Payment Terms | T/T, D/A, D/P, L/C, Western Union, MoneyGram |
Supply Ability | 10000 pieces per month |
Delivery Time | 10-25 work days |
Packaging Details | Plastic box and carton box packaging |
Product Name | DLC Mandrel One-Way Mandrel Dull Mandrel Alloy Mandrel Aluminum tube mandrel |
Material | SUJ2 GCr15 or YG8 |
Specification | Φ4.14、Φ6.0、Φ6.22、Φ6.85、Φ8.55、Φ8.8、Φ14.1、Φ18.3 |
Processing | Precision CNC Lathe Turning |
Heat Treatment : | HRC 65°-68° |
Cutting Tube ID | Φ4.76 Φ5 Φ6.35 Φ7 Φ7.94 Φ9.52 Φ12.7 Φ15.88 Φ19.05 |
Quality | 100% Inspection |
Surface Finish | Ra 0.8 |
Surface Treatment | DLC coating |
Service | OEM or ODM |
Application | CNC 3D Tube Bending Machine,Copper Tube Hairpin Bender,Ruturn bender |
Usage | Bending Copper,Aluminum and Steel Tube |
Brand Name | DLC Mandrel |
Model Number | DLC Mandrel 001 |
Certification | TS16949 |
Place of Origin | china |
View Detail Information
Explore similar products
Bender Spare Parts for Bending Mandrel in Gas Water Heaters Φ8 Φ11 Φ12
Smooth Wrinkle-Free Bending Mandrel for CNC 3D Tube Bender in Refrigerator
Fast and Precise Φ12 Bending Mandrel for Copper and Aluminum Tubes
Plating Bending Mandrel for Copper Aluminum & Steel Tubes Bending
Product Specification
Payment Terms | T/T, D/A, D/P, L/C, Western Union, MoneyGram | Supply Ability | 10000 pieces per month |
Delivery Time | 10-25 work days | Packaging Details | Plastic box and carton box packaging |
Product Name | DLC Mandrel One-Way Mandrel Dull Mandrel Alloy Mandrel Aluminum tube mandrel | Material | SUJ2 GCr15 or YG8 |
Specification | Φ4.14、Φ6.0、Φ6.22、Φ6.85、Φ8.55、Φ8.8、Φ14.1、Φ18.3 | Processing | Precision CNC Lathe Turning |
Heat Treatment : | HRC 65°-68° | Cutting Tube ID | Φ4.76 Φ5 Φ6.35 Φ7 Φ7.94 Φ9.52 Φ12.7 Φ15.88 Φ19.05 |
Quality | 100% Inspection | Surface Finish | Ra 0.8 |
Surface Treatment | DLC coating | Service | OEM or ODM |
Application | CNC 3D Tube Bending Machine,Copper Tube Hairpin Bender,Ruturn bender | Usage | Bending Copper,Aluminum and Steel Tube |
Brand Name | DLC Mandrel | Model Number | DLC Mandrel 001 |
Certification | TS16949 | Place of Origin | china |
DLC Mandrel Description:
Advanced Aluminum Tube Bending Mandrel:Constructed from high-quality bearing steel with a bright titanium-plated surface, this mandrel is engineered for the precise bending of aluminum tubes. The titanium plating prevents aluminum powder from sticking, ensuring that bent pipe fittings maintain their quality. Compatible with multiple tube bending machines, including hairpin benders, return benders, and CNC benders, it is ideal for use in heat pump, aluminum heat exchanger, and refrigerator manufacturing. The mandrel ensures that aluminum tubes are bent with smooth, full, and bright finishes, free from wrinkles and imperfections. It supports tube diameters from Φ4.76 to Φ15.88, with customizable specifications available.
DLC Mandrel Specifications:
Φ4.14,Φ6.0,Φ6.22,Φ6.85,Φ8.55,Φ8.8,Φ9.6,Φ10.6,Φ12.9,Φ14.1,Φ15.5,Φ16.5,Φ18.3
DLC Mandrel Show:
Application Industry:
Manufacturing Workshop:
Guangzhou Runshi Mold Co., Ltd. focuses on the precision machinery manufacturing industry. Since its establishment, the company has mainly provided equipment molds, vulnerable parts, and cutting tools for air conditioning and heat exchanger manufacturing enterprises. It also provides ceramic parts and tungsten steel parts for industries such as new energy, fluid control, medical devices, semiconductor, aerospace, photovoltaics, lithium batteries, petrochemicals, high-precision automation equipment, electronic communication, automobiles and so on.
FAQ
Q:What is the name of this product?
A:Universal Mandrel DLC Mandrel Dull Mandrel Alloy Mandrel Aluminum tube mandrel
Q: Are you trading company or manufacturer ?
A: We are manufacturer.
Q: What industry is the DLC Mandrel mainly used for?
A: It is an important bending tube parts for CNC 3D tube bending machine and copper tube hairpin bender or return bender
Q: How to manufacture after the order is confirmed?
A: We need to provide samples or drawings, one of which is sufficient. Our production engineers are professionals with over 10 years of experience, and they know how to control tolerances and precision.
Q: How long is your delivery time?
A: Generally it is 5-10 working days if the goods are in stock. or it is 10-25 working days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=10000USD, 100% in advance. Payment>10000USD, 50% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Company Details
Year Established:
2010
Total Annual:
1500000-2000000
Employee Number:
80~100
Ecer Certification:
Verified Supplier
Company Introduction: Guangzhou Runshi Mould Co., Ltd. was established in September 2010 and is located in the core city of Guangzhou in the Guangdong Hong Kong Macao Greater Bay Area. It is adjacent to Shenzhen and Dongguan to the east, Zhongshan in Foshan... Company Introduction: Guangzhou Runshi Mould Co., Ltd. was established in September 2010 and is located in the core city of Guangzhou in the Guangdong Hong Kong Macao Greater Bay Area. It is adjacent to Shenzhen and Dongguan to the east, Zhongshan in Foshan...
Get in touch with us
Leave a Message, we will call you back quickly!