| Payment Terms | TT |
| Supply Ability | 10000 pieces per day |
| Delivery Time | 15 working days with PO and deposit |
| Packaging Details | 250 pieces packing together in a 300*250*152 mm carton |
| Material | CRS Cold Rolled Steel |
| Color | Black |
| Diameter | 28 mm |
| Thickness | 23mm |
| Head code | Round |
| HS code | 7307990000 |
| Usge | Connecting lean pipe rack system |
| Surface Treatment | Electrophoresis |
| Brand Name | Top-King |
| Model Number | HJ-1 |
| Certification | ISO9001:2008;RoHS |
| Place of Origin | Shenzhen ,China |
View Detail Information
Explore similar products
Rotational Lean Tube Steel Pipe Joints For Pipe Rack System Vertical Angle Joint
3 way Flexible Metal Pipe Joints Black Electrophoresis For Pipe Rack System
Straight Way Metal Pipe Joints PE Coated Steel Pipe For Warehouse Shelves HJ-4
Strengthen Black Metal Joint For Industrial Logistic Pipe Rack System HJ-11
Product Specification
| Payment Terms | TT | Supply Ability | 10000 pieces per day |
| Delivery Time | 15 working days with PO and deposit | Packaging Details | 250 pieces packing together in a 300*250*152 mm carton |
| Material | CRS Cold Rolled Steel | Color | Black |
| Diameter | 28 mm | Thickness | 23mm |
| Head code | Round | HS code | 7307990000 |
| Usge | Connecting lean pipe rack system | Surface Treatment | Electrophoresis |
| Brand Name | Top-King | Model Number | HJ-1 |
| Certification | ISO9001:2008;RoHS | Place of Origin | Shenzhen ,China |
| High Light | budget metal pipe joints ,cost-effective pipe rack system ,HJ-1 pipe joint system | ||
When pipe rack systems need to deliver maximum value per dollar invested, the HJ-1 Metal Pipe Joint is the component that makes a cost-effective system possible without sacrificing structural reliability or reconfiguration capability. The HJ-1 uses CRS cold rolled steel -- an economical material choice that delivers strong mechanical performance without the premium cost of stainless steel or aluminum alternatives. The black electrophoresis coating adds functional value at an economical price point: unlike expensive stainless steel, the electrophoresis coating on carbon steel provides adequate corrosion resistance for most indoor warehouse and manufacturing environments at a fraction of the material cost. The bolt-and-nut assembly system means no welding equipment, no specialized assembly stations, and no certified welders required -- costs that add significant overhead to pipe rack projects built around welded systems. The reusable nature of the HJ-1 system also means the total cost of ownership over a 10-year period is typically lower than welded systems, because the initial investment is recovered when the system is reconfigured rather than discarded.
|
Parameter |
Specification |
|
Item Model |
HJ-1 |
|
Material |
CRS Cold Rolled Steel |
|
Color |
Black |
|
Surface Treatment |
Electrophoresis |
|
Thickness |
23 mm |
|
Combination |
HJ-1 = 2pcs H-1 + M6x25 bolt and nut set |
|
Installation |
Single M6 inner hexagon key for assembly |
|
Reusability |
Fully reusable -- pipes and joints can be disassembled and reconfigured |
|
Pipe Compatibility |
Suitable for standard pipe rack systems with 23mm pipe wall thickness |
|
Finish |
Electrophoresis coating -- wear-resisting, bright luster, pollution-free |
|
Structure |
Bolted and nut fastening -- easy assembly and disassembly without special tools |
|
Application |
Industrial storage, logistics equipment, workstation, production line, commercial display |
· CRS cold rolled steel at economical cost -- cold rolled steel provides the structural strength required for pipe rack applications at a significantly lower material cost than stainless steel or aluminum, without the quality trade-offs of hot rolled steel
· Electrophoresis coating for cost-effective corrosion protection -- electrophoretic coating on carbon steel provides adequate corrosion resistance for most indoor industrial environments at a fraction of the cost of stainless steel, with better corrosion resistance than paint or powder coating
· No welding equipment or certified labor required -- the bolted assembly system eliminates the significant capital and labor overhead associated with welded pipe rack fabrication, reducing total installed cost substantially
· Complete HJ-1 kit reduces procurement complexity -- each HJ-1 ships with the two H-1 joints and M6x25 hardware required for full assembly, eliminating the common problem of partial shipments that delay installation
· Lower total cost of ownership over system lifecycle -- the reusable bolted joint design means the investment is recovered at every reconfiguration rather than being written off as a permanent structure, delivering better ROI over 5 to 10 year planning horizons
Cost-sensitive warehouse storage racking, budget-conscious production line construction, contract manufacturer facility fit-outs, start-up manufacturing operation infrastructure, educational and training facility workshop installations, and any application where the total project budget is constrained but structural performance requirements remain non-negotiable. The reusable nature of the system is particularly valuable in start-up and early-stage manufacturing operations where the initial layout is likely to change significantly as the business scales, and where capital preservation across layout changes matters more than the lowest possible first-cost installation.
The cost effectiveness of the HJ-1 system is not simply a matter of low component price -- it is the result of a design philosophy that optimizes for total installed cost and lifecycle value rather than first-cost minimization. The CRS cold rolled steel material is chosen deliberately: it has the strength and machinability needed for the application without the material premium of higher-grade steels. The electrophoresis coating is applied electrostatically in a controlled bath, which is a highly efficient coating process that uses material very efficiently compared to spray or brush application methods -- this efficiency translates directly into a lower coating cost per part. The bolted assembly system is where the most significant cost savings are realized compared to welded alternatives: in a typical warehouse racking project, the welding equipment, certified welder labor, welding consumables, weld inspection, and post-weld finishing together can represent 30 to 40 percent of the total installed cost of the racking. The HJ-1 eliminates all of these costs by using mechanical fastening, which any trained worker can perform without specialized certification. The reusable bolted design then compounds this advantage over the system lifecycle: a welded rack that needs to be reconfigured after three years typically requires cutting and re-welding, at a cost comparable to the original fabrication. The HJ-1 system simply gets disassembled and rebuilt at the new configuration, at a labor cost roughly equivalent to the original assembly.
Combination:
one HJ-1 is combine with 2 pcs of H-1 ,and one set of M56*25 nut and screw
![]()
![]()
![]()
![]()
![]()
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
2006
Total Annual:
30.2 Million-32.8 Million
Employee Number:
80~100
Ecer Certification:
Verified Supplier
Shenzhen Jingji Technology Co., Ltd was established in 2006. It is a 12 years history in pipe rack system industry as professional supplier which incorporates with industry and trade. Our company has two production bases under the Holding for manufacturing different pipe rack parts. &nb... Shenzhen Jingji Technology Co., Ltd was established in 2006. It is a 12 years history in pipe rack system industry as professional supplier which incorporates with industry and trade. Our company has two production bases under the Holding for manufacturing different pipe rack parts. &nb...
Get in touch with us
Leave a Message, we will call you back quickly!