Payment Terms | L/C, T/T, Western Union, MoneyGram, D/A, D/P |
Supply Ability | 20 sets /month |
Delivery Time | Shipped in 30-70 days after payment |
Packaging Details | Export standard sea package with film and steel |
Material | PPGI |
Raw material | Steel coil |
Roller material | 45# Steel |
Warranty | 2 Years |
Voltage | 380V 50Hz |
Control system | PLC ( Panasonic) |
Production Capacity | 10-15m/min |
Brand Name | Dingbo |
Model Number | DBDF |
Certification | ISO CE SGS |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
SGS Hollow Metal Door Frame Roll Forming Machine With Hydraulic Post Cutting
Full Automatic Cutting Door Frame Making Machine High Speed Pass CE And ISO
Low Noise Door Frame Roll Forming Machine , Metal Rolling Equipment With ISO
Vacationland Steel Door Frame Manufacturing Machines With 380V / 50Hz / 3Phase
Product Specification
Payment Terms | L/C, T/T, Western Union, MoneyGram, D/A, D/P | Supply Ability | 20 sets /month |
Delivery Time | Shipped in 30-70 days after payment | Packaging Details | Export standard sea package with film and steel |
Material | PPGI | Raw material | Steel coil |
Roller material | 45# Steel | Warranty | 2 Years |
Voltage | 380V 50Hz | Control system | PLC ( Panasonic) |
Production Capacity | 10-15m/min | Brand Name | Dingbo |
Model Number | DBDF | Certification | ISO CE SGS |
Place of Origin | Jiangsu, China | ||
High Light | steel door frame manufacturing machines , door frame making machine |
Metal Door Frame Roll Forming Machine , Steel Roll Formers For Building Material
Product Features And Descriptions
The door frame of the door frame molding machine refers to the frame that surrounds the doorway and top of the door, and is mounted on the wall, usually supporting the door frame of the door and exposed door.
Working flow
Uncoiler--Feeding--Punching--Leveling--Roll-forming--Hydraulic-cutting--Output table
Product Parameters
Main Motor Power | 7.5 kw |
Hydraulic Station Powder | 3 kw |
Hydraulic Oil Pump | CE-310 |
Sprocket | P-25.4mm |
Control System | PLC |
Yield Strength | 32Mpa |
Diameter of Axis | 80mm |
Material Roller | #45 steel hard chrome plating |
Processing speed | 8-12m/min |
Frame | 30H steel welding |
Roller plate thickness | 0.3-1mm |
Use | The machine used to produce all kinds of house |
Machine components
Decoiler,Punching-machine,Main forming machine,PLC control system,Hydraulic pump station,Post cutting,Electric motor,Output table
Picture
After sale services
1.Engineer will give free training lessons to labors in buyer’s factory.
2.The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 for engineer per day.
3.During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
4.We will charge the buyer cost price of spare parts beyond 2 years and provide long-term technical guide.
FAQ
1. Does one machine can only produce one size?
Not exactly, it depends on which profile the customer want to produce.
2.Do you have after-sales technical support?
Yes,we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
3. You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
4.How long the machine could be made?
Normally speaking, high precision roll forming machine could be made out with 40 working days.If you need machines in hurry, we can make it for you less than a month.
5. Do you provide customized?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
6. May we visit your factory?
Sure,Warmly welcome to our factory at any time.
7.How to visit your factory?
By high speed train from Shanghai to East Wuxi (Wuxi Dong station), half an hour.
8.What's the warranty period?
12 months warranty period, starting from the date of the successful installation and commissioning of the equipments at the Buyer’s Installation site.
9.Can we arrange shipment?
Yes, sure, we can arrange shipment for our customers and provide door-to-door service.
Best Regards
Andy Yang
Director
Mobile/Wechat/Skype:0086 139 2126 2246
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2008
Total Annual:
3 Million-5 million
Employee Number:
45~60
Ecer Certification:
Active Member
Company introduction We are located in Jiangyin city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 20 years’ experience. It has gained highly praise by customers from all over the world, due to top qua... Company introduction We are located in Jiangyin city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 20 years’ experience. It has gained highly praise by customers from all over the world, due to top qua...
Get in touch with us
Leave a Message, we will call you back quickly!