Supply Ability | 100TONS PER MONTH |
Packaging Details | EXPORT BAGS |
Name | Gold ore dressing agent |
Model | Chemical Auxiliary Agent |
Type | Ore Dressing Equipment |
Origin | Henan, China |
Warranty | 12 months |
Classification | Ore Dressing Equipment |
Key word | Metallic Ore Dressing Agent |
Port | Qingdao |
application | Gold leaching process |
Brand Name | ZTIC |
Model Number | Ore Dressing Equipment |
Certification | ISO, CE |
Place of Origin | Henan, China |
View Detail Information
Explore similar products
Low Failure Rate Sand Washing Equipment 20-180t/H 12 Months Warranty
Automated 1500mm Screw Bucket Wheel Sand Washer Machine Low Maintenance Rate
ISO 0.8-1.2rpm XS2600 Sand Washing Machine for mining Long Service Life
High Automation Reliability Ore Dressing Equipment Sand Washer Machine 200-300t
Product Specification
Supply Ability | 100TONS PER MONTH | Packaging Details | EXPORT BAGS |
Name | Gold ore dressing agent | Model | Chemical Auxiliary Agent |
Type | Ore Dressing Equipment | Origin | Henan, China |
Warranty | 12 months | Classification | Ore Dressing Equipment |
Key word | Metallic Ore Dressing Agent | Port | Qingdao |
application | Gold leaching process | Brand Name | ZTIC |
Model Number | Ore Dressing Equipment | Certification | ISO, CE |
Place of Origin | Henan, China |
Reliable Easy To Use And Environmentally Friendly Gold Leaching Agent
Environmentally friendly gold leaching agents are environmentally friendly alternatives to traditional sodium cyanide for gold extraction, designed to reduce environmental pollution and ecological hazards during gold mining. Their core ingredients are typically low- or non-toxic inorganic or organic compounds, such as thiourea, thiosulfate, sodium polysulfide, halide systems, or specific environmentally friendly chelating agents.
Instruction of Usage
1. Environmentally Friendly Gold Leaching Agent Implementation Standard
Q/LYHD-001-2015
2. Applicable Production Processes
Applicable to granular oxidized gold and silver ores. Production processes include heap leaching, tank leaching, mixing, carbon-in-slurry leaching, and mine cleaning.
3. Product Form
This product is available in solid block or powder form and is readily soluble in water. It can be used immediately after dissolving in water.
Main Ingredients: Sodium oxide, iron carbide, nitrogen, ammonium, calcium, etc.
4. pH Adjustment
During production, first adjust the return water pH to 11±1 with caustic soda or quicklime before adding this solution.
5. Usage Concentration
The optimal solution concentration should be determined experimentally based on the actual ore composition.
6. Usage Instructions
In actual production, this method is similar to the sodium cyanide method. The barren solution can be reused and is compatible with the cyanide method. The barren solution from this method is added to the barren solution tank and continuously rinsed and dissolved with return water. If black residue is produced, it will not affect subsequent use.
7. Precautions
a) It is recommended to use golden coconut shells as a supplementary extractant to absorb carbon or zinc dust.
b) It is recommended to test the content, pH value, and concentration of the gold-rich solution.
c) It is not recommended to mix strong oxidants such as hydrogen peroxide and potassium permanganate with the gold leaching agent (partial pretreatment is acceptable).
d) During the pretreatment of complex ores, this method is incompatible with auxiliary agents such as ammonium hydroxide, sodium sulfide, potassium ferrocyanide, lead nitrate, and sodium hypochlorite.
e) There is no repulsion when used with sodium cyanide.
f) The "oxygen-enriched leaching process" of the full-slime cyanide carbon-in-pulp method has a negative impact on gold extractants.
Product Pisplay
FAQ
Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts.
3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates.
Q:Delivery time:
A: Parts lead time 1-2months, machines 2-3months.
Q:Payment terms:
A: Accept payment type: T/T, L/C, Western union,Cash.
30% deposit when signed contract. Full payment paid before shipping.
Q: Quality warranty?
A: Guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply.
Q: After sales service?
A: We can supply technical guide for machines running test and parts maintenance if end user needs.
After Sales Service
ZTIC Heavy Industries is your business partner in the After Market.
ZTIC able to provide:
1. ENGINEERED SPARES - DESIGN AND MANUFACTURING
2. LARGE VOLUME STEEL AND IRON CASTING FOUNDARIES
3. HUGE MACHINE SHOP CAPABILITIES
4. TRAINING PROGRAMMES
5. PREVENTATIVE MAINTENANCE PROGRAMS
6. PREVETATIVE MAINTENANCE SERVICES
7. COMPREHENSIVE MAINTENANCE PROGRAMS
Company Details
Business Type:
Manufacturer
Year Established:
1981
Total Annual:
80 million-100 million
Employee Number:
500~1000
Ecer Certification:
Verified Supplier
Luoyang Zhongtai Industries Co., Ltd. The company was founded in 1981 and finished joint stock reform in 2005. There are eight subsidiaries and it's an independent legal entity with the qualifications of operating import & export trade. With a garden-like industrial park and modern st... Luoyang Zhongtai Industries Co., Ltd. The company was founded in 1981 and finished joint stock reform in 2005. There are eight subsidiaries and it's an independent legal entity with the qualifications of operating import & export trade. With a garden-like industrial park and modern st...
Get in touch with us
Leave a Message, we will call you back quickly!