiler Cocoshell Fired ISO9001 Certification

  1. MOQ: 1 set
  2. Price: Depends on boiler model
  3. Get Latest Price
Payment Terms D/P, D/A, T/T, L/C
Supply Ability 800 sets per year
Delivery Time about 20-30 working days after payment
Packaging Details Plywood case professional packaging transportation
Product name Latest Design Cocoshell Fired Coal Hot Water Boiler Biomass Boiler
Structure Single drum large stove
Material Q345R
Fuel coal,coconut shell
Steam temperature 194°C,204°C,226°C
Working pressure Low pressure
Quality High strict quality detection
Company Boiler factory established in 1956
Brand Name Yuanda Boiler
Model Number DZL hot water boiler
Certification ASME,CE,ISO9001
Place of Origin Henan China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms D/P, D/A, T/T, L/C Supply Ability 800 sets per year
Delivery Time about 20-30 working days after payment Packaging Details Plywood case professional packaging transportation
Product name Latest Design Cocoshell Fired Coal Hot Water Boiler Biomass Boiler Structure Single drum large stove
Material Q345R Fuel coal,coconut shell
Steam temperature 194°C,204°C,226°C Working pressure Low pressure
Quality High strict quality detection Company Boiler factory established in 1956
Brand Name Yuanda Boiler Model Number DZL hot water boiler
Certification ASME,CE,ISO9001 Place of Origin Henan China
High Light hot water boiler systemindustrial hot water boiler

Latest Design Cocoshell Fired Coal Hot Water Boiler Biomass Boiler

 

1. High Security:
Feed water system adopt computer controlling, automatic feed water. Equip with water lack protection and over pressure protection devices, security and reliable.

 

2. Long Life and Durable:
Excellent professional design, advanced production processes, strict quality inspection control, is the quality assurance of each boiler, the service life of normal use boiler all above 20 years.

 

3. Environmental Protection and Low Noise:
The boiler smoke is low emission, and equip with high efficiency dust remove device at boiler end, low noise fans, to make the smoke emission reach to nation environmental protection requirements.

 

4. Normative Production:
Each part of boiler are all produce according with national and international standard (ISO), each procedure of production are all strictly follow advanced production technology, to ensure the quality of our products.

 

5. High Quality Services:
Technology consulting, technology services, installation guidance, regular and irregular re-tracking services for users, offer high quality and perfect services at any time, ensure our customer secure purchase, and happy utilization.

 

 

Accessories Functions

 

Electrical cabinet Be responsible for electrical control of auxiliary machines, ensure the whole system work automatically and make operation convenient.
Feed water pump & water circulating pump Put water into boiler and promote hot water circulation.Compact structure,low power consumption,low failure rate
Automatic water softener Remove Mg+,Ca+ in the water and improve water quality. Prevent hurt to boiler tube,entend the boiler using life time.
Economizer Heat inlet water and reduce exhausted gas temperature, which increase boiler efficiency and is good for environment
Steam header Distribute steam to different directions.Used for distributing the steam to each pipe of user's workshop
Forced draught fan Blow clean air into the boiler and promote exhauted gas out, ensure the air circulation of the whole system.
Dust collector Remove the dust and ash in exhausted gas to protect envrionment and reduce polutions.
Gas flue and Chimney Provide channels for exhausted gas flow.
Fuel feeding Automatic feeding device
Grate speed adjustor Regulate the suitable speed of chian grate according to the combustion situation.
Slag remover Extract slags mechanically and save labour cost.
Induced draught fan Blow clean air into the boiler and promote exhauted gas out, ensure the air circulation of the whole system.
Safety Valves It will work automatically when the working pressure is over high to protect the whole system
Pressure Gauge Show the working pressure of the boiler
Check Valves Connect pipes to ensure water not to flow backwards
Blow-down Valves To let out the sediment, impurities or other things in the bottom
Shut-off Valves Turn on or off the pipes

 

 

FAQ


1. How to avoid collapse of bricks, and what should be done if it happened?
When boiler installation finished, drying the boiler according to the manual, it's very important to avoid collapse of bricks.


2. How many stokers do I need for one boiler?
Usually 3 person, every 8 hours a shift.


3. Rules for ash removal.
Clean the ash and leaked coal in ash hopper in definite time. Every shift should open the soot door at the bottom of boiler left for twice, to clean the ash deposition in the wind chamber, make sure there is no blocking.


4. How long it takes for boiler installation and debugging?
The boiler is easy to install, it could be finished within 2 weeks, we have the professional abroad installation team to help for installation. Moreover, our technicians offer after-sale service every quarter in many countries, like Philipines, Bangladesh, Indonesia, Pakistan.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company,Seller

  • Year Established:

    1956

  • Total Annual:

    5000,000-10,000,000

  • Employee Number:

    201~300

  • Ecer Certification:

    Active Member

Henan Yuanda Boiler Co., Ltd., established in 1956, locates in Xihua county, Henan province, the central part of China. We are professional manufacturer and supplier for industrial boilers, with over 60 years' experience in boiler design, technique, production, installation and operation. Our co... Henan Yuanda Boiler Co., Ltd., established in 1956, locates in Xihua county, Henan province, the central part of China. We are professional manufacturer and supplier for industrial boilers, with over 60 years' experience in boiler design, technique, production, installation and operation. Our co...

+ Read More

Get in touch with us

  • Reach Us
  • Henan Yuanda Boiler Co., Ltd.
  • Qihang Building D-709,Hanghai Road,Zhengzhou City,Henan Province,China
  • https://www.industrialsteam-boiler.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement