China factories

China factory - Changzhou Vic-Tech Motor Technology Co., Ltd.

Changzhou Vic-Tech Motor Technology Co., Ltd.

  • China,Changzhou ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear
China VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear

  1. China VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear
  2. China VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear
  3. China VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear
  4. China VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear
  5. China VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear
  6. China VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear

  1. MOQ: 1Unit
  2. Price: $11~$32/Unit
  3. Get Latest Price
Payment Terms Western Union, T/T, L/C, MoneyGram
Supply Ability 100000 Units/year
Delivery Time 15-30 work days
Packaging Details Standard export package in corrugated carton (Mass production).
Motor type Linear stepper motor
Motor diameter 20 mm
Step angle 7.5°/step
Phase current 160 mA/phase
Phase number 2 phases (Bipolar)
Coil resistance 74.5Ω/phase
Brand Name VIC-TECH
Model Number VSM20A-48S
Certification RoHS, ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms Western Union, T/T, L/C, MoneyGram Supply Ability 100000 Units/year
Delivery Time 15-30 work days Packaging Details Standard export package in corrugated carton (Mass production).
Motor type Linear stepper motor Motor diameter 20 mm
Step angle 7.5°/step Phase current 160 mA/phase
Phase number 2 phases (Bipolar) Coil resistance 74.5Ω/phase
Brand Name VIC-TECH Model Number VSM20A-48S
Certification RoHS, ISO9001 Place of Origin China
High Light permanent magnet linear stepper motor ,20mm diameter linear stepper motor

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

VSM20A-48S is 20mm diameter linear stepper motor with 135mm length extra long trapezoidal lead screw. The length of lead screw is adjustable.

Besides lead screw, motor’s resistance, step angle can all be customized.

Customers can adjust all the parameters based on their own requirement.

 

Screw lead determines motor’s linear speed and thrust, with longer lead, motor has higher linear speed, with smaller linear pushing force/thrust.

We have two different types of step angle, including 7.5° and 15°/step.

With higher rated voltage, motor has higher coil resistance, and it depends on customer’s power supplier and driver parameters.

 

Typical applications:

* Medical Equipment

* Linear Robotic Control

* Precision Calibration

* High Precision Valve

* Other Precise Position Movement

 

Plus tt has extra low noise and high stability.

Design Layout (Unit:mm)

Parameter sheet:

Motor type Linear stepper motor
Motor diameter 20mm
Rated power 3.4W
Rated voltage 12V DC
Phase current 160mA/pahse
Phase resistance 74.5Ω/phase
Phase inductance 36 mH/phase
Step angle 7.5°/step
Screw lead 0.6096mm (customizable)
Step length 0.0127mm/step
Leads crew length 135 mm (customizable)
Phase No. 2 phases
Driving method 2-2 excitation

 

Chart of Thrust vs speed(PPS):

Competitive Advantage

  • High quality and the best price.

  • Fast deliver,storage company and rich inventory

  • Near Shanghai port, the traffic is very convenient.

Product Detail Presentation

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Exporter,Trading Company

  • Year Established:

    2011

  • Total Annual:

    5000000-6000000

  • Employee Number:

    20~100

  • Ecer Certification:

    Verified Supplier

CHANGZHOU VIC-TECH MOTOR TECHOLOGY CO., LTD Changzhou Vic-Tech Motor Techology Co., Ltd has been specializing in producing micro motors and accessories since 2011.Our main products:Micro stepper motor,geared motor,underwater thruster and motor drivers and controllers.   We have a R &... CHANGZHOU VIC-TECH MOTOR TECHOLOGY CO., LTD Changzhou Vic-Tech Motor Techology Co., Ltd has been specializing in producing micro motors and accessories since 2011.Our main products:Micro stepper motor,geared motor,underwater thruster and motor drivers and controllers.   We have a R &...

+ Read More

Get in touch with us

  • Reach Us
  • Changzhou Vic-Tech Motor Technology Co., Ltd.
  • No.28,Shunyuan Road,Xinbei Dist,Changzhou,Jiangsu,China(Mainland)
  • https://www.micro-steppermotor.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement