Delivery Time | 10-60 Days |
Packaging Details | Well Packed |
Max capacity | 12t |
Max tip capacity | 2t |
Max free-standing height | 60m |
Max boom jib length (radius) | 70m |
Mast Section | L68 |
Place of Origin | CHINA |
Certification | CE、ISO |
Brand Name | ZTM |
View Detail Information
Explore similar products
ZTT466 Flattop Tower Crane 26t Capacity 80m Jib Length 3.3t Tip Load Hoisting
ZTL286 Luffing Tower Crane 14t Capacity 52m Jib Length 2.2t Tip Load Hoisting
ZTL286A Luffing Tower Crane 14t Capacity 55m Jib Length 2.2t Tip Load Hoisting
ZTL326 Luffing Tower Crane 14t Capacity 55m Jib Length 2.7t Tip Load Hoisting
Product Specification
Delivery Time | 10-60 Days | Packaging Details | Well Packed |
Max capacity | 12t | Max tip capacity | 2t |
Max free-standing height | 60m | Max boom jib length (radius) | 70m |
Mast Section | L68 | Place of Origin | CHINA |
Certification | CE、ISO | Brand Name | ZTM |
High Light | Medium Tower Crane 12t ,70m Medium Tower Crane ,2t jib tower crane |
ZTT226C Flattop Tower Crane Overview
Quick Detail:
Jib length: 70M
Tip load: 2.0Ton
Max lifting capacity: 12ton
Free standing height: 60M
Max. Lifting Height:282m
Mast section: L68B1/L68B3(2*2*3m)
Place of Origin: China
Brand Name: ZTM
Core Components: PLC, Engine, Bearing, Gearbox, Motor, Gear
Color: Customer Required
Raw material:Q345B/Q355BSteel
Power Supply:380V/50Hz
Condition: New
Application: Construction
Video outgoing inspection: Provided
Machinery Test Report: Provided
Marketing Type: New Product 2020
Warranty of core components: 1 Year
ZTT226C flattop Tower crane sketch
ZTM Tower Crane advantage
● The system automatically realizes that the weight does not swing back and forth after the luffing stops.
● Avoid the hazards caused by the swing of the goods.
● Fundamentally solve the driver's jog to follow the hook to eliminate the sway problem
![]() | |
HMI advantage
During servicing, the display helps to prevent downtime, it shows warnings and error messages.This allows you to respond right away and avoid potential interruptions
Ultra-simplified structure
● Safe and high-efficient
● The low-stress flow design with the best fatigue resistance can extend the service life of the equipment
Tower crane details
Tower crane steel structure
The tower crane steel structure is all processed by the overall sand blasting process. The surface is smoother and more beautiful. It is treated with anti-corrosion blasting. It uses the highest quality paint in the tower crane industry, with strong adhesion and longer durability.
Telescopic cage Mast section Fixing angle
Boom Slewing table Collar frame Transition section
ZTM tower crane cabin
ZTM automated production line
Packaging and shipping
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
>1000000
Employee Number:
400~500
Ecer Certification:
Active Member
Jiangxi Zhongtian Intelligent Equipment Co., Ltd.(ZTM), is the pioneer of tower crane manufacturing in Jiangxi Province, Yichun City, which is about 40 minutes from Changsha by high-speed train. For over twenty years, ZTM has specialized in the research and manufacturing of tower cranes... Jiangxi Zhongtian Intelligent Equipment Co., Ltd.(ZTM), is the pioneer of tower crane manufacturing in Jiangxi Province, Yichun City, which is about 40 minutes from Changsha by high-speed train. For over twenty years, ZTM has specialized in the research and manufacturing of tower cranes...
Get in touch with us
Leave a Message, we will call you back quickly!