China factories

Chat Now Send Email
China factory - Shenzhen Jianhong Jitai Technology Co., Ltd.

Shenzhen Jianhong Jitai Technology Co., Ltd.

  • China,Shenzhen ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Resistive Load Bank Equipped With Three Phase 380V AC Power Supply And 220V AC
China Resistive Load Bank Equipped With Three Phase 380V AC Power Supply And 220V AC

  1. China Resistive Load Bank Equipped With Three Phase 380V AC Power Supply And 220V AC
  2. China Resistive Load Bank Equipped With Three Phase 380V AC Power Supply And 220V AC
  3. China Resistive Load Bank Equipped With Three Phase 380V AC Power Supply And 220V AC

Resistive Load Bank Equipped With Three Phase 380V AC Power Supply And 220V AC

  1. MOQ: 1
  2. Price:
  3. Get Latest Price
Packaging Details Wooden box
Control Source 240v 50Hz
Dimensions 860*570*770mm L×W×H
Shipment 15-35 days
Delivery Time 20-25 working days
Payment Terms T/T
Loading Port shenzhen port,China
Certification CE
Brand Name Jianhong
Model Number JH-RL-10KWA380-P-TB
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Packaging Details Wooden box Control Source 240v 50Hz
Dimensions 860*570*770mm L×W×H Shipment 15-35 days
Delivery Time 20-25 working days Payment Terms T/T
Loading Port shenzhen port,China Certification CE
Brand Name Jianhong Model Number JH-RL-10KWA380-P-TB
Place of Origin China

Product Features


1. Flexible load configuration

For three-phase independent resistive loads and inductive loads, the system supports hierarchical switching; the single-phase combined resistive power is 3.3 kW and the inductive power is 3.3 kVar; the overall rated resistive power is 10 kW and the rated inductive power is 10 kVar; the voltage settings are modularly combinable, enabling precise adjustment of both active and reactive power, with a freely adjustable power factor.

Resistance accuracy: ±3%; inductance accuracy: ±5%–10%; load-dependent data remains stable; test data reliability is high.


2. Diversified control modes

Local Control: Touchscreen-based visual operation, providing real-time, intuitive display of all electrical parameters—including voltage, current, active power, reactive power, apparent power, and power factor.

Remote Control: Supports Modbus TCP communication for interfacing with a host computer, enabling integrated remote measurement and control for automated production lines and laboratories.


3. Power Supply and Wiring Specifications

The main circuit is powered by a 380V AC three-phase four-wire system, with an auxiliary control power supply of 220V AC; it features copper busbar load terminals and a TB2504 dedicated auxiliary wiring strip, ensuring secure connections and compatibility with standard industrial wiring practices.


4. Comprehensive Safety Protection System

Equipped with a four-tier protection system comprising overheat alarm, overcurrent protection, overvoltage protection, and emergency stop function; the input voltage can withstand short-term exposure to a withstand voltage of 1.1 times the rated AC 380V; features a timed loading function, enabling automated testing without manual supervision.


application scenarios


Power Supply Factory Acceptance Aging Test  Three-phase UPS, power frequency inverter, photovoltaic grid-connected inverter, energy storage converter (PCS), voltage-stabilized power supply with load aging test, and full-load reliability verification Simulates actual on-site conditions with a hybrid active and reactive power load scenario


Generator set performance testing  Perform full-load and half-load step-by-step tests on diesel generator sets and small hydroelectric units to verify their output voltage stability, voltage regulation characteristics, load-induced temperature rise, and power factor adaptability.


Inspection of distribution cabinets and switchgear assemblies   Temperature rise tests for high-and low-voltage switchgear assemblies, busway systems, terminal blocks, and circuit breakers; these tests evaluate the heat generation of components under prolonged load conditions, the reliability of wiring connections, and the protection trip logic.


Electrical Engineering Teaching Laboratory Practical Training  University-level Electrical Engineering Department: Reactive Power Compensation Experiment Platform, Power Factor Regulation Practical Training Platform, Three-Phase Unbalanced Load Simulation Platform, and Relay Protection Commissioning Teaching and Training Platform


FAQs


1. Q: Can the equipment be connected in a single-phase configuration or subjected to three-phase asymmetric loading?

A: No, this is not supported; the equipment is configured for three-phase synchronous balanced switching loading, which prohibits prolonged full-load operation on a single phase or three-phase unbalanced operation, thereby preventing uneven stress distribution on internal components and avoiding localized overheating damage.


2 Q: Can the equipment be connected in a single-phase configuration or subjected to three-phase asymmetric loading?

 A: No, this is not supported; the equipment is configured for three-phase synchronous balanced switching loading, which prohibits prolonged full-load operation on a single phase or three-phase unbalanced operation, thereby preventing uneven stress distribution on internal components and avoiding localized overheating damage.


3. Q: How should you troubleshoot if remote communication fails to connect to the host computer?

① Confirm that the load cabinet and the host computer are on the same local area network (LAN) with matching IP address subnets; 

② Verify that the communication protocol is Modbus TCP, and that the port and register address parameters are correctly configured;

③ Check the wiring at the network port located at the rear of the cabinet and the switch link; then, restart the cabinet's control unit and attempt the connection again using the host computer software.


4. Q: What are the possible causes for the system to automatically unload when a thermal overload alarm is triggered during operation?

① The air intake or exhaust filter screens have accumulated dust and become clogged, resulting in poor airflow through the ventilation ducts

② The ambient temperature at the site has remained above 50°C for an extended period, leading to insufficient heat dissipation margin;

③ The system has been operating continuously at full load for a prolonged period, causing the fan to fail to rotate; this issue can be resolved by cleaning the dust filter, inspecting the heat dissipation fan, and improving the local ventilation conditions.



Product Parameters
Model JH-RL-10KWA380-P-TB
Brand jianhong
size ≤800*800*2260MM(L*W*H)
(Including the eyebrow part, 60MM)
weight ≤300KG
Voltage AC380V three-phase four-wire system
Rated power R load: 10KW L load: 10KVar
Auxiliary power supply AC220V 50/60HZ
Power factor adjustable
Resistance tolerance ±3%(Sheet resistor)
Inductance tolerance ±5-10%(Sheet resistor)
Cold path Force forced cooling mode, forward then backward
Working environment Operating ambient temperature: -10~50℃, dry and well-ventilated
Local control mode touch screen
Remote control mode Modbus TCP + Host Computer
Protection Grade IP20 (Indoors)
Display mode Digital display of voltage, current, active power, apparent power, reactive power and power factor
Power gear R load: A look100W+200W+200W+300W+500W+1KW+1KW=3.3KW
      B look100W+200W+200W+300W+500W+1KW+1KW=3.3KW
      C look100W+200W+200W+300W+500W+1KW+1KW=3.3KW
L load: A look100Var+200Var+200Var+300Var+500Var+1KVa+1KVar=3.3KVar
      B look100Var+200Var+200Var+300Var+500Var+1KVa+1KVar=3.3KVar
      C look100Var+200Var+200Var+300Var+500Var+1KVa+1KVar=3.3KVar
Load Description

1.Load all three phases simultaneously; unbalanced loading is prohibited.

2.In automatic mode, you may choose whether to set the loading duration.
3.Voltage is collected in real time and no configuration is required.
4.The maximum voltage shall be 1.1 times the rated voltage.
Load protection Overheating alarm, overcurrent protection, overvoltage protection, emergency stop
Working method Capable of continuous online operation, 7×24-hour working system with a one-year warranty
Output mode 1 set of load outgoing lines (copper bars)
1 set of auxiliary power supply (TB2504 terminal block)
Mobile Mode Casters (Fuma Casters)
Cabinet color 7035


Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2013

  • Total Annual:

    3000000-5000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

               Jianhong Jitai was established in 2013 and is located in Shenzhen City, Guangdong Province, China. It enjoys a superior geographical location and convenient transportation. We have very rich industry experience and are a trustworthy supplier....                Jianhong Jitai was established in 2013 and is located in Shenzhen City, Guangdong Province, China. It enjoys a superior geographical location and convenient transportation. We have very rich industry experience and are a trustworthy supplier....

+ Read More

Get in touch with us

  • Reach Us
  • Shenzhen Jianhong Jitai Technology Co., Ltd.
  • 6th Floor, Building C, Pengyifa Science and Technology Park, Baihua Community, Guangming New District, Shenzhen, Guangdong Province,China
  • https://www.jhjtpower.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement