China factories

China factory - Guangxi Ligong Machinery Co.,Ltd

Guangxi Ligong Machinery Co.,Ltd

  • China,Liuzhou ,Guangxi
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China The Pull Rod Of The Hopper Structural Parts 06 Mini Wheel Loader LAIGONG SYZG
China The Pull Rod Of The Hopper Structural Parts 06 Mini Wheel Loader LAIGONG SYZG

  1. China The Pull Rod Of The Hopper Structural Parts 06 Mini Wheel Loader LAIGONG SYZG

The Pull Rod Of The Hopper Structural Parts 06 Mini Wheel Loader LAIGONG SYZG

  1. MOQ: 1PC
  2. Price: Negotiable price
  3. Get Latest Price
Payment Terms Western Union, T/T
Supply Ability 6000 pcs /month
Delivery Time 1-3days
Packaging Details Carton/Wooden/Boxes
Material steel
Applicable Models 06
Installation Location structural parts
color yellow
name The pull rod of the hopper unload 2.5 M
port Guangzhou / Shenzhen
Brand Name LGMC
Model Number 06 Mini Wheel Loader
Certification ORIGINAL
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms Western Union, T/T Supply Ability 6000 pcs /month
Delivery Time 1-3days Packaging Details Carton/Wooden/Boxes
Material steel Applicable Models 06
Installation Location structural parts color yellow
name The pull rod of the hopper unload 2.5 M port Guangzhou / Shenzhen
Brand Name LGMC Model Number 06 Mini Wheel Loader
Certification ORIGINAL Place of Origin China

The Pull Rod Of The Hopper Structural Parts 06 Mini Wheel Loader LAIGONG SYZG MINGYU LUYU LUGONG Small Wheel Loader
 
 
Product Description:

· Place of Origin: China

· Brand Name: LGMC

· Model Number:structural parts

· Name:The pull rod of the hopper unload 2.5 M

· Application: 06 mini wheel loader

· Warranty: 3 Months

· Type: structural parts Parts

· Delivery: 3-5 Working Days

· Stock quantity: available

 

Packaging & Delivery :

 
    Packaging Details: Carton/Wooden/Boxes
    Port: Guangzhou / Shenzhen
    Lead Time: Shipped in 1 day after payment
 
 

06130 AxleHalf axle 640 (long)
Half axle 590 (short)
main reducer assembly
47*84*12.5 oil seals
49*100*10 oil seals
100*120*10 oil seals
wheel hub with 8 hole Φ12 bolt
Brake assembly
brake drum
Brake part Cylinder
brake systemBrake Master Cylinder

hydraulic system
distributor(whole)
Steering gear
35 gear pump (spline left-handed)
priority valve
take back the bucket cylinder,Piston,sliding sleeve
lifting cylinder,Piston,sliding sleeve
Steering cylinder,Piston,sliding sleeve
transmission system(mechanical) transmission shaft 480 (MM long)
(mechanical) transmission shaft 210 (MM short)
(automatic) transmission shaft 640 (MM long)
(automatic) transmission shaft 230 (MM short)

structural parts
 
The pull rod of the hopper(unload 2.5 M)
S rocker
Tire750-16
gearbox35*58*10 oil seals
40*65*10 oil seals
17*28*6 oil seals
automatic gearbox47*84*20 oil seals
40*62*10 oil seals
pin shaft35*65(bucket)
38*80(S rocker)
40*140(S rocker)
40*80 (hinge joint)
35*65( Threaded trestle )
Pin shaft sleeve35*45*35(bucket)
40*48*40(S rocker)
40*48*40 (hinge joint)
35*45*35 (trestle )

 

 
 

 
 
Our advantages :
1. We can help buyers design specific products or produce products according to buyers' design.
2. Small order acceptable.
3. Competitive price be offered.
4. Inquiry or question be answered within 12 hours.
5. Best possible after-sales service.
6.We can print logo according to buyers' requirement.
7.Stock an extensive range of spare parts.
8.Favourable geographical location.
9.Flexible pricing, offers discount and deferred payment for wholesale buyers.
10.Timely delivery.
 
FAQ:
Q1. Could you custom products?
A: We can manufacture it according to your drawings or samples.
Q2. What's your payment terms.
A: By T/T or Western Union, 100% in advance. ( large orders can be negociated)
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: 1-3 working days in general, and 7-10 days for large orders.
Q5.How can you guarantee the quality?
A:One year's warranty against B/L date.If You meet with quality problem, we promise to responsible for it.
Q6:Can we buy 1 pc of each item for quality testing?
A:Yes, we understand quality test is important and we are glad to send 1pc for quality testing.
 
Tags: mini wheel loader spare parts ,filter, loader spare parts,Half axle,wheel loader ,front end loader,small wheel loader,small loader
If you want to know more products, we have: clg856 , wg180 , rear axle apply to liugong clg856
 












































Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Exporter,Trading Company,Seller,Other

  • Year Established:

    2017

  • Total Annual:

    2000000-3000000

  • Employee Number:

    20~100

  • Ecer Certification:

    Active Member

Guangxi Ligong Machinery Co.,Ltd   We are specialized in the spare parts for loader, excavator, grader, road roller , forklift truck and paving machinery research and development, manufacturing and sales. The company focuses on providing the genuine parts of high quality and low price to... Guangxi Ligong Machinery Co.,Ltd   We are specialized in the spare parts for loader, excavator, grader, road roller , forklift truck and paving machinery research and development, manufacturing and sales. The company focuses on providing the genuine parts of high quality and low price to...

+ Read More

Get in touch with us

  • Reach Us
  • Guangxi Ligong Machinery Co.,Ltd
  • NO.3 Ruilong Road,LiuZhou City,Guangxi Province China
  • MsCICI XIONG
  • +86-18276858173
  • https://www.lgmcloader.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement