China factories

China factory - Qingdao UKD Machinery Co., Ltd.

Qingdao UKD Machinery Co., Ltd.

  • China,Qingdao ,Shandong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China 135*50 Hot Forged Parts Crankshaft Alloy Steel Lead Screw 135*50 Mold
China 135*50 Hot Forged Parts Crankshaft Alloy Steel Lead Screw 135*50 Mold

  1. China 135*50 Hot Forged Parts Crankshaft Alloy Steel Lead Screw 135*50 Mold
  2. China 135*50 Hot Forged Parts Crankshaft Alloy Steel Lead Screw 135*50 Mold

135*50 Hot Forged Parts Crankshaft Alloy Steel Lead Screw 135*50 Mold

  1. MOQ: 500 pieces
  2. Price: Dollar 1.2-1.5 per piece
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union
Supply Ability 5000000 pieces per year
Delivery Time 4-5 weeks
Packaging Details wooden box
Material Alloy Steel
Surface treatment Heat treatment
Lead time 35 days
Tolerance ± 0.015mm
Process Forging , CNC machining, Heat treatment
Standard DIN
Brand Name UKD
Model Number 135*50
Certification IATF16949
Place of Origin EU

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union Supply Ability 5000000 pieces per year
Delivery Time 4-5 weeks Packaging Details wooden box
Material Alloy Steel Surface treatment Heat treatment
Lead time 35 days Tolerance ± 0.015mm
Process Forging , CNC machining, Heat treatment Standard DIN
Brand Name UKD Model Number 135*50
Certification IATF16949 Place of Origin EU
High Light cnc metal parts ,precision machined parts

135*50 Hot Forged Parts Crankshaft Alloy Steel Lead Screw 135*50 Mold

 

 

The Product Description

 

Outline Dimension length Diameter Remark
 186  25  lead screw
Weight(kg) 0.36
Raw material  Hot Forging 
Major Process  forging+ CNC machining +package+shipment
Surface Treatment  shot blast or customized
Usage  agriculture ,Driving System
Package  carton +wooden cage
related industry  machine 
Quality Control  IQC PQC OQC

 

 

Real Photos

 

 
 

Roughly Parameters

 

Product Specification & Other information List:
1 Item Name Custom Forging Parts
2 Size As per approval product drawings.
3 DRW Format DWG, PDF, IGS, STEP, SLDPRT, SLDDRW, PRT, DRW, DXF, X_T, etc...
4 Weight 0.1-200 kg
5 Material Differenty types of Steels, Carbon Steel, Stainless Steel, Alloy Steel etc; Aluminum alloy, copper alloy, titanium alloy, tungsten molybdenum alloy and other non-ferrous metals.
6 Application Industry Equipments, Autos, Construction machinery Parts, Agricultural machinery, Railway relevant Parts, Petrochemical machinery, Mining machinery, The power industry.
7 Surface Treatment Self color, Polishing, Painting, Powder Coating, Electrophoretic Coating, Anodizing, Nickel Plating, Zinc Plating, Hot DIP Galvanizing etc.
8 Quality Control 1. IQC , PQC, OQC
2.100% check before shipment
9 Packing Plastic bags, Cartons, Racks, Plywood Cases etc. accordingly
10 Logistics Shipping, Air Flight, International Express etc.
11 Process Die Forging, Free Forging, Hot forging, Cold forging, Heat Treatment, Machining, Surface Treatment etc.
12 Certificate ISO/9001 ISO/IATF16949
13 Service Custom OEM/ODM metal parts processing, Whole Product assembly, 2D & 3D drawings design, International Delivery Logistics, Serivce before & after sales etc.

 

 

Related Products

 

 

 

FAQ
 

1. What basis can we buy goods?
We generally offer customers prices FOB& CIF (Carriage, Insurance & Freight). The CIF includes the freight cost to your nominated sea port.
We do provide clearance of goods which needs to be handled by a local freight forwarder.
All local costs and taxes are the responsibility of the buyer. We are happy to offer advisement on shipping if required.

2. Which currency can we buy in?
We can deal in USD / Euro currency / GBP.

3. How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks. It takes about 2 weeks to east coast and 3 weeks to west coast US ports. All sea goods are shipped from Qingdao Port.

4. How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

12. Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory by prior agreement.

5. How do we retain client confidentiality?
We are happy to sign Confidentiality Agreements with customers and will honor them.
 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1997

  • Total Annual:

    4,000,000-5,000,000

  • Employee Number:

    200~300

  • Ecer Certification:

    Active Member

•   Qingdao Ukd Machinery Co.,ltd Located Qingdao, The Beautiful Coast City. Our Factory Covered 8 Acres.the Building Area Is More Than 12000 Square Meters.   •   With Over 20 Years Experience,we Are Expert At Casting Parts, Sheet Metal And Welding Parts, Cnc... •   Qingdao Ukd Machinery Co.,ltd Located Qingdao, The Beautiful Coast City. Our Factory Covered 8 Acres.the Building Area Is More Than 12000 Square Meters.   •   With Over 20 Years Experience,we Are Expert At Casting Parts, Sheet Metal And Welding Parts, Cnc...

+ Read More

Get in touch with us

  • Reach Us
  • Qingdao UKD Machinery Co., Ltd.
  • No. 66, Jiading Road, Shibei District, Qingdao
  • https://www.metal-castingparts.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement