China factories

China factory - Changzhou Vic-Tech Motor Technology Co., Ltd.

Changzhou Vic-Tech Motor Technology Co., Ltd.

  • China,Changzhou ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor
China VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor

  1. China VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor
  2. China VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor
  3. China VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor
  4. China VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor
  5. China VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor

  1. MOQ: 1Unit
  2. Price: $11~$31/Unit
  3. Get Latest Price
Payment Terms Western Union, T/T, L/C, MoneyGram
Supply Ability 100000 Units/year
Delivery Time 15-30 work days
Packaging Details Standard export package in corrugated carton (Mass production).
Motor type Permanent Magnet Linear stepper motor
Motor diameter 25 mm
Step angle 7.5°
Phase current 160 mA
Phase number 2 phases (Bipolar)
Coil resistance 70Ω/phase
Brand Name VIC-TECH
Model Number VSM25C-48S-0127-145-01
Certification RoHS, ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms Western Union, T/T, L/C, MoneyGram Supply Ability 100000 Units/year
Delivery Time 15-30 work days Packaging Details Standard export package in corrugated carton (Mass production).
Motor type Permanent Magnet Linear stepper motor Motor diameter 25 mm
Step angle 7.5° Phase current 160 mA
Phase number 2 phases (Bipolar) Coil resistance 70Ω/phase
Brand Name VIC-TECH Model Number VSM25C-48S-0127-145-01
Certification RoHS, ISO9001 Place of Origin China
High Light long lead screw linear stepper motor ,permanent magnet linear stepper motor ,25mm diameter linear stepper motor

VSM25C-48S 25mm Diameter External Drive Long Leadscrew Permanent Magnet Linear Stepper Motor

 

This is a 25mm diameter linear stepper motor equipped with an extra-long 145mm leadscrew. The leadscrew length is adjustable.

Since the leadscrew lead determines the motor's linear speed and thrust, a longer lead results in a higher linear speed but lower linear thrust/force.

We offer two different step angles: 7.5°/step and 15°/step.

Higher rated voltage results in higher motor coil resistance, which depends on the customer's power supply and driver parameters.

Customers can select all parameters according to their needs.

 

 

 

 

Typical applications:

* Medical Equipment

* Linear Robotic Control

* Precision Calibration

* High Precision Valve

* Other Precise Position Movement

 

Plus tt has extra low noise and high stability.

Design Layout (Unit:mm)

Parameter sheet:

Motor type Linear stepper motor
Motor diameter 25mm
Rated voltage 12V DC
Phase current 160mA
Phase resistance 70Ω/phase
Phase inductance 65 mH/phase
Step angle 7.5°
Screw lead 0.6096mm (customizable)
Step length 0.0127mm/step
Leads crew length 145 mm (customizable)
Phase No. 2 phases
Driving method 2-2 excitation

 

 

 

Competitive Advantage

  • High quality and the best price.

  • Fast deliver,storage company and rich inventory

  • Near Shanghai port, the traffic is very convenient.

Product Detail Presentation

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Exporter,Trading Company

  • Year Established:

    2011

  • Total Annual:

    5000000-6000000

  • Employee Number:

    20~100

  • Ecer Certification:

    Verified Supplier

CHANGZHOU VIC-TECH MOTOR TECHOLOGY CO., LTD Changzhou Vic-Tech Motor Techology Co., Ltd has been specializing in producing micro motors and accessories since 2011.Our main products:Micro stepper motor,geared motor,underwater thruster and motor drivers and controllers.   We have a R &... CHANGZHOU VIC-TECH MOTOR TECHOLOGY CO., LTD Changzhou Vic-Tech Motor Techology Co., Ltd has been specializing in producing micro motors and accessories since 2011.Our main products:Micro stepper motor,geared motor,underwater thruster and motor drivers and controllers.   We have a R &...

+ Read More

Get in touch with us

  • Reach Us
  • Changzhou Vic-Tech Motor Technology Co., Ltd.
  • No.28,Shunyuan Road,Xinbei Dist,Changzhou,Jiangsu,China(Mainland)
  • https://www.micro-steppermotor.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement