| Supply Ability | 10,000 PCS per month |
| Delivery Time | 20-25 working days after PO |
| Packaging Details | parts in carton, and cartons in pallet |
| material | 1045 carbon steel or according to drawing |
| silicon or sand casting | silicon casting |
| machining | according to drawing and customer requirements |
| surface treatment | according to drawing and customer requirements |
| lead time | 20-25 working days after PO |
| package | carton and pallet, prevent broken |
| Brand Name | slider part carbon steel investment casting part |
| Model Number | Ottommo-C-1045--31 |
| Certification | ISO9001, TS16949 |
| Place of Origin | China |
View Detail Information
Explore similar products
High precision investment casting parts 25# S25C carbon steel connector
Custom made twin connector lost wax investment castings with 8620 carbon steel
42Cr carbon steel lost wax investment casting process part of tongs
Long plug part carbon steel investment casting parts lost wax metal casting
Product Specification
| Supply Ability | 10,000 PCS per month | Delivery Time | 20-25 working days after PO |
| Packaging Details | parts in carton, and cartons in pallet | material | 1045 carbon steel or according to drawing |
| silicon or sand casting | silicon casting | machining | according to drawing and customer requirements |
| surface treatment | according to drawing and customer requirements | lead time | 20-25 working days after PO |
| package | carton and pallet, prevent broken | Brand Name | slider part carbon steel investment casting part |
| Model Number | Ottommo-C-1045--31 | Certification | ISO9001, TS16949 |
| Place of Origin | China | ||
| High Light | investment cast parts ,carbon steel investment casting | ||
slider part carbon steel investment casting part
Slider part 1045 carbon steel lost wax casting investment with cut and grind gate
Description
Investment casting is a way of casting, which is cmposed of wax mould, shell mold, pouring, after treatment and package, whose lead time will be 20-25 working days after PO.
| Item | Description |
| Product Name | carbon steel investment casting part |
| Working Process | Tooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging |
| Material | 1045 carbon steel |
| Surface Treatment | According to the requirement of customer |
| Application(Products cope) | slider part in the machine |
| Quality Control | ISO9001, TS16949 |
| Thickness | Only to raw casting, more than 4mm |
| File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
| Service | 24-hour reply to customer's enquiry |
| Inspection | IQC, IPQC,FQC,QA |
| Mould | Depend on customer's require to make the mould. |
| Sample confirmation | Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied. |
| Packing | Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements |
Payment & Shipping Terms:
| Minimum Order Quantity: | 700 |
| Price: | Quoted per see the drawing or sample |
| Delivery Time: | 20-25 working days after received PO |
| Payment Terms: | T/T, L/C |
| Supply Ability: | 10,000pcs per month |
FAQ:
Q: Who Are We?
1.We are a factory do the casting for more than 10 years.
2.Aroud more than 200 workers and 3000 square meter workshop
3.Customizing services, OEM services and good after services, etc.
Q: Where is your factory located? How can I visit there?
A: Our factory is located in ningbo city, zhejiang Province, China, near Shang hai. You can fly to Shanghai Pudong airport directly.
How to test the part?
1. When we do the wax mould, we will choose 5-10 parts to test the wax shrinkage, and also test the life of toolings.
2. Before pouring, we will test the material and do the material report.
3. After Pouring, we will choose 10-20 parts per furnace to do the measurement.
4. When doing the after treatment, we will measure some of the parts per day.
5. After after-treatment, we will use testing toolings to test every parts.
6. Before shippment, we will test 5 parts or the quantity customer want to do the report, and will send the material report and meausrement report together with productions to customer.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2002
Total Annual:
10,000,000-12,000,000
Employee Number:
170~190
Ecer Certification:
Active Member
Official Website: http://ottommo.com/ Our company was founded in 2002, and firstly we did the water glass investment casting, in 2009, started silica sol process investment casting, in 2015, we added vacuum casting line. We have around 190 workers and 17 engineers, to try our best ... Official Website: http://ottommo.com/ Our company was founded in 2002, and firstly we did the water glass investment casting, in 2009, started silica sol process investment casting, in 2015, we added vacuum casting line. We have around 190 workers and 17 engineers, to try our best ...
Get in touch with us
Leave a Message, we will call you back quickly!