Payment Terms | T/T, L/C, Western Union |
Supply Ability | 3,0000pcs per month |
Delivery Time | 10-50 days depending on quantity |
Packaging Details | Standard export sea-worthy packing |
Alloy or not | Is Alloy |
Technique | Hot Rolled |
Standard | ASTM,DIN,GB |
Secondary or not | Non-secondary |
Material | customed |
Brand Name | TOBO |
Model Number | 5.8m,6m,11.8m,12m,or as required |
Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
Place of Origin | China |
View Detail Information
Explore similar products
ASTM A798 F53 UNS S32750 6" SCH80 Super Duplex Steel Pipe
ASME B16.5 Threaded Reducing Flange NPT LJ RF Flange For Chemicals And Gas
Nickle Alloy Stainless Steel Seamless Pipe Round Shape Cold Rolled ISO
UNS N10001 Alloy B Nickel Alloy Seamless Pipe Wet Chlorine Resistant High
Product Specification
Payment Terms | T/T, L/C, Western Union | Supply Ability | 3,0000pcs per month |
Delivery Time | 10-50 days depending on quantity | Packaging Details | Standard export sea-worthy packing |
Alloy or not | Is Alloy | Technique | Hot Rolled |
Standard | ASTM,DIN,GB | Secondary or not | Non-secondary |
Material | customed | Brand Name | TOBO |
Model Number | 5.8m,6m,11.8m,12m,or as required | Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
Place of Origin | China | ||
High Light | OD 6mm Nickel Alloy Pipe ,1mm Thickness Nickel Alloy Pipe ,ASTM Nickel Alloy Pipe |
Steel Pipe Wholesale Outer Diameter 6mm-630mm Wall Thickness 1mm-80mm Retail Cutting Processing Alloy Tube
Mainly used for conveying gas and heating.
Most old houses were made of galvanized pipe, gas, heating, now with the kind of iron pipe and galvanized pipe, galvanized pipe as water pipes, use a few years later, the tube to produce large amounts of rust scale, outflow of including not only pollute the clean is provided, and mixed with smooth wall not breed bacteria, heavy metal corrosion caused by the water content is too high, cause serious damage to human body health.
60 70 time, developed country begins to develop new-style pipe material on the international, prohibit galvanizing pipe in succession.The Ministry of Construction of China and other four ministries and commissions also issued a document from 2000 to ban galvanized pipe, currently the new cold water pipe has rarely used galvanized pipe, some of the hot water pipe is galvanized pipe.
Product Name | Stainless Steel Pipe |
Material | Stainless Steel |
Pipe Length | Single Random Length and double Random Length. |
SRL:3M-5.8M DRL:10-11.8M or As clients requested length | |
Size | Size 1/4” to 24” Outside Diameter 13.7 mm to 609.6 mm |
Wall thickness | SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS |
Standard | ASTM A 335 Grade P1, P2, P5, P9, P9A, P11, P22. ASTM A213 T1B, T1, T2, T5, T9, T9A, T11, T12, T22. A199 T5, T9, T11, T22. BS 3604 Grade 621, 622, 625, 629-470, 629-590, 660, 762. DIN 17175 15 Mo 3, 13 Cr Mo 44, 10 Cr Mo 910, 14 Mo V 63, X 20 Cr Mo V 121. BS 3059 Grade 243, 620-460, 622-490, 629-470, 629-590, 762. JISG3458/G3462/3467 and DIN17175-79. |
Applications | 1.Fluid pipe 2. Power Plant 3. Structure pipe 4. High and low pressure Boiler tube 5. Seamless steel tubes for petroleum cracking 6. Conduit pipe 7. Scaffolding pipe pharmaceutical and ship building etc |
Certificate | ISO/PED/TUV/SGS/LR/BV |
Main Market | Asia, Middle East, Europe, America, Africa, Australia, etc |
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
3,000,000-10,000,000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicia... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicia...
Get in touch with us
Leave a Message, we will call you back quickly!