China factories

China factory - HUATEC  GROUP  CORPORATION

HUATEC GROUP CORPORATION

  • China,Beijing ,Beijing
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China HCDX-3000A AC Magnetic Particle Flaw Detector 0-3000A
China HCDX-3000A AC Magnetic Particle Flaw Detector 0-3000A

  1. China HCDX-3000A AC Magnetic Particle Flaw Detector 0-3000A
  2. China HCDX-3000A AC Magnetic Particle Flaw Detector 0-3000A

HCDX-3000A AC Magnetic Particle Flaw Detector 0-3000A

  1. MOQ: 1 pc
  2. Price: USD3730/set - USD4220/set
  3. Get Latest Price
Payment Terms T/T,Paypal
Supply Ability 5sets/Month
Delivery Time 20-30 working days after receipt of your payment
Packaging Details Carton packing box
AC current 0-3000A
Power input 380V/50Hz
Automatic demagnetizing current AC 3000A~0 continuously adjustable
Output cable 3 copper-core flexible cables (120mm2) of 3 meters
Remanence stability ≤±5%
Brand Name HUATEC
Model Number HCDX-3000A
Certification CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T,Paypal Supply Ability 5sets/Month
Delivery Time 20-30 working days after receipt of your payment Packaging Details Carton packing box
AC current 0-3000A Power input 380V/50Hz
Automatic demagnetizing current AC 3000A~0 continuously adjustable Output cable 3 copper-core flexible cables (120mm2) of 3 meters
Remanence stability ≤±5% Brand Name HUATEC
Model Number HCDX-3000A Certification CE
Place of Origin China
High Light AC magnetic particle flaw detector3000A flaw detection equipmentnon-destructive testing magnetic detector

HCDX-3000 AC Magnetization HWDC DC function Movable Magnetic Particles Flaw Detector

 

I Structure characteristic

A 10 square three-core cable is equipped for the power input, one end is connected to the upper end of the circuit breaker, and the other end is connected to the air switch on the power grid distribution board, also the body is grounded.

RD and BK wires of the three-core cable are connected to the power phase conductor, and the BU wire is connected to the protective grounding cable.

Protection circuit breaker is below the front operating panel. Turn on the external power supply, upward close the circuit breaker, turn on the power switch, then the main circuit is connected to 380V power supply.

For ease of disassemble and replacement of the output cable, apply the high current wiring copper bar to easily connect the magnetized coil or the rod electrode.

A detachable copper head is equipped for the rod electrode, which can contact the workpiece through the copper mesh pad, so faults are not easy to be caused by poor contact. For the rod electrode with a button switch, a three-core cable can be connected to round socket in the middle of copper bar through a circular aviation plug. And for the button switch, also it can be used same as the "Trigger" button on the panel. Once the circular aviation plug on the three-core cable of the foot switch connects to the circular socket, and the foot switch can be used with the "Trigger" button.

 

II Technical specification:

AC magnetization current

AC 0~3000A (effective value) continuously adjustable,short-time intermittent power, with power off phase control;

Automatic demagnetizing current AC 3000A~0 continuously adjustable, demagnetization time is shortened with the decrease of current;
Output cable 3 copper-core flexible cables (120mm2) of 3 meters
Power supply

380V (two-phase three-wire system) ±10%, 50Hz, instantaneous current is about 100A;

Dimensions

750(L)× 420(W)×900(h) mm; (not include the handle);

Remanence stability

≤±5%;

Size & weight  1000*450*800mm,150kg

 

 

III Application & usage

1 Notice and attention before use

Pls read this instruction manual in detail. First time or long time before use, pls check whether the external parts are well intact, also you can open the cover to check whether if any loose of the internal parts, but pls do not disassemble and assemble any parts without permission.

It should be stored and used in a dry, clean, well-ventilated environment without acid or alkali and other corrosive gases. This environment should not have high temperature and strong vibration or impact.

Before switching on the power supply, pls check whether the power supply is consistent with the required power supply, as well as whether the connection is correct, and whether the power grid and switch capacity meet the requirements

2 Use &Operation

 

(1) Connect the power cable to the power grid, connect the power distribution cabinet, and connect the main circuit to the power grid, then close the breaker handle upward;

(2) Switch on the "Power", "Power" indicator light, then it realizes circuit control on the power supply and exhaust fan starts work;

(3) Connect one copper end of two 120mm2 cables to the output copper bar, and the other end to the coil or rod electrode, or wind the cables into coils after series.

(4) Press on the panel trigger button or foot switch, trigger circuit will trigger pulse to control the SCR work, and realize AC magnetization inspection;

(5) Connect the rod electrode to the workpiece, or wind the cable to the workpiece or through threading-bar technique.

(6) Press the trigger button or foot switch, adjust the current adjusting knob to make ammeter indicated the current value required by flaw detection, and then press the trigger button to complete the magnetization. Under maximum current, apply external magnetic particle inspection, generally the magnetization time is less than 2 seconds, and there should be more than 5-10 times of intermittent time (less magnetization times, multiple of intermittent time can be reduced accordingly).

(7) If demagnetization is needed, just turn the "Mag. / Demag." selector switch to the "Demag." and make operations as above steps (1) to (7);

(8) When stopping use, turn off the main "Power" switch and power distribution board switch, and remove the external accessories if necessary.

3 Corrective maintenance

(1) If the fuse or SCR is damaged, where the primary current of the main transformer is too large, fast fuse will be broken (meanwhile, the red indicator sticks out) or even the SCR will be damaged.

(2) As there is certain margin in the use of the rod electrode, so the potentiometer needs to be adjusted from the minimum slowly during using, and pls do not use in the maximum position;

(3) During maintenance, pls be noted that: before connecting the switch on the power grid distribution board, each plug holder should be inserted properly so as to prevent accidents caused by poor contact.

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Exporter,Seller

  • Year Established:

    2007

  • Total Annual:

    500000-1000000

  • Employee Number:

    35~50

  • Ecer Certification:

    Verified Supplier

HUATEC Group is a reliable manufacturer and supplier of testing instruments in Beijing China. HUATEC Group combines all the R/D and production advantage of all its own subsidiaries, takes advantage of its years marketing and sales experience in global market, contributes to offering most qualified... HUATEC Group is a reliable manufacturer and supplier of testing instruments in Beijing China. HUATEC Group combines all the R/D and production advantage of all its own subsidiaries, takes advantage of its years marketing and sales experience in global market, contributes to offering most qualified...

+ Read More

Get in touch with us

  • Reach Us
  • HUATEC GROUP CORPORATION
  • 7th Floor, Chengyuan Building B, the Mid. Road of Jiancaicheng Haidian Dist.BeiJing,CHINA 100096
  • https://www.ndttester.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement