Payment Terms | D/A, D/P, T/T, Western Union, MoneyGram, L/C |
Supply Ability | 50,000 pcs/month |
Delivery Time | 10-15 days |
Packaging Details | Bundle Packing, Wooden Cases, Woven Cloth, Plastic Packing |
Application | Petrochemical, oil, exchange |
Powder Or Not | Not Powder |
MOQ | 100KGS |
Wall thickness | SCH5~SCHXXS |
Surface | Bright Annealed |
Resistance (μΩ.m) | 15-25 |
Size | Customized |
Ultimate Strength (≥ MPa) | 700 |
Shape | Round Shape |
Brand Name | TOBO |
Model Number | Nickel Pipe |
Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
Place of Origin | CHINA |
View Detail Information
Explore similar products
25mm*2mm*2500mm Seamless Nickel Alloy Steel Pipe UNS NO10276 ASTM B622
NO8800 1'' SCH40 Seamless Nickel Alloy Steel Pipe Incoloy 800 for Gas
Alloy 800 Welded Alloy Steel Pipe Nickel Alloy Pipe 12'' STD ERW ASTM B36.10
Hastelloy C-276 8 inch SCH80 Seamless Nickel Alloy Steel Pipe ASTM B36.10
Product Specification
Payment Terms | D/A, D/P, T/T, Western Union, MoneyGram, L/C | Supply Ability | 50,000 pcs/month |
Delivery Time | 10-15 days | Packaging Details | Bundle Packing, Wooden Cases, Woven Cloth, Plastic Packing |
Application | Petrochemical, oil, exchange | Powder Or Not | Not Powder |
MOQ | 100KGS | Wall thickness | SCH5~SCHXXS |
Surface | Bright Annealed | Resistance (μΩ.m) | 15-25 |
Size | Customized | Ultimate Strength (≥ MPa) | 700 |
Shape | Round Shape | Brand Name | TOBO |
Model Number | Nickel Pipe | Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
Place of Origin | CHINA |
Incoloy Nickel Alloy Pipe 800 825 840 Nickel Alloy Tube
Q1: What's your terms of payment?
A: 30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance.
Q2: What's the terms of delivery?
A: EXW, FOB, CFR, CIF
Q3: What's the terms of packing?
A: Generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What's your delivery time?
A: For stocks, we could transport the goods to loading port within 7 work days after we received the deposit. For production period, it usually takes about 15 days to 30 days after we received the deposit.
Q5: Could you produce according to the samples?
A: Yes, we can customer-made by your samples or technique drawings, we can build the mold and fixtures.
Q6: Could you provide the compliment samples?
A: Yes, we could provide the free samples on condition that it is available in stocks, however, the transportation fee is borne by buyer.
Q7: How could you guarantee your products quality?
A: Each piece of products is manufactured by certified workshops, inspected piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
3,000,000-10,000,000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicia... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicia...
Get in touch with us
Leave a Message, we will call you back quickly!