Payment Terms | L/C,T/T,D/P |
Supply Ability | 30 PCS per month |
Delivery Time | 30 days after order confirmed |
Packaging Details | Plywood case |
Display | Digital |
Installation | Direct Connected |
Usage | Multi-Functional Energy Meter, Watt-Hour Meter, Meter for Industry and Home Use, Standard Electric Energy Meter, Prepayment Meter, Reactive Energy Meter, Multi-rate Watt-hour Meters, Maximum Demand Meter |
Theory | Electronic Meter |
Computer Control | Yes |
Brand Name | GENY |
Model Number | YC1891D |
Certification | ISO, CE |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Professional Three-Phase Stationary Meter Test Bench for Electric Energy Meter
Accuracy 0.02% Energy Meter Test Bench 3 Phase With ICTs For Smart Meter
Yc1891d-12 Meter Test System Watt Hour Single Phase Energy Meter Test Bench
Three Wire Electric Meter Test Bench YC1893D-12 Electrical Meter Calibration
Product Specification
Payment Terms | L/C,T/T,D/P | Supply Ability | 30 PCS per month |
Delivery Time | 30 days after order confirmed | Packaging Details | Plywood case |
Display | Digital | Installation | Direct Connected |
Usage | Multi-Functional Energy Meter, Watt-Hour Meter, Meter for Industry and Home Use, Standard Electric Energy Meter, Prepayment Meter, Reactive Energy Meter, Multi-rate Watt-hour Meters, Maximum Demand Meter | Theory | Electronic Meter |
Computer Control | Yes | Brand Name | GENY |
Model Number | YC1891D | Certification | ISO, CE |
Place of Origin | CHINA |
The YC1891D test bench is designed for automatic, semi-automatic or manual calibration of mechanical, electro-mechanical and electronic single-phase meters. It integrates a programmable single-phase power source, high-accuracy reference meter, meter suspension rack, multi-channel server and precision clock source. Widely used by State Grid / Southern Grid metrology centers, power-supply utilities, energy-management agencies, industrial plants and meter manufacturers, the YC1891D offers fast, traceable and reliable meter verification in compliance with IEC 62052-11, IEC 62053-21 and other relevant standards.
YC1891D-6 | YC1891D-12 | YC1891D-24 | YC1891D-48 | |
Number of meter positions | 6 | 12 | 24 | 48 |
Accuracy | 0.05 | |||
Power Source | YCS-101-250 | YCS-101-600 | YCS-101-1200 | YCS-101-2500 |
Standard Meter | SZ01A-K3 | |||
MSVT | HJ200GL-6 | HJ200GL-12 | HJ200GL-24 | HJ200GL-48 |
QCD | D5 series | |||
Scanning Head | YCG-2 series | |||
Voltage | ||||
Test voltage output | 24V – 300V or customized | |||
Power of the voltage output | 100VA | 250VA | 500VA | 1000VA |
Resolution | Better than 0.01% of full scale value of range | |||
Setting accuracy | Better than 0.05% at the final range value | |||
Stability | Better than 0.005%/h (integration time 150 s) | |||
Load regulation from 0-max. load | Better than 0.01% | |||
Distortion factor | Better than 0.3% for linear resistance load | |||
Harmonics | 2nd – 21st free programmable | |||
Current | ||||
Test current output | 1mA – 100A or customized,Max.200A | 1mA – 100A | ||
Power of the current output | 150VA | 350VA | 750VA | 1500VA |
Resolution | Better than 0.01% of full scale value of range | |||
Setting accuracy | Better than 0.05% at the final range value | |||
Stability | Better than 0.005%/h (integration time 150 s) | |||
Load regulation from 0-max. load | Better than 0.01% | |||
Distortion factor | Better than 0.3% for linear resistance load | |||
Harmonics | 2nd – 21st free programmable | |||
Phase angle | ||||
Range | 0 -- 360° | |||
Resolution | 0.01° | |||
Setting accuracy | 0.1° | |||
Frequency | ||||
Range | 45Hz – 65Hz | |||
Resolution | 0.01Hz | |||
Error display | ||||
Type of error display | Red LED | |||
Resolution of the error displays | 8 digits | |||
Voltage Supply | 220V±10% or customized 50/60Hz±2Hz | 3x220/380V±10% or customized 50/60Hz±2Hz | ||
Ambient temperature | -10°C -- +40°C | |||
Relative humidity | 35% -- 85% |
• Auto / semi-auto / manual modes for mechanical, electro-mechanical & electronic 1P2W meters
• Active, reactive & cross-reactive power testing per IEC/MID
• MSVT for meters with closed I-P links, optional 2-element switch
• Parallel testing of mixed meter constants; auto rotor-mark alignment for discs
• Built-in starting & creeping tests; overload, short-V, open-I protection
• Sync swing heads, lightweight corrosion-proof aluminum frame
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1987
Total Annual:
2,000,000-10,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Guangzhou GENY Electric Co. Ltd. is a leading manufacturer of energy meter test systems, whose predecessor is Guangzhou Yangcheng Science & Technology Enterprises Co., Ltd. which was established in 1987. We have been dedicated to the energy meter testing industry for over 30 years, and continuou... Guangzhou GENY Electric Co. Ltd. is a leading manufacturer of energy meter test systems, whose predecessor is Guangzhou Yangcheng Science & Technology Enterprises Co., Ltd. which was established in 1987. We have been dedicated to the energy meter testing industry for over 30 years, and continuou...
Get in touch with us
Leave a Message, we will call you back quickly!