| Fuel Type | Natural gas / LPG |
| Supply Ability | 45 days |
| Payment Terms | T/T,L/C,Western Union |
| Delivery Time | 45 days after deposit |
| Packaging Details | Standard export packing with steel frame reinforcement, waterproof membrane and fumigation-free plywood case, roller and drive parts in separate cushioned crates |
| Firing Temperature | 1210 C |
| Control System | PLC + recipe library |
| Preheating Ramp | Programmed auto ramp |
| Module Length | 4.2 m per section |
| Kiln Length | 130 m |
| Warranty | 24 months |
| Recipe Changeover | under 4 hours |
| Place of Origin | Guangdong, China |
| Brand Name | ECER |
| Model Number | RK-130LD |
| Certification | ISO 9001:2015, CE |
View Detail Information
Explore similar products
Brick And Tile Kiln Dependable Construction Heat Treatment Furnace
Electric Porcelain Roller Kiln Low Maintenance High Yield Environmentally
Metal Roller Kiln Low Fuel Consumption Mechanization Automation Ceramic Fast
Automated Continuous Roller Kiln User Friendly For Ceramic Industry
Product Specification
| Fuel Type | Natural gas / LPG | Supply Ability | 45 days |
| Payment Terms | T/T,L/C,Western Union | Delivery Time | 45 days after deposit |
| Packaging Details | Standard export packing with steel frame reinforcement, waterproof membrane and fumigation-free plywood case, roller and drive parts in separate cushioned crates | Firing Temperature | 1210 C |
| Control System | PLC + recipe library | Preheating Ramp | Programmed auto ramp |
| Module Length | 4.2 m per section | Kiln Length | 130 m |
| Warranty | 24 months | Recipe Changeover | under 4 hours |
| Place of Origin | Guangdong, China | Brand Name | ECER |
| Model Number | RK-130LD | Certification | ISO 9001:2015, CE |
| High Light | Roller kiln 45-day delivery ,Roller kiln fast recipe changeover ,Roller kiln firing line | ||
Long build schedules cost orders. This roller kiln uses a modular 4.2m section design that is pre assembled and tested before shipment, shortening production lead time to 45 days from deposit and cutting site erection work. A stored recipe library with automatic ramp control allows fast recipe changeover in under four hours, so one line can serve several tile formats and colours without long changeover downtime.
| Delivery | 45 days |
| Module | 4.2 m section |
| Changeover | under 4 h |
| Kiln Length | 130 m |
| Max Temperature | 1210 C |
| Control | PLC recipe library |
Supply includes kiln layout engineering, roller installation supervision, firing curve commissioning, " "operator training and a two year spare roller package. Remote diagnostics and on site service are " "available for the full kiln life.
Send your tile size, thickness, target output and fuel plan, and our engineers will return a matched " "roller kiln layout, firing curve and quotation.
Company Details
Business Type:
Manufacturer,Trading Company,Seller
Year Established:
2019
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Henan Ruiyao Intelligent Environmental Protection Co., Ltd. is a branch of Suixian Yaxin Intelligent Technology and Environmental Protection Co., Ltd. and has a friendly cooperative relationship with Henan Yaxin Kiln Co., Ltd. The qualifications and honors of the two companies can be shared by Henan... Henan Ruiyao Intelligent Environmental Protection Co., Ltd. is a branch of Suixian Yaxin Intelligent Technology and Environmental Protection Co., Ltd. and has a friendly cooperative relationship with Henan Yaxin Kiln Co., Ltd. The qualifications and honors of the two companies can be shared by Henan...
Get in touch with us
Leave a Message, we will call you back quickly!