Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
KAWA DRIVE SHAFT 43420-12760/43410-12820 For 2006-2012 TOYOTA BLADE AZE156 2AZFE 2.4L AT MT LH/RH
KAWA DRIVE SHAFT 43420-12760/43410-12820 For 2006-2012 TOYOTA BLADE AZE156 2AZFE 2.4L AT MT LH/RH
Product Features
Precision Machining: High-precision CNC processing ensures accurate dimensions. Perfect matching for easy installation.
Deformation Resistance: Strong overall structure resists bending and deforming. Stays stable under complex road conditions.
Low Failure Rate: Rigorous quality control lowers product failure rate. Reliable for long-term daily use.
OE Compatibility
OE Number
Car Model
43420-12760 43410-12820
2006-2012 TOYOTA BLADE AZE156 2AZFE 2.4L AT MT LH/RH
About KAWA
We have been specializing in the production of automotive components and accessories since 2003. We created our brand "KAWA CV Joints", aiming to build it to one of the most famous car parts manufacturers. We have our own factory and all our products are produced under strict regulation. We promise to provide our customers with high quality and excellent products at all times.
Product Specifications
Size
OEM Standard Size
Condition
100% Brand New
Product Fit
Direct Fit
Quality
OEM or as your need
OEM/ODM
43420-12760/43410-12820
Certificate
ISO9001
Warranty
50000kms
MOQ
2pcs
Packing
Factory Package or Neutral Your Packing Can Be Customized
Delivery Time
3~7 days for stock item, 15~35 days for mass production